## Key takeaways

- NEXTDC Triples Contracted Capacity to 740.1 MW and Plans A$5.25-5.75 Billion of FY2027 Capex
- Liquid-Cooled AI Halls Take 55% of Spending by 2035
- A 67 GW Pipeline Against 27% Grid Connection Use
- Upgrading the Installed Base: USD 539.14 million to USD 3.19 billion

**Frequently Asked Questions**

**What is the size of the Australia Data Center Infrastructure Market in 2026?**

USD 4.73 billion in 2026, up 28.25% from USD 3.69 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 12.48 billion by 2035, a CAGR of 12.96% from 2025.

**How fast is the Australia Data Center Infrastructure Market growing?**

12.96% a year from 2025 to 2035, after 22.67% a year from 2020 to 2025. New IT capacity added each year rises from 300 MW in 2025 to 620 MW in 2030 and 740 MW in 2035.

**How much does data center infrastructure cost per MW in Australia?**

USD 10.50 million per MW of new IT capacity in 2025, about A$16.15 million: electrical USD 4.00 million, mechanical and cooling USD 2.90 million, shell USD 2.50 million and racks and fit-out USD 1.10 million (DC Market Insights estimate).

**Which segment of Australia data center infrastructure grows fastest?**

Racks above 40 kW, at 26.31% a year, from USD 664.05 million in 2025 to USD 6.86 billion in 2035, because AI campuses need liquid cooling. Electrical infrastructure is the largest component at USD 1.20 billion.

**Which Australian state leads data center infrastructure spending?**

New South Wales, with USD 2.29 billion or 62.00% of 2025 spending, led by Western Sydney. Queensland grows fastest at 18.40% a year and Victoria rises from 27.00% to 32.80% of spending by 2035.

**How much data center capacity is installed in Australia?**

About 1,571 MW of IT capacity at the end of 2025, rising to about 3,999 MW in 2030 and 7,226 MW by 2035 (DC Market Insights estimate). AEMO counted about 5 TWh of data center use in the National Electricity Market in FY2026.

**How much capacity are NEXTDC, CDC and Macquarie Technology building?**

About 1,156 MW at three listed operators: NEXTDC 537 MW in progress, CDC 572 MW under construction and Macquarie Technology 47 MW. At 2026 content per MW that is about USD 12.36 billion of infrastructure still to buy (DC Market Insights estimate).

**Who are the leading companies in the Australia Data Center Infrastructure Market?**

Schneider Electric, Vertiv, ABB, Eaton and Siemens supply about 41% of electrical and cooling equipment value (DC Market Insights estimate). Hitachi Energy, Legrand, Cummins, Caterpillar, Johnson Controls, Carrier and Trane Technologies follow.

**Which rules shape data center infrastructure in Australia?**

Four main sets: the National Expectations for Data Centres and AI Infrastructure of 23 March 2026, the draft NSW Data Centre Policy Framework of August 2026 with 75-day assessment, AEMO's grid connection process and the Hosting Certification Framework for government data.

**Why do Australia Data Center Infrastructure Market estimates differ?**

USD 4.73 billion in 2026 counts facility systems only: power, cooling, shell, racks and lifecycle work. Estimates that add servers, storage, land or grid connection charges, or count whole campuses when announced, come out two to three times higher.

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 3,690 | USD million |
| Revenue CAGR | 12.96 | % |
| Market size 2035 | 12,480 | USD million |

## Frequently asked questions

### What is the size of the Australia Data Center Infrastructure Market in 2026?

USD 4.73 billion in 2026, up 28.25% from USD 3.69 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 12.48 billion by 2035, a CAGR of 12.96% from 2025.

### How fast is the Australia Data Center Infrastructure Market growing?

12.96% a year from 2025 to 2035, after 22.67% a year from 2020 to 2025. New IT capacity added each year rises from 300 MW in 2025 to 620 MW in 2030 and 740 MW in 2035.

### How much does data center infrastructure cost per MW in Australia?

USD 10.50 million per MW of new IT capacity in 2025, about A$16.15 million: electrical USD 4.00 million, mechanical and cooling USD 2.90 million, shell USD 2.50 million and racks and fit-out USD 1.10 million (DC Market Insights estimate).

### Which segment of Australia data center infrastructure grows fastest?

Racks above 40 kW, at 26.31% a year, from USD 664.05 million in 2025 to USD 6.86 billion in 2035, because AI campuses need liquid cooling. Electrical infrastructure is the largest component at USD 1.20 billion.

### Which Australian state leads data center infrastructure spending?

New South Wales, with USD 2.29 billion or 62.00% of 2025 spending, led by Western Sydney. Queensland grows fastest at 18.40% a year and Victoria rises from 27.00% to 32.80% of spending by 2035.

### How much data center capacity is installed in Australia?

About 1,571 MW of IT capacity at the end of 2025, rising to about 3,999 MW in 2030 and 7,226 MW by 2035 (DC Market Insights estimate). AEMO counted about 5 TWh of data center use in the National Electricity Market in FY2026.

### How much capacity are NEXTDC, CDC and Macquarie Technology building?

About 1,156 MW at three listed operators: NEXTDC 537 MW in progress, CDC 572 MW under construction and Macquarie Technology 47 MW. At 2026 content per MW that is about USD 12.36 billion of infrastructure still to buy (DC Market Insights estimate).

### Who are the leading companies in the Australia Data Center Infrastructure Market?

Schneider Electric, Vertiv, ABB, Eaton and Siemens supply about 41% of electrical and cooling equipment value (DC Market Insights estimate). Hitachi Energy, Legrand, Cummins, Caterpillar, Johnson Controls, Carrier and Trane Technologies follow.

### Which rules shape data center infrastructure in Australia?

Four main sets: the National Expectations for Data Centres and AI Infrastructure of 23 March 2026, the draft NSW Data Centre Policy Framework of August 2026 with 75-day assessment, AEMO's grid connection process and the Hosting Certification Framework for government data.

### Why do Australia Data Center Infrastructure Market estimates differ?

USD 4.73 billion in 2026 counts facility systems only: power, cooling, shell, racks and lifecycle work. Estimates that add servers, storage, land or grid connection charges, or count whole campuses when announced, come out two to three times higher.