Proprietary data

Data Centers in Bangladesh

Every data center in Bangladesh that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 19 data centers in Bangladesh run by 14 operators: 13 operational, 1 under construction and 5 planned. Stated operational capacity is 9 MW, with a further 28.8 MW under construction and 20 MW planned. Felicity IDC Limited (Fiber@Home) holds the largest share of tracked operational capacity (56%).

19Facilities tracked
14Operators
9 MWOperational (13 sites)
28.8 MWUnder construction (1 site)
20 MWPlanned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 4 of 19 facilities have a stated capacity; the others are counted as sites only.

BDCCL Disaster Recovery Data Centre Jashore · Bangladesh Data Center Company Limited (BDCCL) · Jessore (approximate location)Felicity IDC Jashore · Felicity IDC Limited (Fiber@Home) · Jessore (approximate location)Cypher Data Centre · Axentec PLC (Robi Axiata) · Jessore (approximate location)Robi Narayanganj Data Centre · Robi Axiata · Narayanganj (approximate location)Grameenphone Super Core Data Center · Grameenphone · Sylhet (approximate location)Banglalink Gazipur Data Center · Banglalink · Gazipur (approximate location)DataHub Asia Thakurgaon · DataHub Asia · Thakurgaon (approximate location)Dhaka Colo Dhaka · Dhaka Colo Limited · Dhaka (approximate location)Dhaka Colo Chittagong · Dhaka Colo Limited · Chattogram (approximate location)Dhaka Colo Jashore · Dhaka Colo Limited · Jessore (approximate location)Dhaka Colo Khulna · Dhaka Colo Limited · Khulna (approximate location)Meghna Bank Head Office Data Centre · Meghna Bank Limited · Dhaka (approximate location)Bangladesh Green Data Centre (Chattogram) · Government of Bangladesh / BTCL (PPP, ADB-supported) · Chattogram (approximate location)
Operational Under construction Planned

Market snapshot

Bangladesh data center market: key facts

  • Capacity under construction or planned (48.8 MW) is 5.4 times the operational base of 9 MW.
  • The three largest operators by operational capacity, Felicity IDC Limited (Fiber@Home), Grameenphone and Dhaka Colo Limited, hold 100% of tracked operational MW.
  • Yotta Data Services (Hiranandani Group) has the largest development pipeline in Bangladesh: 28.8 MW under construction or planned.
  • The largest operational facility we track is Felicity IDC Kaliakoir (Felicity IDC Limited (Fiber@Home), Kaliakair) at 5 MW.
  • The largest project in the pipeline is Yotta Dhaka Data Center Park (28.8 MW, under construction).
  • Dhaka is the largest cluster: 10 of 19 facilities and 93% of tracked capacity.
  • By type, the tracker lists 13 colocation, 4 enterprise and 2 other facilities.
  • 4 of 19 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational9 MW
Under construction28.8 MW
Planned20 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Bangladesh by tracked capacity, MW

OperationalUnder construction or planned

Capacity by market in Bangladesh, MW
Dhaka53.8 MW
Sylhet4 MW

OperationalUnder construction or planned

Facilities by type
Colocation13
Enterprise4
Other2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Bangladesh

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Dhaka Colo Limited4———
Felicity IDC Limited (Fiber@Home)25 MW—56%
Bangladesh Data Center Company Limited (BDCCL)2———
Grameenphone14 MW—44%
Banglalink1———
Axentec PLC (Robi Axiata)1———
Yotta Data Services (Hiranandani Group)1—28.8 MW—
Robi Axiata1———
Meghna Bank Limited1———
Government of Bangladesh / BTCL (PPP, ADB-supported)1———
DataHub Asia1———
Summit Group1———
Osiris Group / Jatra International1—20 MW—
DataVolt1———

Largest data center projects in Bangladesh

Under construction and planned facilities with a stated capacity, largest first. 28.8 MW under construction and 20 MW planned in total.

