In short

As of 14 October 2026, DC Market Insights tracks 1 data center operated by Thylander in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
11.5 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Dansk Data Center 1 (DDC1) Port of Esbjerg · Thylander · Esbjerg (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Thylander data centers: key facts

  • The largest project in the pipeline is Dansk Data Center 1 (DDC1) Port of Esbjerg by Thylander (11.5 MW, under construction).

Thylander development pipeline

Under construction and planned facilities with a stated capacity, largest first. 11.5 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Dansk Data Center 1 (DDC1) Port of EsbjergThylander Esbjerg, Denmark Under construction Colocation 11.5 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Dansk Data Center 1 (DDC1) Port of EsbjergColocation
History
  1. Under construction
  2. Under construction
Esbjerg, Denmark Under construction 11.5 MW total — Operator / official

Market position

How Thylander compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Denmark, Thylander ranks #4 of 10 tracked operators by capacity, with 1.4% of the country’s tracked MW.
  • Denmark has 18 tracked data centers from 10 operators: 30 MW operational and 772 MW under construction or planned.
  • Industrial electricity in Denmark costs 134 USD/MWh (2025, latest official figure).
  • Esbjerg also hosts 2 other tracked data center(s), run by Prime Data Centers and Bulk Infrastructure.

Data center operators in Denmark

Tracked facilities1810 operators
Operational capacity30 MW772 MW in the pipeline
Thylander rank by capacity#4of 10 operators · 1.4%
Industrial power price134 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
GARBE Data Centers1—350 MW
atNorth230 MW250 MW
Prime Data Centers1—160 MW
Microsoft5——
Digital Realty4——
Meta1——
Bulk Infrastructure1——
Apple1——

All data centers in Denmark Power and policy in Denmark

Other data centers in Esbjerg

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Thylander operate?

DC Market Insights tracks 1 Thylander data center(s) in 1 country as of October 2026: 0 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Denmark?

Besides Thylander, the largest operators we track in Denmark by capacity are GARBE Data Centers, atNorth, Prime Data Centers, Microsoft and Digital Realty. The Denmark page lists all 10 operators.

What rules apply to data centers in Denmark?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Denmark, including 1 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Esbjerg?

Other tracked data centers in Esbjerg include Prime Data Centers Esbjerg campus (Prime Data Centers) and Bulk DK01 Esbjerg (Bulk Infrastructure).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst