In short

As of 7 October 2026, DC Market Insights tracks 5 data centers in Peru run by 3 operators: 4 operational, 1 under construction and 0 planned. Stated operational capacity is 4.7 MW, with a further 20 MW under construction and — planned. Cirion Technologies holds the largest share of tracked operational capacity (85%).

5Facilities tracked
3Operators
4.7 MWOperational (4 sites)
20 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 5 facilities have a stated capacity; the others are counted as sites only.

LM1 · Equinix · Lima (approximate location)LIM1 · Cirion Technologies · Santiago de Surco (approximate location)Surco · Gtd · Santiago de Surco (approximate location)
Operational Under construction Planned

Market snapshot

Peru data center market: key facts

  • Capacity under construction or planned (20 MW) is 4.3 times the operational base of 4.7 MW.
  • The three largest operators by operational capacity, Cirion Technologies, Equinix and Gtd, hold 100% of tracked operational MW.
  • Cirion Technologies has the largest development pipeline in Peru: 20 MW under construction or planned.
  • The largest operational facility we track is LIM1 (Cirion Technologies, Santiago de Surco) at 4 MW.
  • The largest project in the pipeline is LIM2 by Cirion Technologies (20 MW, under construction).
  • 3 of 5 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational4.7 MW
Under construction20 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Peru by tracked capacity, MW
Equinix0.7 MW

OperationalUnder construction or planned

Operators in Peru

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Cirion Technologies24 MW20 MW85%
Gtd2———
Equinix10.7 MW—15%

Largest data center projects in Peru

Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
LIM2Cirion Technologies Lurín Under construction Colocation 20 MW

How Peru compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States8751263,666 MW6,296 MW
Argentina5510.5 MW920 MW
Brazil14743363 MW465 MW
Chile441682.6 MW663 MW
Colombia16117 MW19.2 MW
Peru534.7 MW20 MW
Guatemala21—2 MW
Ecuador111 MW—
Panama22——
Uruguay11——
Bolivia11——
Dominican Republic11——

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
LIM2Cirion Technologies Lurín Under construction 20 MW total — Operator / official
LIM1Cirion Technologies Santiago de Surco Operational 4 MW total — Operator / official
LM1Equinix Lima Operational 0.7 MW total — Operator / official
Lurín Phase 1Gtd Lurín Operational — — Operator / official
SurcoGtd Santiago de Surco Operational — — Operator / official

Get the data

Every data center in Peru, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

All countries

Global Data Center Database: annual licence

1,938 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

$1,499 USD / year

Subscribe

Full database now, a fresh file every month. Renews yearly; cancel anytime in PayPal.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in Peru

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

Secure checkout

Data pack

Loading secure checkout…

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Peru?

DC Market Insights tracks 5 data centers in Peru as of October 2026: 4 operational, 1 under construction and 0 planned, run by 3 operators. The count grows as we verify more sites.

What is the data center capacity of Peru?

Tracked operational capacity in Peru is 4.7 MW, with 20 MW under construction and — planned. These totals use the capacity each source states (IT load where given) and cover 3 of 5 tracked facilities.

Which companies operate the most data center capacity in Peru?

By tracked operational capacity, the largest operators in Peru are Cirion Technologies (4 MW) and Equinix (0.7 MW).

Which new data centers are being built in Peru?

We track 20 MW under construction and — planned. The largest projects are LIM2 by Cirion Technologies (20 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst