# Malaysia Data Center Infrastructure Market

> Malaysia Data Center Infrastructure Market valued at USD 5.48 billion in 2026, forecast to reach USD 8.84 billion by 2035 at 5.95% CAGR, led by Johor.

Publisher: DC Market Insights  
Author: Amit Jain, DC Market Insights  
Published: 2025-12-17  
Last updated: 2026-10-15  
Next review: Apr 2027  
Page: https://www.dcmarketinsights.com/report/malaysia-data-center-infrastructure-market

## Key takeaways

- Hyperscale commitments worth more than USD 16 billion
- Liquid cooling moves from pilot to standard in AI halls
- Johor stops approving Tier I and Tier II data centers
- AI halls: USD 1.72 billion to USD 5.62 billion

**Frequently Asked Questions**

**How big is the Malaysia Data Center Infrastructure Market in 2026?**

USD 5.48 billion in 2026, up 10.46% from USD 4.96 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 8.84 billion by 2035, a CAGR of 5.95% from 2025 to 2035.

**What is the size of the Malaysia Data Center Infrastructure Market in 2025 and 2035?**

USD 4.96 billion in 2025 and USD 8.84 billion by 2035 (DC Market Insights estimate), after USD 329.76 million in 2020. The 2025 figure is the build cost of about 495 MW of new IT capacity plus upgrades on the installed base.

**What is the growth rate of the Malaysia Data Center Infrastructure Market?**

5.95% a year from 2025 to 2035 (DC Market Insights estimate), slower than the 71.97% of 2020-2025 because new capacity peaks at 640 MW in 2030 while the AI share of new halls rises from 30% to 65%.

**What is the Malaysia Data Center Infrastructure Market?**

USD 4.96 billion of capital spend in 2025 on the physical infrastructure of Malaysian data centers: electrical systems, cooling, civil and architectural works, and IT and network infrastructure such as racks and cabling. Land, servers and service revenue are excluded.

**Which infrastructure type leads the Malaysia Data Center Infrastructure Market?**

Electrical Infrastructure, with 40.99% of base-year spend (USD 2.03 billion), because substations, switchgear, UPS systems and generators carry most of the cost of each MW (DC Market Insights estimate).

**What is the fastest-growing segment of the Malaysia Data Center Infrastructure Market?**

AI Halls, at 12.61% a year from USD 1.72 billion in the base year to USD 5.62 billion by 2035 (DC Market Insights estimate), as liquid-cooled racks need more power and cooling per MW.

**How much does data center infrastructure cost per MW in Malaysia?**

About USD 8.95 million per MW for a conventional hall and USD 11.50 million per MW for an AI hall in the base year (DC Market Insights estimate). A construction cost index put Malaysia at USD 11.37 per watt including fees.

**Which region leads the Malaysia Data Center Infrastructure Market?**

Johor, with 76.42% of 2025 spend (USD 3.79 billion). Negeri Sembilan is the fastest-growing region at 16.25% a year as hyperscale builds move to Port Dickson (DC Market Insights estimate).

**What is the data center power capacity of Malaysia in MW?**

About 1,000 MW of operational IT capacity at the end of 2025, up from about 340 MW in 2023 (DC Market Insights estimate). Johor alone reached 1,110 MW in the first half of 2026, and TNB has contracted 8.35 GW of data center demand.

**How much data center investment has Malaysia approved?**

RM144.4 billion across 25 approved data center projects up to 31 March 2025, according to the Ministry of Investment, Trade and Industry. Only the share spent on power, cooling, shell and fit-out in the year a MW is built counts in this market.

**Which data centers in Malaysia offer liquid cooling for AI workloads?**

YTL Power's Green Data Center Park at Kulai runs liquid-cooled Nvidia GB200 NVL72 systems, completed in October 2025. Carrier-neutral colocation sites in Johor and Cyberjaya link AI racks to the AWS, Google and Microsoft cloud regions for hybrid cloud AI.

**Who are the leading companies in the Malaysia Data Center Infrastructure Market?**

AirTrunk leads with about 11% of 2025 spend, and AirTrunk, YTL Power and Bridge Data Centres together direct about 29% (DC Market Insights assessment). Gamuda, Sunway Construction, Vertiv and Schneider Electric are leading contractors and suppliers.

**How is data center infrastructure in Malaysia financed?**

RM144.4 billion of data center investment was approved by 31 March 2025, funded by sponsor equity, green loans such as Princeton Digital Group's RM1.28 billion loan for JH1, and hyperscaler balance sheets. Only the infrastructure built each year counts in the USD 4.96 billion 2025 market.

**What share of Malaysia data center infrastructure spend is mechanical and cooling equipment?**

USD 1.30 billion of 2025 spend is Mechanical Infrastructure, covering chillers, cooling towers, dry coolers, computer room air handlers, in-row cooling, coolant distribution units and liquid-cooling loops (DC Market Insights estimate). It is the fastest-growing infrastructure type at 7.25% a year.

**How much data center capacity is under construction in Johor?**

602 MW is under construction in Johor, alongside 1,110 MW operational and 2,486 MW planned in the first half of 2026 (Source: Cushman and Wakefield, reported by EdgeProp, August 2026). Operational IT capacity there rose 24% from the second half of 2025.

