Green Capital Data Centers

Data centers operated by Green Capital that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data centers operated by Green Capital in 1 country, of which 0 are operational.

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
300 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Green Capital data centers: key facts

  • The largest project in the pipeline is Green Capital Chubut data center (300 MW, planned).

Green Capital development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 300 MW planned in total.

ProjectLocationStatusTypeCapacity
Green Capital Chubut data centerGreen Capital Argentina Planned Hyperscale 300 MW

Facilities

1 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Green Capital Chubut data centerHyperscale Argentina Planned 300 MW total — Trade press

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Green Capital operate?

DC Market Insights tracks 1 Green Capital data centers in 1 countries as of October 2026: 0 operational, 0 under construction and 1 planned.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst