Proprietary data
Oracle Data Centers
Data centers operated by Oracle that we have verified: location, status and capacity, each checked against its source.
In short
As of 8 October 2026, DC Market Insights tracks 5 data centers operated by Oracle in 3 countries, of which 5 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 5 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Oracle data centers: key facts
- Brazil accounts for 0% of tracked capacity (2 facilities).
- 0 of 5 facilities have a capacity stated by their source; the totals above count only those.
Facilities
5 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Oracle Cloud Bogotá RegionHyperscale | Bogotá, Colombia | Operational | — | 2023 | Trade press |
| Oracle Cloud Santiago RegionHyperscale | Santiago, Chile | Operational | — | — | Operator / official |
| Oracle Cloud São Paulo RegionHyperscale | Brazil | Operational | — | 2020 | Operator / official |
| Oracle Cloud Valparaíso RegionHyperscale | Valparaíso, Chile | Operational | — | 2023 | Operator / official |
| Oracle Cloud Vinhedo RegionHyperscale | Vinhedo, Brazil | Operational | — | 2021 | Operator / official |
Market position
How Oracle compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Brazil, Oracle is one of 43 operators we track.
- Brazil has 147 tracked data centers from 43 operators: 363 MW operational and 465 MW under construction or planned.
- In Chile, Oracle is one of 17 operators we track.
- In Colombia, Oracle is one of 17 operators we track.
- Vinhedo also hosts 5 other tracked data center(s), run by Ascenty.
- Our Deal Tracker lists 1 deal(s) naming Oracle, the latest on 17 September 2026.
Data center operators in Brazil
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Ascenty | 31 | 221 MW | 86 MW |
| Scala Data Centers | 25 | 113 MW | 127 MW |
| Omnia | 1 | — | 200 MW |
| CloudHQ | 2 | — | 36 MW |
| Cirion Technologies | 4 | 27 MW | — |
| HostDime | 2 | 1.5 MW | 15 MW |
| Atlantic Data Centers | 1 | — | 1 MW |
| Elea Data Centers | 12 | — | — |
Data center operators in Chile
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Grenergy | 3 | — | 400 MW |
| Ascenty | 5 | 26 MW | 150 MW |
| EdgeConneX | 4 | 21 MW | 40 MW |
| Scala Data Centers | 6 | 5 MW | 52.8 MW |
| ODATA | 2 | 40.6 MW | — |
| Cirion Technologies | 2 | 4 MW | 20 MW |
| Nabiax | 1 | 2 MW | — |
| Gtd | 7 | — | — |
Data center operators in Colombia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 3 | — | 19.2 MW |
| Cirion Technologies | 1 | 7 MW | — |
| ODATA | 3 | — | — |
| Scala Data Centers | 3 | — | — |
| Gtd | 2 | — | — |
| Equinix | 2 | — | — |
| Claro | 2 | — | — |
| Ufinet | 2 | — | — |
Other data centers in Vinhedo
- Vinhedo 2 · Ascenty · Operational · 34 MW
- Vinhedo 1 · Ascenty · Operational · 27 MW
- Vinhedo 3 · Ascenty · Under construction
- Vinhedo 4 · Ascenty · Planned
- Vinhedo 5 · Ascenty · Planned
Deals naming Oracle
- Oracle → More than 1.7 GW of Texas wind supply for Oracle's Texas operations Power deal
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Oracle operate?
DC Market Insights tracks 5 Oracle data center(s) in 3 countries as of October 2026: 5 operational, 0 under construction and 0 planned.
Which other companies operate data centers in Brazil?
Besides Oracle, the largest operators we track in Brazil by capacity are Ascenty, Scala Data Centers, Omnia, CloudHQ and Cirion Technologies. The Brazil page lists all 43 operators.
Which other data centers are in Vinhedo?
Other tracked data centers in Vinhedo include Vinhedo 2 (Ascenty), Vinhedo 1 (Ascenty), Vinhedo 3 (Ascenty) and Vinhedo 4 (Ascenty).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.