Slough Holdings UK Data Centers

Data centers operated by Slough Holdings UK that we have verified: location, status and capacity, each checked against its source.

In short

As of 12 October 2026, DC Market Insights tracks 1 data center operated by Slough Holdings UK in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
300 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

SDC M40 Campus (Wapseys Wood) · Slough Holdings UK · Gerrards Cross (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Slough Holdings UK data centers: key facts

  • The largest project in the pipeline is SDC M40 Campus (Wapseys Wood) by Slough Holdings UK (300 MW, planned).

Slough Holdings UK development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 300 MW planned in total.

ProjectLocationStatusTypeCapacity
SDC M40 Campus (Wapseys Wood)Slough Holdings UK Gerrards Cross, United Kingdom Planned Hyperscale 300 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
SDC M40 Campus (Wapseys Wood)Hyperscale Gerrards Cross, United Kingdom Planned 300 MW IT — Operator / official

Market position

How Slough Holdings UK compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Slough Holdings UK ranks #6 of 48 tracked operators by capacity, with 3.8% of the country’s tracked MW.
  • United Kingdom has 181 tracked data centers from 48 operators: 760 MW operational and 7,045 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).

Data center operators in United Kingdom

Tracked facilities18148 operators
Operational capacity760 MW7,045 MW in the pipeline
Slough Holdings UK rank by capacity#6of 48 operators · 3.8%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Humber Tech Park1—386 MW
Equinix15—250 MW
Virtus Data Centres1196.9 MW145 MW
CSE521—240 MW

All data centers in United Kingdom Power and policy in United Kingdom

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Slough Holdings UK operate?

DC Market Insights tracks 1 Slough Holdings UK data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in United Kingdom?

Besides Slough Holdings UK, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Humber Tech Park. The United Kingdom page lists all 48 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst