## Key takeaways

- CFE transmission in the Bajío lags campus plans
- Operations and lifecycle services for a 1,241 MW AI base

**Frequently Asked Questions**

**What is the size of the Mexico AI Data Center Market in 2026?**

USD 515.23 million in 2026, up 90.15% from USD 270.96 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 2.29 billion by 2035, a CAGR of 23.80% from 2025, as Querétaro campuses get CFE power.

**What is the Mexico AI Data Center Market?**

USD 270.96 million of 2025 facility spend on halls for AI training and inference in Mexico: electrical systems, cooling, shell and racks, AI network fabric, and operations services. GPU servers, land, electricity, colocation rent and AI software such as data science platforms are excluded.

**Which segment of the Mexico AI Data Center Market grows fastest?**

Operations Services and Software grows fastest at 58.50% a year, from USD 5.54 million in 2025 to USD 554.52 million in 2035, because the installed AI base rises from 32 MW to 1,241 MW. Electrical Infrastructure is the largest component at 35.26% of 2025 spend.

**How much does an AI data center megawatt cost in Mexico?**

About USD 10.00 million per AI MW in 2025 for facility infrastructure before GPU servers, rising to USD 12.19 million by 2035 (DC Market Insights estimate). ODATA QR03 at more than USD 3 billion for up to 300 MW implies a similar USD 10.0 million per MW.

**Which region leads the Mexico AI Data Center Market?**

USD 195.09 million, 72% of 2025 spend, goes to the Bajío (Querétaro and Guanajuato), the leading region. North-Central and Northwest Mexico grows fastest at 48.09% a year because Fermaca's 250 MW Durango campus has power outside the Bajío grid.

**How much data center capacity does Mexico have?**

279 MW of installed data center capacity in 2026, up from 115 MW in 2023, with 205 MW under construction, according to MEXDC. DC Market Insights models 1,175 MW by 2030 and 2,351 MW by 2035, of which 1,241 MW is AI capacity.

**Who are the leading companies in the Mexico AI Data Center Market?**

About 13% of 2025 equipment and services value goes to Schneider Electric, the leader, and the top five suppliers hold about 45% (DC Market Insights estimate). ODATA, CloudHQ, KIO Data Centers, AWS, Microsoft, Google and Oracle lead on the buyer side.

**What limits AI data center growth in Mexico?**

Up to 800 MW of new transmission is what CFE plans for Querétaro, with about MXN 9 billion of grid works in 2026-2030, while 1,705 MW of data center demand is under review. A slower grid build cuts the 2035 value to USD 1.53 billion in the low case.

**Why do Mexico AI Data Center Market estimates differ?**

USD 515.23 million in 2026 is facility spend only. Estimates that add GPU servers, cloud AI revenue, colocation rent or AI software come out several times larger; the previous edition of this page, which mixed hardware, software and services, showed USD 582.42 million for 2025.

**Is the Mexico AI Data Center Market the same as a data science platform market?**

USD 270.96 million of 2025 spend covers power, cooling, buildings and AI network fabric for data centers, so the answer is no. Data science platforms and AI data management tools are analytics software that runs on those halls, so they fall outside this market.

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 270.96 | USD million |
| Revenue CAGR | 23.8 | % |
| Market size 2035 | 2,290 | USD million |

## Frequently asked questions

### What is the size of the Mexico AI Data Center Market in 2026?

USD 515.23 million in 2026, up 90.15% from USD 270.96 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 2.29 billion by 2035, a CAGR of 23.80% from 2025, as Querétaro campuses get CFE power.

### What is the Mexico AI Data Center Market?

USD 270.96 million of 2025 facility spend on halls for AI training and inference in Mexico: electrical systems, cooling, shell and racks, AI network fabric, and operations services. GPU servers, land, electricity, colocation rent and AI software such as data science platforms are excluded.

### Which segment of the Mexico AI Data Center Market grows fastest?

Operations Services and Software grows fastest at 58.50% a year, from USD 5.54 million in 2025 to USD 554.52 million in 2035, because the installed AI base rises from 32 MW to 1,241 MW. Electrical Infrastructure is the largest component at 35.26% of 2025 spend.

### How much does an AI data center megawatt cost in Mexico?

About USD 10.00 million per AI MW in 2025 for facility infrastructure before GPU servers, rising to USD 12.19 million by 2035 (DC Market Insights estimate). ODATA QR03 at more than USD 3 billion for up to 300 MW implies a similar USD 10.0 million per MW.

### Which region leads the Mexico AI Data Center Market?

USD 195.09 million, 72% of 2025 spend, goes to the Bajío (Querétaro and Guanajuato), the leading region. North-Central and Northwest Mexico grows fastest at 48.09% a year because Fermaca's 250 MW Durango campus has power outside the Bajío grid.

### How much data center capacity does Mexico have?

279 MW of installed data center capacity in 2026, up from 115 MW in 2023, with 205 MW under construction, according to MEXDC. DC Market Insights models 1,175 MW by 2030 and 2,351 MW by 2035, of which 1,241 MW is AI capacity.

### Who are the leading companies in the Mexico AI Data Center Market?

About 13% of 2025 equipment and services value goes to Schneider Electric, the leader, and the top five suppliers hold about 45% (DC Market Insights estimate). ODATA, CloudHQ, KIO Data Centers, AWS, Microsoft, Google and Oracle lead on the buyer side.

### What limits AI data center growth in Mexico?

Up to 800 MW of new transmission is what CFE plans for Querétaro, with about MXN 9 billion of grid works in 2026-2030, while 1,705 MW of data center demand is under review. A slower grid build cuts the 2035 value to USD 1.53 billion in the low case.

### Why do Mexico AI Data Center Market estimates differ?

USD 515.23 million in 2026 is facility spend only. Estimates that add GPU servers, cloud AI revenue, colocation rent or AI software come out several times larger; the previous edition of this page, which mixed hardware, software and services, showed USD 582.42 million for 2025.

### Is the Mexico AI Data Center Market the same as a data science platform market?

USD 270.96 million of 2025 spend covers power, cooling, buildings and AI network fabric for data centers, so the answer is no. Data science platforms and AI data management tools are analytics software that runs on those halls, so they fall outside this market.