Proprietary data

Data Center Power & Policy in Denmark

Every government action on data centers and power in Denmark that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 14 October 2026, DC Market Insights tracks 6 government actions on data centers and power in Denmark, 4 of them in force. Denmark has 1 restriction on new data centers in force: Energinet temporary pause on new grid connection agreements to the transmission grid.

6Actions tracked
4In force
134 USD/MWhIndustrial power price
81.5%Renewable share of generation

Market snapshot

Denmark power and policy: key facts

  • Industrial electricity price: 134 USD/MWh (2025). Rank 7 of 15 tracked countries, highest first.
  • Renewable share of electricity generation: 81.5% (2024). Rank 2 of 26 tracked countries, highest first.
  • Grid emission factor: 0.11 kgCO2/kWh (2024). Rank 17 of 19 tracked countries, highest first.
  • Latest change: Grid emergency plan (akutplan for elnettet): priority model puts most data centres last in the grid connection queue (Ministry of Climate, Energy and Utilities (Klima-, Energi- og Forsyningsministeriet); Folketing, 1 Oct 2026).
  • By type: 2 efficiency rule, 1 restriction, 1 grid access and 1 moratorium.

Power indicators for Denmark

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 134 USD/MWh 2025 · Eurostat nrg_pc_205, Denmark, band IE (20,000 to 69,999 MWh), excluding VAT and other recoverable taxes: 2025-S1 0.1203 EUR/kWh, 2025-S2 0.1163 EUR/kWh; mean 0.1183 EUR/kWh = 118.3 EUR/MWh x 1.1300 USD/EUR (Eurostat ert_bil_eur_a, 2025 annual average) = 1 Eurostat, Electricity prices for non-household consumers, bi-annual data (nrg_pc_205)
Renewable share of electricity generation 81.5% 2024 · Electricity produced from renewable energy as a share of domestic electricity supply (indenlandske elforsyning) in 2024, Energistyrelsen Energistatistik 2024. Wind and solar alone covered 63.3% of consumption (Energi- og forsyningspolitisk redegørelse 202 Energistyrelsen, Energistatistik 2024 (31 Oct 2025)
Grid emission factor 0.11 kgCO2/kWh 2024 · CO2 per kWh of electricity sold in Denmark in 2024 (107 g), Energistyrelsen, 125% method for CHP fuel allocation (used since 2022). CO2 only, not CO2e. Energistyrelsen, Bilag til Energistatistik 2024: Emissioner, energipriser og internationale forhold

In force now in Denmark

Moratorium (1)

  • MoratoriumIn force

    Energinet temporary pause on new grid connection agreements to the transmission grid

    On 2 March 2026 Energinet, the state-owned transmission system operator, paused the signing of new grid connection agreements to the transmission grid, after requests from large new loads (data centres, batteries, Power-to-X) far exceeded the capacity it can make available in the short term; queued projects were reported at about 60 GW against Danish peak demand of about 7 GW. Projects with a signed connection agreement are not affected; all others face longer processing. The pause was set for three months or until new capacity measures are in place; on 27 May 2026 Energinet said it would sign new agreements only in autumn 2026 under a new model (PP-DK-002).

    Energinet (state-owned TSO, Ministry of Climate, Energy and Utilities) · Effective 2 Mar 2026 · Energinet news, 'Energinet indfører midlertidig pause i nye nettilslutninger og sætter turbo på akutpakke' (2 Mar 2026)

Efficiency rule (2)

  • Efficiency ruleIn force

    Executive Order 1167/2025: data centres above 1 MW must make a cost-benefit analysis and use surplus heat where feasible

    Executive Order no. 1167 of 2 October 2025 (Danish Energy Agency), in force 11 October 2025, implements EED art. 26. A new or substantially renovated data centre with total rated energy input above 1 MW must prepare a cost-benefit analysis of using its surplus heat, including cooling solutions that capture heat at a useful temperature, and must use surplus heat or other heat recovery unless the analysis shows this is not technically or economically feasible. Data centres whose surplus heat is or will be used in a district heating network or on site are exempt from the analysis.

    1 MW Total rated energy input threshold (more than 1 MW)

    Danish Energy Agency (Energistyrelsen) · Effective 11 Oct 2025 · Retsinformation, Bekendtgørelse nr. 1167 af 2. oktober 2025 om udarbejdelse og godkendelse af cost-benefit-analyser for industrianlæg, servicefaciliteter og datacentre

  • Efficiency ruleIn force

    Executive Order 926/2024: data centres of 500 kW IT load or more must report energy performance to the EU database

    Executive Order no. 926 of 9 July 2024 (Danish Energy Agency), in force 1 September 2024, implements the EU Energy Efficiency Directive (art. 12) and Delegated Regulation (EU) 2024/1364. Operators of data centres with installed IT power demand of 500 kW or more must report energy performance indicators (energy use, PUE inputs, water use, reused waste heat, renewable energy) directly to the European Commission's database by 15 September 2024 and then by 15 May each year. Defence and civil-protection data centres are exempt; failure to report is punishable by fines.

