> Japan Data Center Infrastructure Market: USD 12,065.43 million in 2026, USD 29,912.86 million by 2035, 10.29% CAGR from 2025, on 291 MW of new IT in 2025.

Publisher: DC Market Insights  
Author: DC Market Insights Research Desk  
Published: 2025-12-17  
Last updated: 2026-11-18  
Next review: May 2027  
Page: https://www.dcmarketinsights.com/report/japan-data-center-infrastructure-market

## Key takeaways

- GX strategy areas in Hokkaido and Kyushu

**Frequently Asked Questions**

**What is the size of the Japan Data Center Infrastructure Market in 2026?**

USD 12,065.43 million in 2026, up from USD 11,231.26 million in 2025, according to DC Market Insights. The market reaches USD 29,912.86 million by 2035.

**How big will the Japan Data Center Infrastructure Market be by 2035, and at what CAGR?**

USD 29,912.86 million by 2035, a CAGR of 10.29% from 2025 (10.61% from 2026), as installed IT capacity rises from 2,575 MW to 6,138 MW.

**What does the Japan Data Center Infrastructure Market include?**

Annual capital spend on electrical, mechanical, civil, structural and architectural, and IT and network infrastructure in Japan, in new builds and retrofits, across hyperscale, colocation, enterprise and edge data centers. Land, operating costs, O&M services, software, cloud services and stand-alone design fees are excluded.

**Why is this market larger than the earlier estimate?**

USD 11,231.26 million in 2025 because the report was rebuilt in November 2026 on a bottom-up capacity model; the earlier edition counted facility spend only partly and left out IT refresh.

**Which segment leads the Japan Data Center Infrastructure Market?**

IT and Network, 66.6% of 2025 spend (USD 7,481.59 million). Among facility types, Electrical is largest at 15.0%.

**Which region leads data center infrastructure spend in Japan?**

Kanto, USD 6,978.67 million or 62.1% of 2025 spend, led by Tokyo and Inzai. Hokkaido grows fastest at 22.70% a year.

**How much does data center infrastructure cost per MW in Japan?**

About USD 23.81 million per MW of new IT capacity in 2025: USD 11.31 million of facility and USD 12.50 million of IT and network (DC Market Insights estimate).

**Who are the leading suppliers in the Japan Data Center Infrastructure Market?**

Schneider Electric, Mitsubishi Electric, Fuji Electric, Hitachi and Vertiv in power and cooling; Kajima, Obayashi, Taisei, Shimizu and Takenaka as builders; Fujitsu, NEC, Dell Technologies and HPE in IT and network.

**What rules shape data center infrastructure in Japan?**

The Energy Conservation Act sets a PUE 1.4 benchmark by FY2030 and PUE 1.3 for data centers built from FY2029; Watt-Bit and GX strategy areas steer new sites to regions with grid headroom.

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 11,231.26 | USD million |
| Revenue CAGR | 10.29 | % |
| Market size 2035 | 29,912.86 | USD million |

## Frequently asked questions

### What is the size of the Japan Data Center Infrastructure Market in 2026?

USD 12,065.43 million in 2026, up from USD 11,231.26 million in 2025, according to DC Market Insights. The market reaches USD 29,912.86 million by 2035.

### How big will the Japan Data Center Infrastructure Market be by 2035, and at what CAGR?

USD 29,912.86 million by 2035, a CAGR of 10.29% from 2025 (10.61% from 2026), as installed IT capacity rises from 2,575 MW to 6,138 MW.

### What does the Japan Data Center Infrastructure Market include?

Annual capital spend on electrical, mechanical, civil, structural and architectural, and IT and network infrastructure in Japan, in new builds and retrofits, across hyperscale, colocation, enterprise and edge data centers. Land, operating costs, O&M services, software, cloud services and stand-alone design fees are excluded.

### Why is this market larger than the earlier estimate?

USD 11,231.26 million in 2025 because the report was rebuilt in November 2026 on a bottom-up capacity model; the earlier edition counted facility spend only partly and left out IT refresh.

### Which segment leads the Japan Data Center Infrastructure Market?

IT and Network, 66.6% of 2025 spend (USD 7,481.59 million). Among facility types, Electrical is largest at 15.0%.

### Which region leads data center infrastructure spend in Japan?

Kanto, USD 6,978.67 million or 62.1% of 2025 spend, led by Tokyo and Inzai. Hokkaido grows fastest at 22.70% a year.

### How much does data center infrastructure cost per MW in Japan?

About USD 23.81 million per MW of new IT capacity in 2025: USD 11.31 million of facility and USD 12.50 million of IT and network (DC Market Insights estimate).

### Who are the leading suppliers in the Japan Data Center Infrastructure Market?

Schneider Electric, Mitsubishi Electric, Fuji Electric, Hitachi and Vertiv in power and cooling; Kajima, Obayashi, Taisei, Shimizu and Takenaka as builders; Fujitsu, NEC, Dell Technologies and HPE in IT and network.

### What rules shape data center infrastructure in Japan?

The Energy Conservation Act sets a PUE 1.4 benchmark by FY2030 and PUE 1.3 for data centers built from FY2029; Watt-Bit and GX strategy areas steer new sites to regions with grid headroom.

## How to cite