As of 7 October 2026, DC Market Insights tracks 16 data centers operated by Sify in 1 country, of which 12 are operational. Stated operational capacity is 188 MW, with a further — under construction and 290 MW planned. The pipeline is 1.5 times the capacity already operating.

16Facilities tracked
1Countries
188 MWOperational (12 sites)
—Under construction (0 sites)
290 MWPlanned (4 sites)

MW = IT capacity where the source states it, otherwise total capacity. 12 of 16 facilities have a stated capacity; the others are counted as sites only.

Sify Rabale · Sify · Navi Mumbai (approximate location)Sify Airoli · Sify · Navi Mumbai (approximate location)Sify Vashi · Sify · Navi Mumbai (approximate location)Sify Chennai 01 (Tidel Park) · Sify · Chennai (approximate location)Sify Chennai 02 (Siruseri) · Sify · Chennai (approximate location)Sify Noida 01 · Sify · Noida (approximate location)Sify Noida 02 · Sify · Noida (approximate location)Sify Bengaluru 01 · Sify · Bengaluru (approximate location)Sify Bengaluru 02 (Aerospace Park) · Sify · Bengaluru (approximate location)Sify Hyderabad 01 · Sify · Hyderabad (approximate location)Sify Hyderabad 02 (Fab City) · Sify · Hyderabad (approximate location)Sify Kolkata 01 · Sify · Kolkata (approximate location)Sify AI Edge Chandigarh 01 · Sify · Chandigarh (approximate location)Sify AI Edge Lucknow 01 · Sify · Lucknow (approximate location)Sify AI Edge Nagpur 01 · Sify · Nagpur (approximate location)Sify AI Edge Kolkata 02 · Sify · Kolkata (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Sify data centers: key facts

About Sify Technologies

Sify Technologies is an Indian ICT services provider whose offerings include network, cloud, security and data center services such as colocation. As stated on its website, its infrastructure comprises 11 data centers in Indian cities including Mumbai, Chennai, Noida, Bangalore, Hyderabad and Kolkata.

Ownership
Listed on Nasdaq (SIFY)
Tracked footprint
16 facilities in 1 country
Website
sifytechnologies.com

Company details checked against company and official sources, 7 Oct 2026.

  • Capacity under construction or planned (290 MW) is 1.5 times the operational base of 188 MW.
  • Its largest operational site is Sify Rabale in Navi Mumbai, India at 96.9 MW.
  • The largest project in the pipeline is Sify Hyderabad 02 (Fab City) (250 MW, planned).
  • By type, the tracker lists 7 colocation, 5 hyperscale and 4 edge facilities.
  • 12 of 16 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational188 MW
Planned290 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Colocation7
Hyperscale5
Edge4

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Sify development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 290 MW planned in total.

ProjectLocationStatusTypeCapacity
Sify Hyderabad 02 (Fab City)Sify Hyderabad, India Planned Hyperscale 250 MW
Sify Bengaluru 02 (Aerospace Park)Sify Bengaluru, India Planned Hyperscale 40 MW

Facilities

16 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Sify Hyderabad 02 (Fab City)Hyperscale Hyderabad, India Planned 250 MW IT — Operator / official
Sify RabaleHyperscale Navi Mumbai, India Operational 96.9 MW IT — Operator / official
Sify Bengaluru 02 (Aerospace Park)Hyperscale Bengaluru, India Planned 40 MW IT — Operator / official
Sify Chennai 02 (Siruseri)Hyperscale Chennai, India Operational 25.9 MW IT — Operator / official
Sify Noida 02Hyperscale Noida, India Operational 25.9 MW IT — Operator / official
Sify Hyderabad 01Colocation Hyderabad, India Operational 14.4 MW IT — Operator / official
Sify Noida 01Colocation Noida, India Operational 11 MW IT — Operator / official
Sify Bengaluru 01Colocation Bengaluru, India Operational 4.8 MW IT — Operator / official
Sify AiroliColocation Navi Mumbai, India Operational 4.1 MW IT — Operator / official
Sify Chennai 01 (Tidel Park)Colocation Chennai, India Operational 3.6 MW IT — Operator / official
Sify Kolkata 01Colocation Kolkata, India Operational 1.1 MW IT — Operator / official
Sify VashiColocation Navi Mumbai, India Operational 0.4 MW IT — Operator / official
Sify AI Edge Chandigarh 01Edge Chandigarh, India Operational — — Operator / official
Sify AI Edge Kolkata 02Edge Kolkata, India Planned — — Operator / official
Sify AI Edge Lucknow 01Edge Lucknow, India Operational — — Operator / official
Sify AI Edge Nagpur 01Edge Nagpur, India Planned — — Operator / official

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Sify operate?

DC Market Insights tracks 16 Sify data centers in 1 countries as of October 2026: 12 operational, 0 under construction and 4 planned.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst