## Key takeaways

- Nebius and Mega DC Put 80 MW of AI Halls into Construction
- Halls Above 50 kW per Rack Move to Liquid Cooling
- The Electricity Authority Freeze on 8 MW-Plus Connections
- Negev Campuses: Beersheba, Kiryat Gat and Dimona

**Frequently Asked Questions**

**What is the size of the Israel Data Center Infrastructure Market in 2026?**

USD 1.01 billion in 2026, up 93.26% from USD 522.08 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 2.34 billion by 2035, a CAGR of 16.18% from 2025, as about 1,500 MW of committed grid connections are built out.

**How fast is the Israel Data Center Infrastructure Market growing?**

16.18% a year from 2025 to 2035, after 23.60% a year from 2020 to 2025. Spend peaks at USD 2.64 billion in 2030, when new IT capacity reaches 210 MW, then eases as committed grid capacity runs out.

**What does Israel data center infrastructure include?**

USD 522.08 million of 2025 facility spend: electrical power, mechanical and cooling, civil shell, racks and white-space fit-out, and lifecycle services. Servers, storage, network switches, DCIM software, land and electricity are excluded.

**How much does a data center cost per MW in Israel?**

USD 10.01 million per MW of IT capacity in 2025, blending USD 9.20 million for conventional halls and USD 11.00 million for AI halls. An underground AI hall costs about USD 11.99 million per MW (DC Market Insights estimate).

**Why did Israel freeze data center grid connections?**

About 27,000 MW of data center connection requests met roughly 1,500 MW already committed, so the Electricity Authority froze reviews for server farms of 8 MW and above from 20 July to 7 December 2026 under Decision 74506.

**Which infrastructure type is largest in Israel?**

Electrical Power Infrastructure, with 38.0% of 2025 value, because AI halls need dedicated substations, UPS systems and generators. Lifecycle Services and Upgrades grow fastest at 23.39% a year.

**Which Israeli district grows fastest?**

The Southern District, at 29.04% a year from 2025 to 2035, as Negev campuses in Beersheba, Kiryat Gat and Dimona add capacity. The Central District still leads 2025 spend with 58.0%.

**Who are the leading suppliers of data center infrastructure in Israel?**

Schneider Electric leads with about 14% of 2025 spend, and the top five suppliers (Schneider Electric, Vertiv, ABB, Eaton and Siemens) hold about 48% (DC Market Insights estimate). MedOne, EdgeConneX, Mega DC and Serverfarm are the main developers.

**Why do Israel Data Center Infrastructure Market estimates differ?**

USD 1.01 billion in 2026 counts the facility layer only. Estimates that add servers, storage and network equipment, such as the earlier DC Market Insights edition, are about 60% larger for 2025.

**How big will Israel data center infrastructure be in 2035 in a low or high case?**

Between USD 1.75 billion and USD 2.96 billion in 2035, around a base case of USD 2.34 billion. The low case assumes a 200 MVA connection cap; the high case assumes a Negev AI park with new generation.

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 522.08 | USD million |
| Revenue CAGR | 16.18 | % |
| Market size 2035 | 2,340 | USD million |

## Frequently asked questions

### What is the size of the Israel Data Center Infrastructure Market in 2026?

USD 1.01 billion in 2026, up 93.26% from USD 522.08 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 2.34 billion by 2035, a CAGR of 16.18% from 2025, as about 1,500 MW of committed grid connections are built out.

### How fast is the Israel Data Center Infrastructure Market growing?

16.18% a year from 2025 to 2035, after 23.60% a year from 2020 to 2025. Spend peaks at USD 2.64 billion in 2030, when new IT capacity reaches 210 MW, then eases as committed grid capacity runs out.

### What does Israel data center infrastructure include?

USD 522.08 million of 2025 facility spend: electrical power, mechanical and cooling, civil shell, racks and white-space fit-out, and lifecycle services. Servers, storage, network switches, DCIM software, land and electricity are excluded.

### How much does a data center cost per MW in Israel?

USD 10.01 million per MW of IT capacity in 2025, blending USD 9.20 million for conventional halls and USD 11.00 million for AI halls. An underground AI hall costs about USD 11.99 million per MW (DC Market Insights estimate).

### Why did Israel freeze data center grid connections?

About 27,000 MW of data center connection requests met roughly 1,500 MW already committed, so the Electricity Authority froze reviews for server farms of 8 MW and above from 20 July to 7 December 2026 under Decision 74506.

### Which infrastructure type is largest in Israel?

Electrical Power Infrastructure, with 38.0% of 2025 value, because AI halls need dedicated substations, UPS systems and generators. Lifecycle Services and Upgrades grow fastest at 23.39% a year.

### Which Israeli district grows fastest?

The Southern District, at 29.04% a year from 2025 to 2035, as Negev campuses in Beersheba, Kiryat Gat and Dimona add capacity. The Central District still leads 2025 spend with 58.0%.

### Who are the leading suppliers of data center infrastructure in Israel?

Schneider Electric leads with about 14% of 2025 spend, and the top five suppliers (Schneider Electric, Vertiv, ABB, Eaton and Siemens) hold about 48% (DC Market Insights estimate). MedOne, EdgeConneX, Mega DC and Serverfarm are the main developers.

### Why do Israel Data Center Infrastructure Market estimates differ?

USD 1.01 billion in 2026 counts the facility layer only. Estimates that add servers, storage and network equipment, such as the earlier DC Market Insights edition, are about 60% larger for 2025.

### How big will Israel data center infrastructure be in 2035 in a low or high case?

Between USD 1.75 billion and USD 2.96 billion in 2035, around a base case of USD 2.34 billion. The low case assumes a 200 MVA connection cap; the high case assumes a Negev AI park with new generation.