    500 kW Installed IT power demand threshold; annual reporting deadline 15 May

    Danish Energy Agency (Energistyrelsen) · Effective 1 Sep 2024 · Retsinformation, Bekendtgørelse nr. 926 af 9. juli 2024 om indberetning og offentliggørelse af oplysninger vedrørende datacentres energimæssige ydeevne

Regulation (1)

  • RegulationIn force

    Personal data transfers outside the EU/EEA: GDPR chapter V as applied by Datatilsynet

    Denmark applies the EU General Data Protection Regulation (with the Danish Data Protection Act). There is no data localisation rule, but transfers of personal data to countries outside the EU/EEA may only take place on GDPR chapter V conditions: an EU adequacy decision, standard contractual clauses or binding corporate rules approved by Datatilsynet and the EDPB, with transfer impact assessments where needed. Datatilsynet's guidance on transfers to third countries (4th edition, April 2024) sets out the rules.

    Danish Data Protection Agency (Datatilsynet) · Datatilsynet, 'Vejledning om overførsel til tredjelande' (4th ed., April 2024)

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • RestrictionAnnounced

    Grid emergency plan (akutplan for elnettet): priority model puts most data centres last in the grid connection queue

    Voting agreement of 1 October 2026 between the government (S, SF, M, RV) and V, DF, K, EL and ALT (following a political understanding of 29 June 2026) to pass a bill amending the Electricity Supply Act with a priority model for grid connections when capacity is short. Category 1: protected needs and critical functions (normal demand growth, households, small firms, defence, health); 2: direct electrification, renewables, CCS, hydrogen and PtX; 3: energy storage; 4: certain large energy consumers, as a rule data centres that are not tied to a location. Data centres serving critical societal functions can be placed in category 1. Energinet and grid companies may refuse requests in categories 3 and 4 (appeal to Forsyningstilsynet); grid-friendliness (flexible demand) can improve the position in categories 2 to 4. A separate work stream will look at how data centres can connect without crow

    4 priority category Most data centres placed in category 4 of 4 (lowest); bill still to be passed

    Ministry of Climate, Energy and Utilities (Klima-, Energi- og Forsyningsministeriet); Folketing · Klima-, Energi- og Forsyningsministeriet, 'Aftale om akutplan for elnettet' (1 Oct 2026)

  • Grid accessAnnounced

    Energinet new model for larger grid connections: joint processing, stricter maturity requirements, new agreements from autumn 2026

    Energinet announced on 27 May 2026 that requests for larger connections to the transmission grid will be handled together as one batch and assessed against stricter project-maturity requirements, and that it will sign new grid connection agreements only from autumn 2026. The government's priority model (PP-DK-003) is meant to apply to that autumn allocation.

    Energinet · Energinet news, 'Energinet indfører ny model for større tilslutninger og vil først underskrive nye nettilslutningsaftaler til efteråret' (27 May 2026)

Timeline of data center and power policy in Denmark

DateActionTypeStatusAuthority
1 Oct 2026Grid emergency plan (akutplan for elnettet): priority model puts most data centres last in the grid connection queueRestrictionAnnouncedMinistry of Climate, Energy and Utilities (Klima-, Energi- og Forsyningsministeriet); Folketing
27 May 2026Energinet new model for larger grid connections: joint processing, stricter maturity requirements, new agreements from autumn 2026Grid accessAnnouncedEnerginet
2 Mar 2026Energinet temporary pause on new grid connection agreements to the transmission gridMoratoriumIn forceEnerginet (state-owned TSO, Ministry of Climate, Energy and Utilities)
2 Oct 2025Executive Order 1167/2025: data centres above 1 MW must make a cost-benefit analysis and use surplus heat where feasibleEfficiency ruleIn forceDanish Energy Agency (Energistyrelsen)
9 Jul 2024Executive Order 926/2024: data centres of 500 kW IT load or more must report energy performance to the EU databaseEfficiency ruleIn forceDanish Energy Agency (Energistyrelsen)
25 May 2018Personal data transfers outside the EU/EEA: GDPR chapter V as applied by DatatilsynetRegulationIn forceDanish Data Protection Agency (Datatilsynet)

How Denmark compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Peru—62.6% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
Sri Lanka—60.2% (2025)—00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10

Questions

Is there a data center moratorium in Denmark?

Yes. 1 restriction on new data centers is in force in Denmark: Energinet temporary pause on new grid connection agreements to the transmission grid.

What does electricity cost for data centers in Denmark?

The industrial electricity price in Denmark was 134 USD/MWh in 2025 (Eurostat nrg_pc_205, Denmark, band IE (20,000 to 69,999 MWh), excluding VAT and other recoverable taxes: 2025-S1 0.1203 EUR/kWh, 2025-S2 0.1163 EUR/kWh; mean 0.1183 EUR/kWh = 118.3 EUR/MWh x 1.1300 USD/EUR (Eurostat ert_bil_eur_a, 2025 annual average) = 1). Data center contracts can differ by voltage level, contract length and location.

How much of Denmark’s electricity is renewable?

Renewables supplied 81.5% of electricity generation in Denmark in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst