In short
As of 11 October 2026, DC Market Insights tracks 22 data centers operated by Cologix in 1 country, of which 19 are operational. Stated operational capacity is 40 MW, with a further 51 MW under construction and — planned. The pipeline is 1.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 22 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Cologix data centers: key facts
About Cologix
Cologix runs network-neutral interconnection and hyperscale edge data centers in North America. Its website stated in October 2026 that it operates 45+ data centers across 13 North American markets.
- Headquarters
- Denver, United States
- Founded
- 2010
- Tracked footprint
- 22 facilities in 1 country
- Website
- cologix.com
Company details checked against company and official sources, 10 Oct 2026.
- Capacity under construction or planned (51 MW) is 1.3 times the operational base of 40 MW.
- Its largest operational site is Cologix COL4 in Columbus, United States at 40 MW.
- The largest project in the pipeline is Cologix ASH2 Ashburn (51 MW, under construction).
- By type, the tracker lists 20 colocation and 2 hyperscale facilities.
- 2 of 22 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Cologix development pipeline
Under construction and planned facilities with a stated capacity, largest first. 51 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Cologix ASH2 AshburnCologix | Ashburn, United States | Under construction | Colocation | 51 MW |
Facilities
22 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Cologix ASH2 AshburnColocation | Ashburn, United States | Under construction | 51 MW total | — | Operator / official |
| Cologix COL4Colocation | Columbus, United States | Operational | 40 MW total | — | Operator / official |
| Cologix ASH1 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Cologix COL1Colocation | Columbus, United States | Operational | — | 2014 | Operator / official |
| Cologix COL2Colocation | Columbus, United States | Operational | — | 2014 | Operator / official |
| Cologix COL3Colocation | Columbus, United States | Operational | — | 2018 | Operator / official |
| Cologix COL5Colocation | Columbus, United States | Operational | — | — | Operator / official |
| Cologix COL7Hyperscale | Johnstown, United States | Planned | — | — | Operator / official |
| Cologix COL8Hyperscale | Johnstown, United States | Planned | — | — | Operator / official |
| Cologix DAL1 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Cologix DAL2 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Cologix DAL3 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Cologix MIN1Colocation | Minneapolis, United States | Operational | — | — | Operator / official |
| Cologix MIN2Colocation | Minneapolis, United States | Operational | — | — | Operator / official |
| Cologix MIN3Colocation | Minneapolis, United States | Operational | — | — | Operator / official |
| Cologix MIN4Colocation | Minneapolis, United States | Operational | — | — | Operator / official |
| Cologix MIN5Colocation | Minneapolis, United States | Operational | — | — | Operator / official |
| Cologix NNJ2 Cedar KnollsColocation | Cedar Knolls, United States | Operational | — | — | Operator / official |
| Cologix NNJ3 ParsippanyColocation | Parsippany, United States | Operational | — | — | Operator / official |
| Cologix NNJ4 Cedar KnollsColocation | Cedar Knolls, United States | Operational | — | — | Operator / official |
| JAX1Colocation | Jacksonville, United States | Operational | — | — | Operator / official |
| JAX2Colocation | Jacksonville, United States | Operational | — | — | Operator / official |
Market position
How Cologix compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Cologix ranks #36 of 166 tracked operators by capacity, with 0.2% of the country’s tracked MW.
- United States has 1,173 tracked data centers from 166 operators: 7,181 MW operational and 33,216 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Columbus also hosts 1 other tracked data center(s), run by Google.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 29 | 1,000 MW | 7,000 MW |
| Tract | 15 | — | 4,800 MW |
| Microsoft | 48 | — | 2,000 MW |
| Vantage Data Centers | 22 | 135 MW | 1,734 MW |
| Crusoe | 1 | 1,200 MW | — |
| SB Energy | 1 | — | 1,200 MW |
| Centersquare | 31 | 1,125 MW | — |
All data centers in United States Power and policy in United States
Other data centers in Columbus
- Google Columbus · Google · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Cologix operate?
DC Market Insights tracks 22 Cologix data center(s) in 1 country as of October 2026: 19 operational, 1 under construction and 2 planned.
Where is Cologix headquartered?
Cologix is headquartered in Denver, United States.
Which other companies operate data centers in United States?
Besides Cologix, the largest operators we track in United States by capacity are PowerHouse Data Centers, Meta, Tract, Microsoft and Vantage Data Centers. The United States page lists all 166 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 13 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Columbus?
Other tracked data centers in Columbus include Google Columbus (Google).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?