Proprietary data

Data Centers in Colombia

Every data center in Colombia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 16 data centers in Colombia run by 11 operators: 10 operational, 3 under construction and 3 planned. Stated operational capacity is 7 MW, with a further 9.6 MW under construction and 9.6 MW planned. Cirion Technologies holds the largest share of tracked operational capacity (100%).

16Facilities tracked
11Operators
7 MWOperational (10 sites)
9.6 MWUnder construction (3 sites)
9.6 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 16 facilities have a stated capacity; the others are counted as sites only.

BG1 · Equinix · Bogotá (approximate location)BG2 · Equinix · Bogotá (approximate location)BG01 · ODATA · Cota (approximate location)SBOGZB01 · Scala Data Centers · Bogotá (approximate location)SBOGZB02-SBOGZB03 · Scala Data Centers · Bogotá (approximate location)BOG01 · EdgeConneX · Bogotá (approximate location)BOG02 · EdgeConneX · Bogotá (approximate location)BOG11 · EdgeConneX · Bogotá (approximate location)BOG2 · Cirion Technologies · Bogotá (approximate location)BOG 1 · KIO Networks · Bogotá (approximate location)Liberty Networks Tocancipá Data Center · Liberty Networks · Tocancipá (approximate location)IFX Cali Data Center · IFX Networks · Cali (approximate location)Tigo Bogotá Titanium Data Center · Tigo · Bogotá (approximate location)Oracle Cloud Bogotá Region · Oracle · Bogotá (approximate location)Triara · Claro · Bogotá (approximate location)
Operational Under construction Planned

Market snapshot

Colombia data center market: key facts

  • Capacity under construction or planned (19.2 MW) is 2.7 times the operational base of 7 MW.
  • The three largest operators by operational capacity, Cirion Technologies, EdgeConneX and Scala Data Centers, hold 100% of tracked operational MW.
  • EdgeConneX has the largest development pipeline in Colombia: 19.2 MW under construction or planned.
  • The largest operational facility we track is BOG2 (Cirion Technologies, Bogotá) at 7 MW.
  • The largest project in the pipeline is BOG01 by EdgeConneX (9.6 MW, planned).
  • Bogotá is the largest cluster: 15 of 16 facilities and 100% of tracked capacity.
  • By type, the tracker lists 11 colocation, 4 hyperscale and 1 enterprise facilities.
  • 3 of 16 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational7 MW
Under construction9.6 MW
Planned9.6 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Colombia by tracked capacity, MW
EdgeConneX19.2 MW

OperationalUnder construction or planned

Facilities by type
Colocation11
Hyperscale4
Enterprise1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Colombia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
EdgeConneX3—19.2 MW—
Scala Data Centers3———
Equinix2———
Cirion Technologies17 MW—100%
Claro1———
Tigo1———
Oracle1———
Liberty Networks1———
IFX Networks1———
ODATA1———
KIO Networks1———

Largest data center projects in Colombia

Under construction and planned facilities with a stated capacity, largest first. 9.6 MW under construction and 9.6 MW planned in total.

ProjectLocationStatusTypeCapacity
BOG01EdgeConneX Bogotá Planned Colocation 9.6 MW
BOG02EdgeConneX Bogotá Under construction Colocation 9.6 MW

How Colombia compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States8751263,666 MW6,296 MW
Argentina5510.5 MW920 MW
Brazil14743363 MW465 MW
Chile441682.6 MW663 MW
Colombia16117 MW19.2 MW
Peru534.7 MW20 MW
Guatemala21—2 MW
Ecuador111 MW—
Panama22——
Uruguay11——
Bolivia11——
Dominican Republic11——

Facilities

16 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
BOG01EdgeConneX Bogotá Planned 9.6 MW IT — Operator / official
BOG02EdgeConneX Bogotá Under construction 9.6 MW IT — Operator / official
BOG2Cirion Technologies Bogotá Operational 7 MW total — Operator / official
BG01ODATA Cota Operational — — Operator / official
BG1Equinix Bogotá Operational — — Operator / official
BG2Equinix Bogotá Operational — — Operator / official
BOG 1KIO Networks Bogotá Operational — — Operator / official
BOG11EdgeConneX Bogotá Under construction — — Operator / official
IFX Cali Data CenterIFX Networks Cali Operational — — Operator / official
Liberty Networks Tocancipá Data CenterLiberty Networks Tocancipá Operational — — Operator / official
Oracle Cloud Bogotá RegionOracle Bogotá Operational — 2023 Trade press
SBOGZB01Scala Data Centers Bogotá Under construction — — Operator / official
SBOGZB02-SBOGZB03Scala Data Centers Bogotá Planned — — Operator / official
SBOGZM01Scala Data Centers Bogotá Planned — — Operator / official
Tigo Bogotá Titanium Data CenterTigo Bogotá Operational — — Trade press
TriaraClaro Bogotá Operational — — Trade press

Get the data

Every data center in Colombia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

All countries

Global Data Center Database: annual licence

1,938 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

$1,499 USD / year

Subscribe

Full database now, a fresh file every month. Renews yearly; cancel anytime in PayPal.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in Colombia

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

Secure checkout

Data pack

Loading secure checkout…

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Colombia?

DC Market Insights tracks 16 data centers in Colombia as of October 2026: 10 operational, 3 under construction and 3 planned, run by 11 operators. The count grows as we verify more sites.

What is the data center capacity of Colombia?

Tracked operational capacity in Colombia is 7 MW, with 9.6 MW under construction and 9.6 MW planned. These totals use the capacity each source states (IT load where given) and cover 3 of 16 tracked facilities.

Which companies operate the most data center capacity in Colombia?

By tracked operational capacity, the largest operators in Colombia are Cirion Technologies (7 MW).

Where are the data centers in Colombia located?

The largest clusters by tracked capacity are Bogotá (15 facilities) and Cali (1 facilities). The map above shows every site.

Which new data centers are being built in Colombia?

We track 9.6 MW under construction and 9.6 MW planned. The largest projects are BOG01 by EdgeConneX (9.6 MW) and BOG02 by EdgeConneX (9.6 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.