Proprietary data

ST Telemedia Global Data Centres Data Centers

Data centers operated by ST Telemedia Global Data Centres that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 7 data centers operated by ST Telemedia Global Data Centres in 2 countries, of which 6 are operational. Stated operational capacity is 112 MW, with a further 16 MW under construction and — planned. The pipeline is 0.1 times the capacity already operating.

7Facilities tracked
2Countries
112 MWOperational (6 sites)
16 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 7 of 7 facilities have a stated capacity; the others are counted as sites only.

STT Singapore 1 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Singapore 2 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Singapore 3 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Singapore 4 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Singapore 5 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Singapore 6 · ST Telemedia Global Data Centres · Singapore (approximate location)STT Johor 1 · ST Telemedia Global Data Centres · Iskandar Puteri (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

ST Telemedia Global Data Centres data centers: key facts

  • Capacity under construction or planned (16 MW) is 0.1 times the operational base of 112 MW.
  • Its largest operational site is STT Singapore 6 in Singapore, Singapore at 40 MW.
  • The largest project in the pipeline is STT Johor 1 (16 MW, under construction).
  • Singapore accounts for 87% of tracked capacity (6 facilities).
  • 5 facilities publish a PUE figure; the lowest is 1.30 at STT Singapore 6 (ST Telemedia Global Data Centres) and the median is 1.42.
Capacity by status, MW
Operational112 MW
Under construction16 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Singapore112 MW

OperationalUnder construction or planned

ST Telemedia Global Data Centres development pipeline

Under construction and planned facilities with a stated capacity, largest first. 16 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
STT Johor 1ST Telemedia Global Data Centres Iskandar Puteri, Malaysia Under construction Colocation 16 MW

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
STT Singapore 6Colocation
History
  1. Operational
  2. Operational
Singapore, Singapore Operational 40 MW IT — Operator / official
STT Singapore 4Colocation Singapore, Singapore Operational 18 MW IT — Operator / official
STT Johor 1Colocation
1 deal
  • United Overseas Bank (Malaysia); OCBC Bank (Malaysia); Standard Chartered Bank Malaysia; CIMB Bank → STT Johor campus, Nusa Cemerlang Industrial Park (up to 166MW) US$1,370m
  • All deals in the Deal Tracker
Iskandar Puteri, Malaysia Under construction 16 MW IT — Trade press
STT Singapore 3Colocation Singapore, Singapore Operational 15 MW IT — Operator / official
STT Singapore 5Colocation Singapore, Singapore Operational 13.8 MW IT — Operator / official
STT Singapore 1Colocation Singapore, Singapore Operational 13 MW IT — Operator / official
STT Singapore 2Colocation Singapore, Singapore Operational 12 MW IT — Operator / official

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does ST Telemedia Global Data Centres operate?

DC Market Insights tracks 7 ST Telemedia Global Data Centres data centers in 2 countries as of October 2026: 6 operational, 1 under construction and 0 planned.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst