Data Center Power & Policy in South Korea

Every government action on data centers and power in South Korea that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 8 October 2026, DC Market Insights tracks 7 government actions on data centers and power in South Korea, 2 of them in force. We have found no moratorium or restriction on new data centers in force in South Korea.

7Actions tracked
2In force
—Industrial power price
9.8%Renewable share of generation

Market snapshot

South Korea power and policy: key facts

  • Renewable share of electricity generation: 9.8% (2025). Rank 13 of 16 tracked countries, highest first.
  • Latest change: Region-based electricity tariffs and dedicated AI data centre tariff (Government of Korea (Ministry of Climate, Energy and Environment), 29 Jun 2026).
  • By type: 3 plan or strategy, 1 power tariff, 1 grid access and 1 incentive.

Power indicators for South Korea

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 9.8% 2025 · Renewable share of electricity generation 2025, stated in the 1st Renewable Energy Basic Plan (May 2026, Ministry of Climate, Energy and Environment) 2024: 9% KESIS (1st Renewable Energy Basic Plan PDF)
Peak electricity demand 102 GW 2024 · 2024 summer peak demand as stated in the 11th Basic Plan for Electricity Supply and Demand (MOTIE, Feb 2025) 2023: 98.3 GW KESIS (MOTIE 11th Basic Plan PDF)
Installed generation capacity 161 GW 2026 · KPX 전력수급실적 daily table, 설비용량(MW) column = 161,478 MW on 2026-10-06 (unchanged since 2026-09-30); 161,478 MW / 1000 = 161.478 GW Korea Power Exchange (KPX)

In force now in South Korea

Plan or strategy (2)

  • Plan or strategyIn force

    National AI Computing Center project: operator selection of Samsung SDS-led consortium

    MSIT finalised selection of a Samsung SDS-led consortium as operator of the national AI computing centre in Haenam. Initial capital is 400 billion won and total investment 2.5 trillion won; the facility is to hold 15,000 advanced AI semiconductor units by 2028, with the SPC to be set up in Q2 and construction to begin in Q3 2026.

    2.5 trillion KRW total investment Announced 'Sunday' per article dated 12 May 2026, i.e. 10 May 2026

    Ministry of Science and ICT (MSIT) · Haenam, South Jeolla

  • Plan or strategyIn force

    11th Basic Plan for Electricity Supply and Demand (2024-2038)

    Plan notified 21 Feb 2025 by the Ministry of Trade, Industry and Energy. For the first time it reflects data centre and electrification demand separately. Data centre demand is projected from new KEPCO electricity-use applications multiplied by utilisation rates, adding 15.5 TWh of consumption and 4.4 GW of summer peak by 2038 versus trend; 2023 data centre demand was 5.0 TWh (0.6 GW). 2038 summer peak target demand is 129.3 GW.

    4.4 GW added summer peak from data centres b Plan text: '’38년 전력소비량 15.5TWh, 최대전력( ) 하계 4.4GW 증가'; 2023 actual data centre demand '5.0TWh, 0.6GW'

    Ministry of Trade, Industry and Energy (MOTIE) · Korea Energy Economics Institute KESIS (MOTIE plan PDF)

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Power tariffAnnounced

    Region-based electricity tariffs and dedicated AI data centre tariff

    As part of the 29 June 2026 AI data centre plan, the government plans a new electricity pricing system with region-based tariffs offering more competitive rates, and a dedicated tariff for AI data centres.

    Government of Korea (Ministry of Climate, Energy and Environment)

  • Plan or strategyAnnounced

    National AI data centre investment plan: 18.4 GW AI data centre capacity with SK, GS and Naver

    Government plan announced 29 June 2026: 550 trillion won with domestic companies; first phase 8.4 GW of AI data centre capacity by 2029 (SK 1 GW each in Ulsan, Honam and the central region; Naver Sejong to 1 GW; GS 2.4 GW in Donghae), reaching 18.4 GW combined. Also transmission line capacity expansion and a target of 100 GW renewables by 2030.

    18.4 GW AI data centre capacity

    Government of Korea (Ministry of Climate, Energy and Environment; Ministry of Science and ICT)

  • Grid accessAnnounced

    Special Act on the Promotion of the Artificial Intelligence Data Center Industry (AIDC Special Act)

    At a 16 June 2026 National AI Strategy Committee policy seminar, MSIT outlined key provisions of the AIDC Special Act: integrated processing of permits and approvals for data centre construction, designation of specialised AIDC zones (with financial support for companies in those zones among the matters the committee reviews), and exemptions from power grid impact assessments for projects outside the metropolitan area. The act is scheduled to take effect in March 2027 (source gives month only). The source does not state when the act passed the National Assembly or was promulgated.

    Ministry of Science and ICT; National AI Strategy Committee · Effective 1 Mar 2027

  • IncentiveAnnounced

    Carbon-Zero Underwater Data Center Standard Model Development Project (Ulsan)

    The Ministry of Oceans and Fisheries selected Ulsan for the Carbon-Zero Underwater Data Center Standard Model Development Project and will provide 40 billion won (about USD 29 million) of central government funding over five years for a seawater-cooled data centre off Ulsan; site analysis and basic design start in 2026, demonstration by 2030, commercial construction from 2031.

    40 billion KRW central funding

    Ministry of Oceans and Fisheries · Ulsan

  • RegulationAnnounced

    MSIT measures to bring large private data centres under the government disaster management system

    Following the October 2022 Kakao data centre fire, the Ministry of Science and ICT announced that all large data centres will be subject to a government disaster management system with regular inspections and safety drills, plus nationwide inspections of data centres and network infrastructure; small and mid-sized companies are likely to be exempt.

    Ministry of Science and ICT (MSIT)

Timeline of data center and power policy in South Korea

DateActionTypeStatusAuthority
29 Jun 2026Region-based electricity tariffs and dedicated AI data centre tariffPower tariffAnnouncedGovernment of Korea (Ministry of Climate, Energy and Environment)
29 Jun 2026National AI data centre investment plan: 18.4 GW AI data centre capacity with SK, GS and NaverPlan or strategyAnnouncedGovernment of Korea (Ministry of Climate, Energy and Environment; Ministry of Science and ICT)
16 Jun 2026Special Act on the Promotion of the Artificial Intelligence Data Center Industry (AIDC Special Act)Grid accessAnnouncedMinistry of Science and ICT; National AI Strategy Committee
10 May 2026National AI Computing Center project: operator selection of Samsung SDS-led consortium Haenam, South JeollaPlan or strategyIn forceMinistry of Science and ICT (MSIT)
10 Apr 2026Carbon-Zero Underwater Data Center Standard Model Development Project (Ulsan) UlsanIncentiveAnnouncedMinistry of Oceans and Fisheries
21 Feb 202511th Basic Plan for Electricity Supply and Demand (2024-2038)Plan or strategyIn forceMinistry of Trade, Industry and Energy (MOTIE)
21 Oct 2022MSIT measures to bring large private data centres under the government disaster management systemRegulationAnnouncedMinistry of Science and ICT (MSIT)

How South Korea compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01

Questions

Is there a data center moratorium in South Korea?

We have found no moratorium or restriction on new data centers in force in South Korea as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.

How much of South Korea’s electricity is renewable?

Renewables supplied 9.8% of electricity generation in South Korea in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.