# U.S. Edge Data Center Market

> U.S. edge data center market: USD 4.88 billion in 2026, USD 12.75 billion by 2035, 11.70% CAGR from 2025, led by AI inference near users.

Publisher: DC Market Insights  
Author: Amit Jain, DC Market Insights  
Published: 2025-10-21  
Last updated: 2025-10-27  
Next review: Apr 2027  
Page: https://www.dcmarketinsights.com/report/us-edge-data-center-market

## Key takeaways

- USD 2.64 Billion of Secondary-Metro Financing in Ten Months
- About 98,963 U.S. Towers, Few Edge Sites Yet
- Small Sites Lose More Power: UPS Efficiency of 77-85%
- Rural Broadband Creates Local Compute Demand

**Frequently Asked Questions**

**What is the size of the U.S. Edge Data Center Market in 2026?**

USD 4.88 billion in 2026, up 15.76% from USD 4.22 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 12.75 billion by 2035, a CAGR of 11.70% from 2025.

**How fast is the U.S. Edge Data Center Market growing?**

11.70% a year from 2025 to 2035, after 18.68% a year from 2020 to 2025, as installed U.S. edge IT load rises from 2,250 MW to 6,300 MW.

**What is an edge data center in the U.S.?**

A facility of up to 5 MW of IT load placed near users: regional colocation in Tier 2 and Tier 3 metros, telecom and tower-base sites, and prefabricated micro data centers. DC Market Insights counts 2,250 MW of such load in 2025.

**How much does edge data center colocation cost per kW?**

About USD 215 per kW per month in 2025, rising to USD 235 by 2035 (DC Market Insights estimate), with metered power at about 13.41 cents per kWh billed on top.

**Which segment leads the U.S. Edge Data Center Market?**

Colocation and Interconnection Services, with USD 2.17 billion or 51.53% of 2025 value, because operators bill space and power every month while build spend is paid once.

**Which application grows fastest in U.S. edge data centers?**

AI Inference, at 27.90% a year from USD 337.44 million in 2025 to USD 3.95 billion in 2035, as hyperscalers buy 1-10 MW of capacity near users, such as a USD 111 million, 10 MW contract in Columbus, Georgia.

**Which U.S. region leads the edge data center market?**

The Southeast, with USD 1.05 billion or 25.00% of 2025 value. The Southwest grows fastest at 14.22% a year, and Arizona is the fastest large state at 15.31%.

**Which state has the largest edge data center market in the U.S.?**

Texas, with USD 413.36 million in 2025 and USD 1.63 billion by 2035, where Duos Edge AI concentrates its pods and land and grid capacity are easier to secure.

**Who are the leading U.S. edge data center companies?**

Centersquare, DataBank, Flexential, TierPoint and 365 Data Centers hold about 36% of 2025 value together (DC Market Insights estimate); Duos Edge AI, American Tower, SBA Communications and EdgeConneX also compete.

**Why do U.S. Edge Data Center Market estimates differ?**

USD 4.88 billion in 2026 is the DC Market Insights figure for sites of up to 5 MW, without IT equipment. Estimates that add edge servers, 5G gear, content delivery or larger campuses come out several times higher.

## Dataset

| Series | Value | Unit |
| --- | --- | --- |
| Market size 2025 | 4,220 | USD million |
| Revenue CAGR | 11.7 | % |
| Market size 2035 | 12,750 | USD million |

## Frequently asked questions

### What is the size of the U.S. Edge Data Center Market in 2026?

USD 4.88 billion in 2026, up 15.76% from USD 4.22 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 12.75 billion by 2035, a CAGR of 11.70% from 2025.

### How fast is the U.S. Edge Data Center Market growing?

11.70% a year from 2025 to 2035, after 18.68% a year from 2020 to 2025, as installed U.S. edge IT load rises from 2,250 MW to 6,300 MW.

### What is an edge data center in the U.S.?

A facility of up to 5 MW of IT load placed near users: regional colocation in Tier 2 and Tier 3 metros, telecom and tower-base sites, and prefabricated micro data centers. DC Market Insights counts 2,250 MW of such load in 2025.

### How much does edge data center colocation cost per kW?

About USD 215 per kW per month in 2025, rising to USD 235 by 2035 (DC Market Insights estimate), with metered power at about 13.41 cents per kWh billed on top.

### Which segment leads the U.S. Edge Data Center Market?

Colocation and Interconnection Services, with USD 2.17 billion or 51.53% of 2025 value, because operators bill space and power every month while build spend is paid once.

### Which application grows fastest in U.S. edge data centers?

AI Inference, at 27.90% a year from USD 337.44 million in 2025 to USD 3.95 billion in 2035, as hyperscalers buy 1-10 MW of capacity near users, such as a USD 111 million, 10 MW contract in Columbus, Georgia.

### Which U.S. region leads the edge data center market?

The Southeast, with USD 1.05 billion or 25.00% of 2025 value. The Southwest grows fastest at 14.22% a year, and Arizona is the fastest large state at 15.31%.

### Which state has the largest edge data center market in the U.S.?

Texas, with USD 413.36 million in 2025 and USD 1.63 billion by 2035, where Duos Edge AI concentrates its pods and land and grid capacity are easier to secure.

### Who are the leading U.S. edge data center companies?

Centersquare, DataBank, Flexential, TierPoint and 365 Data Centers hold about 36% of 2025 value together (DC Market Insights estimate); Duos Edge AI, American Tower, SBA Communications and EdgeConneX also compete.

### Why do U.S. Edge Data Center Market estimates differ?

USD 4.88 billion in 2026 is the DC Market Insights figure for sites of up to 5 MW, without IT equipment. Estimates that add edge servers, 5G gear, content delivery or larger campuses come out several times higher.

## How to cite

Data Center Market Research & Consulting | DC Market Insights, "U.S. Edge Data Center Market", updated 2025-10-27, https://www.dcmarketinsights.com/report/us-edge-data-center-market