**Which Malaysian hub spends the most on data center infrastructure?**

Kulai and Sedenak in Johor, at USD 1.44 billion in 2025 (DC Market Insights estimate). Iskandar Puteri and Nusajaya follows in second place within Johor. Johor as a whole takes 76.42% of 2025 spend, while Negeri Sembilan grows fastest at 16.25% a year.

## Market by region (USD million)

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 4,960 | USD million |
| Revenue CAGR | 5.95 | % |
| Market size 2035 | 8,840 | USD million |

## Frequently asked questions

### How big is the Malaysia Data Center Infrastructure Market in 2026?

USD 5.48 billion in 2026, up 10.46% from USD 4.96 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 8.84 billion by 2035, a CAGR of 5.95% from 2025 to 2035.

### What is the size of the Malaysia Data Center Infrastructure Market in 2025 and 2035?

USD 4.96 billion in 2025 and USD 8.84 billion by 2035 (DC Market Insights estimate), after USD 329.76 million in 2020. The 2025 figure is the build cost of about 495 MW of new IT capacity plus upgrades on the installed base.

### What is the growth rate of the Malaysia Data Center Infrastructure Market?

5.95% a year from 2025 to 2035 (DC Market Insights estimate), slower than the 71.97% of 2020-2025 because new capacity peaks at 640 MW in 2030 while the AI share of new halls rises from 30% to 65%.

### What is the Malaysia Data Center Infrastructure Market?

USD 4.96 billion of capital spend in 2025 on the physical infrastructure of Malaysian data centers: electrical systems, cooling, civil and architectural works, and IT and network infrastructure such as racks and cabling. Land, servers and service revenue are excluded.

### Which infrastructure type leads the Malaysia Data Center Infrastructure Market?

Electrical Infrastructure, with 40.99% of base-year spend (USD 2.03 billion), because substations, switchgear, UPS systems and generators carry most of the cost of each MW (DC Market Insights estimate).

### What is the fastest-growing segment of the Malaysia Data Center Infrastructure Market?

AI Halls, at 12.61% a year from USD 1.72 billion in the base year to USD 5.62 billion by 2035 (DC Market Insights estimate), as liquid-cooled racks need more power and cooling per MW.

### How much does data center infrastructure cost per MW in Malaysia?

About USD 8.95 million per MW for a conventional hall and USD 11.50 million per MW for an AI hall in the base year (DC Market Insights estimate). A construction cost index put Malaysia at USD 11.37 per watt including fees.

### Which region leads the Malaysia Data Center Infrastructure Market?

Johor, with 76.42% of 2025 spend (USD 3.79 billion). Negeri Sembilan is the fastest-growing region at 16.25% a year as hyperscale builds move to Port Dickson (DC Market Insights estimate).

### What is the data center power capacity of Malaysia in MW?

About 1,000 MW of operational IT capacity at the end of 2025, up from about 340 MW in 2023 (DC Market Insights estimate). Johor alone reached 1,110 MW in the first half of 2026, and TNB has contracted 8.35 GW of data center demand.

### How much data center investment has Malaysia approved?

RM144.4 billion across 25 approved data center projects up to 31 March 2025, according to the Ministry of Investment, Trade and Industry. Only the share spent on power, cooling, shell and fit-out in the year a MW is built counts in this market.

### Which data centers in Malaysia offer liquid cooling for AI workloads?

YTL Power's Green Data Center Park at Kulai runs liquid-cooled Nvidia GB200 NVL72 systems, completed in October 2025. Carrier-neutral colocation sites in Johor and Cyberjaya link AI racks to the AWS, Google and Microsoft cloud regions for hybrid cloud AI.

### Who are the leading companies in the Malaysia Data Center Infrastructure Market?

AirTrunk leads with about 11% of 2025 spend, and AirTrunk, YTL Power and Bridge Data Centres together direct about 29% (DC Market Insights assessment). Gamuda, Sunway Construction, Vertiv and Schneider Electric are leading contractors and suppliers.

### How is data center infrastructure in Malaysia financed?

RM144.4 billion of data center investment was approved by 31 March 2025, funded by sponsor equity, green loans such as Princeton Digital Group's RM1.28 billion loan for JH1, and hyperscaler balance sheets. Only the infrastructure built each year counts in the USD 4.96 billion 2025 market.

### What share of Malaysia data center infrastructure spend is mechanical and cooling equipment?

USD 1.30 billion of 2025 spend is Mechanical Infrastructure, covering chillers, cooling towers, dry coolers, computer room air handlers, in-row cooling, coolant distribution units and liquid-cooling loops (DC Market Insights estimate). It is the fastest-growing infrastructure type at 7.25% a year.

### How much data center capacity is under construction in Johor?

602 MW is under construction in Johor, alongside 1,110 MW operational and 2,486 MW planned in the first half of 2026 (Source: Cushman and Wakefield, reported by EdgeProp, August 2026). Operational IT capacity there rose 24% from the second half of 2025.

### Which Malaysian hub spends the most on data center infrastructure?

Kulai and Sedenak in Johor, at USD 1.44 billion in 2025 (DC Market Insights estimate). Iskandar Puteri and Nusajaya follows in second place within Johor. Johor as a whole takes 76.42% of 2025 spend, while Negeri Sembilan grows fastest at 16.25% a year.

## How to cite

Data Center Market Research & Consulting | DC Market Insights, "Malaysia Data Center Infrastructure Market", updated 2026-10-15, https://www.dcmarketinsights.com/report/malaysia-data-center-infrastructure-market