Proprietary data
Claro Data Centers
Data centers operated by Claro that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 October 2026, DC Market Insights tracks 8 data centers operated by Claro in 6 countries, of which 8 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 8 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Claro data centers: key facts
- Colombia accounts for 0% of tracked capacity (2 facilities).
- By type, the tracker lists 7 colocation and 1 enterprise facilities.
- 0 of 8 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Facilities
8 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Claro Buenos Aires CABA data centerEnterprise | Buenos Aires, Argentina | Operational | — | — | Trade press |
| Claro Data Center LirayColocation | Colina, Chile | Operational | — | — | Trade press |
| Claro Guatemala Data CenterColocation | Guatemala | Operational | — | 2022 | Trade press |
| Claro Perú Villa El SalvadorColocation | Villa El Salvador, Peru | Operational | — | — | Trade press |
| Data Xperience Center DuránColocation | Durán, Ecuador | Operational | — | — | Trade press |
| Data Xperience Center QuitoColocation | Quito, Ecuador | Operational | — | — | Trade press |
| TriaraColocation | Bogotá, Colombia | Operational | — | — | Trade press |
| Triara MegacenterColocation | Medellín, Colombia | Operational | — | 2019 | Trade press |
Market position
How Claro compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Colombia, Claro is one of 17 operators we track.
- Colombia has 27 tracked data centers from 17 operators: 7 MW operational and 19.2 MW under construction or planned.
- In Ecuador, Claro is one of 6 operators we track.
- In Chile, Claro is one of 17 operators we track.
Data center operators in Colombia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 3 | — | 19.2 MW |
| Cirion Technologies | 1 | 7 MW | — |
| Scala Data Centers | 3 | — | — |
| ODATA | 3 | — | — |
| Gtd | 2 | — | — |
| Equinix | 2 | — | — |
| Ufinet | 2 | — | — |
| Liberty Networks | 1 | — | — |
Data center operators in Ecuador
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Cirion Technologies | 1 | 1 MW | — |
| Telconet | 4 | — | — |
| CNT | 2 | — | — |
| Ufinet | 1 | — | — |
| Puntonet | 1 | — | — |
Data center operators in Chile
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Grenergy | 3 | — | 400 MW |
| Ascenty | 5 | 26 MW | 150 MW |
| EdgeConneX | 4 | 21 MW | 40 MW |
| Scala Data Centers | 6 | 5 MW | 52.8 MW |
| ODATA | 2 | 40.6 MW | — |
| Cirion Technologies | 2 | 4 MW | 20 MW |
| Nabiax | 1 | 2 MW | — |
| Gtd | 7 | — | — |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Claro operate?
DC Market Insights tracks 8 Claro data center(s) in 6 countries as of October 2026: 8 operational, 0 under construction and 0 planned.
Which other companies operate data centers in Colombia?
Besides Claro, the largest operators we track in Colombia by capacity are EdgeConneX, Cirion Technologies, Scala Data Centers, ODATA and Gtd. The Colombia page lists all 17 operators.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