ProjectLocationStatusTypeCapacity
Yotta Dhaka Data Center ParkYotta Data Services (Hiranandani Group) Kaliakair Under construction Colocation 28.8 MW
Osiris Group Tier IV Data CenterOsiris Group / Jatra International Kaliakair Planned Colocation 20 MW

How Bangladesh compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
India181291,002 MW4,443 MW
Malaysia64261,206 MW2,761 MW
Singapore4719288 MW185 MW
Kazakhstan29930.7 MW302 MW
Bangladesh19149 MW48.8 MW
Pakistan211415.5 MW5 MW
Nepal1495 MW7.5 MW
Uzbekistan74—12 MW
Sri Lanka741.5 MW—
Kyrgyzstan440.5 MW—
Tajikistan22——

Facilities

19 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Yotta Dhaka Data Center ParkYotta Data Services (Hiranandani Group)
History
  1. Announced
  2. Under construction
  3. Under construction
Kaliakair Under construction 28.8 MW IT — Trade press
Osiris Group Tier IV Data CenterOsiris Group / Jatra International Kaliakair Planned 20 MW total — Trade press
Felicity IDC KaliakoirFelicity IDC Limited (Fiber@Home) Kaliakair Operational 5 MW total 2022 Trade press
Grameenphone Super Core Data CenterGrameenphone
History
  1. Operational
  2. Operational
Sylhet Operational 4 MW IT 2024 Trade press
Bangladesh Green Data Centre (Chattogram)Government of Bangladesh / BTCL (PPP, ADB-supported) Chattogram Planned — — Trade press
Banglalink Gazipur Data CenterBanglalink Gazipur Operational — — Trade press
BDCCL Disaster Recovery Data Centre JashoreBangladesh Data Center Company Limited (BDCCL) Jessore Operational — — Trade press
Cypher Data CentreAxentec PLC (Robi Axiata) Jessore Operational — 2024 Trade press
DataHub Asia ThakurgaonDataHub Asia Thakurgaon Operational — — Trade press
DataVolt Bangabandhu Hi-Tech City Data CenterDataVolt Kaliakair Planned — — Trade press
Dhaka Colo ChittagongDhaka Colo Limited Chattogram Operational — — Trade press
Dhaka Colo DhakaDhaka Colo Limited Dhaka Operational — — Trade press
Dhaka Colo JashoreDhaka Colo Limited Jessore Operational — — Trade press
Dhaka Colo KhulnaDhaka Colo Limited Khulna Operational — — Trade press
Felicity IDC JashoreFelicity IDC Limited (Fiber@Home) Jessore Planned — — Trade press
Meghna Bank Head Office Data CentreMeghna Bank Limited
History
  1. Operational
  2. Operational
Dhaka Operational — 2022 Trade press
National Data Center (Tier IV) KaliakoirBangladesh Data Center Company Limited (BDCCL) Kaliakair Operational — 2019 Operator / official
Robi Narayanganj Data CentreRobi Axiata Narayanganj Operational — — Trade press
Summit Group Data CentreSummit Group Planned — — Trade press

Get the data

Every data center in Bangladesh, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

All countries

Global Data Center Database: annual licence

1,199 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

$1,499 USD / year

Subscribe

Full database now, a fresh file every month. Renews yearly; cancel anytime in PayPal.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in Bangladesh

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

Secure checkout

Data pack

Loading secure checkout…

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Bangladesh?

DC Market Insights tracks 19 data centers in Bangladesh as of October 2026: 13 operational, 1 under construction and 5 planned, run by 14 operators. The count grows as we verify more sites.

What is the data center capacity of Bangladesh?

Tracked operational capacity in Bangladesh is 9 MW, with 28.8 MW under construction and 20 MW planned. These totals use the capacity each source states (IT load where given) and cover 4 of 19 tracked facilities.

Which companies operate the most data center capacity in Bangladesh?

By tracked operational capacity, the largest operators in Bangladesh are Felicity IDC Limited (Fiber@Home) (5 MW) and Grameenphone (4 MW).

Where are the data centers in Bangladesh located?

The largest clusters by tracked capacity are Dhaka (10 facilities), Sylhet (1 facilities) and Jessore (4 facilities). The map above shows every site.

Which new data centers are being built in Bangladesh?

We track 28.8 MW under construction and 20 MW planned. The largest projects are Yotta Dhaka Data Center Park (28.8 MW) and Osiris Group Tier IV Data Center (20 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst