Proprietary data

EdgeConneX Data Centers

Data centers operated by EdgeConneX that we have verified: location, status and capacity, each checked against its source.

In short

As of 8 October 2026, DC Market Insights tracks 35 data centers operated by EdgeConneX in 6 countries, of which 21 are operational. Stated operational capacity is 42.5 MW, with a further 9.6 MW under construction and 334 MW planned. The pipeline is 8.1 times the capacity already operating.

35Facilities tracked
6Countries
42.5 MWOperational (21 sites)
9.6 MWUnder construction (3 sites)
334 MWPlanned (11 sites)

MW = IT capacity where the source states it, otherwise total capacity. 16 of 35 facilities have a stated capacity; the others are counted as sites only.

EdgeConneX Kuala Lumpur CBD · EdgeConneX · Kuala Lumpur (approximate location)EdgeConneX Cyberjaya · EdgeConneX · Cyberjaya (approximate location)EdgeConneX Bukit Jalil · EdgeConneX · Kuala Lumpur (approximate location)EdgeConneX Heusenstamm campus · EdgeConneX · Heusenstamm (approximate location)MUC01 · EdgeConneX · Munich (approximate location)SCL01 · EdgeConneX · Colina (approximate location)SCL02 · EdgeConneX · Colina (approximate location)SCL03 · EdgeConneX · Colina (approximate location)SCL04 · EdgeConneX · Colina (approximate location)BOG01 · EdgeConneX · Bogotá (approximate location)BOG02 · EdgeConneX · Bogotá (approximate location)BOG11 · EdgeConneX · Bogotá (approximate location)BUE · EdgeConneX · Pilar (approximate location)EdgeConneX RIC01 Richmond · EdgeConneX · Richmond (approximate location)EdgeConneX PIT01 Pittsburgh · EdgeConneX · Pittsburgh (approximate location)EdgeConneX NOR01 Norfolk · EdgeConneX · Norfolk (approximate location)EdgeConneX HOU-01 Houston · EdgeConneX · Houston (approximate location)EdgeConneX PHX01 Tempe · EdgeConneX · Tempe (approximate location)EdgeConneX LAS01 Las Vegas · EdgeConneX · Las Vegas (approximate location)EdgeConneX SVC01 Santa Clara · EdgeConneX · Santa Clara (approximate location)EdgeConneX Union City (ATL11-ATL13) · EdgeConneX · Union City (approximate location)ATL02 · EdgeConneX · Atlanta (approximate location)ATL01 · EdgeConneX · Atlanta (approximate location)SLI01 · EdgeConneX · Slidell (approximate location)MEM01 · EdgeConneX · Memphis (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

EdgeConneX data centers: key facts

About EdgeConneX

EdgeConneX provides data center solutions worldwide, building facilities of a range of sizes and types. As stated on its website in October 2026, it has over 90 data centers built and in development across North America, South America, Europe, the Middle East and Asia Pacific, with headquarters in Northern Virginia, Singapore and Amsterdam.

Headquarters
Herndon, United States
Founded
2009
Ownership
Acquired by EQT Infrastructure in 2020 (per company website)
Parent company
EQT Infrastructure
Tracked footprint
35 facilities in 6 countries
Website
edgeconnex.com

Company details checked against company and official sources, 8 Oct 2026.

  • Capacity under construction or planned (343 MW) is 8.1 times the operational base of 42.5 MW.
  • Its largest operational site is SCL02 in Colina, Chile at 14 MW.
  • The largest project in the pipeline is EdgeConneX Cyberjaya (200 MW, planned).
  • Malaysia accounts for 74% of tracked capacity (3 facilities).
  • By type, the tracker lists 16 colocation, 14 edge and 5 hyperscale facilities.
  • 16 of 35 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational42.5 MW
Under construction9.6 MW
Planned334 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Malaysia284 MW
Chile61 MW
Colombia19.2 MW
Argentina3.5 MW
Germany2.4 MW

OperationalUnder construction or planned

Facilities by type
Colocation16
Edge14
Hyperscale5

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

EdgeConneX development pipeline

Under construction and planned facilities with a stated capacity, largest first. 9.6 MW under construction and 334 MW planned in total.

ProjectLocationStatusTypeCapacity
EdgeConneX CyberjayaEdgeConneX Cyberjaya, Malaysia Planned Colocation 200 MW
EdgeConneX Bukit JalilEdgeConneX Kuala Lumpur, Malaysia Planned Colocation 67 MW
SCL04EdgeConneX Colina, Chile Planned Colocation 33 MW
EdgeConneX Kuala Lumpur CBDEdgeConneX Kuala Lumpur, Malaysia Planned Colocation 17 MW
BOG01EdgeConneX Bogotá, Colombia Planned Colocation 9.6 MW
BOG02EdgeConneX Bogotá, Colombia Under construction Colocation 9.6 MW
SCL03EdgeConneX Colina, Chile Planned Colocation 7 MW

Facilities

35 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
EdgeConneX CyberjayaColocation Cyberjaya, Malaysia Planned 200 MW total — Operator / official
EdgeConneX Bukit JalilColocation Kuala Lumpur, Malaysia Planned 67 MW IT — Operator / official
SCL04Colocation Colina, Chile Planned 33 MW IT — Operator / official
EdgeConneX Kuala Lumpur CBDColocation Kuala Lumpur, Malaysia Planned 17 MW IT — Operator / official
SCL02Colocation Colina, Chile Operational 14 MW IT — Operator / official
BOG01Colocation Bogotá, Colombia Planned 9.6 MW IT — Operator / official
BOG02Colocation Bogotá, Colombia Under construction 9.6 MW IT — Operator / official
ATL02Edge Atlanta, United States Operational 9 MW IT — Operator / official
SCL01Colocation Colina, Chile Operational 7 MW IT — Operator / official
SCL03Colocation Colina, Chile Planned 7 MW IT — Operator / official
BUEEdge Pilar, Argentina Operational 3.5 MW IT — Operator / official
EdgeConneX POR02 PortlandColocation United States Operational 3 MW IT — Operator / official
MUC01Colocation Munich, Germany Operational 2.4 MW total — Operator / official
ATL01Edge Atlanta, United States Operational 2.1 MW IT — Operator / official
EdgeConneX LAS01 Las VegasEdge Las Vegas, United States Operational 0.8 MW IT — Operator / official
EdgeConneX NOR01 NorfolkEdge Norfolk, United States Operational 0.8 MW IT — Operator / official
BOG11Colocation Bogotá, Colombia Under construction — — Operator / official
EdgeConneX AUS02 BastropHyperscale United States Under construction — — Trade press
EdgeConneX EDCAUS11 Cedar CreekHyperscale Cedar Creek, United States Planned — — Trade press
EdgeConneX EDCAUS12 Cedar CreekHyperscale Cedar Creek, United States Planned — — Trade press
EdgeConneX Heusenstamm campusHyperscale Heusenstamm, Germany Planned — — Trade press
EdgeConneX HOU-01 HoustonColocation Houston, United States Operational — — Operator / official
EdgeConneX PHX01 TempeColocation Tempe, United States Operational — — Operator / official
EdgeConneX PIT01 PittsburghEdge Pittsburgh, United States Operational — — Operator / official
EdgeConneX POR01 PortlandColocation United States Operational — — Operator / official
EdgeConneX POR03 PortlandColocation United States Planned — — Operator / official
EdgeConneX RIC01 RichmondEdge Richmond, United States Operational — — Operator / official
EdgeConneX SVC01 Santa ClaraEdge Santa Clara, United States Operational — — Operator / official
EdgeConneX Union City (ATL11-ATL13)Hyperscale Union City, United States Planned — — Operator / official
JAX01Edge United States Operational — — Operator / official
MEM01Edge Memphis, United States Operational — — Operator / official
MIA01Edge United States Operational — — Operator / official
MIA02Edge United States Operational — — Operator / official
SLI01Edge Slidell, United States Operational — — Operator / official
TAL01Edge United States Operational — — Operator / official

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does EdgeConneX operate?

DC Market Insights tracks 35 EdgeConneX data centers in 6 countries as of October 2026: 21 operational, 3 under construction and 11 planned.

Where is EdgeConneX headquartered?

EdgeConneX is headquartered in Herndon, United States. Ownership: Acquired by EQT Infrastructure in 2020 (per company website).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst