Proprietary data
Vantage Data Centers Data Centers
Data centers operated by Vantage Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 8 October 2026, DC Market Insights tracks 27 data centers operated by Vantage Data Centers in 4 countries, of which 17 are operational. Stated operational capacity is 758 MW, with a further 436 MW under construction and 390 MW planned. The pipeline is 1.1 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 12 of 27 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Vantage Data Centers data centers: key facts
About Vantage Data Centers
Vantage Data Centers describes itself as a global provider of digital infrastructure serving AI and cloud innovators, with operations spanning North America, EMEA and Asia Pacific (press release datelined Denver, 14 September 2026).
- Headquarters
- Denver, United States
- Founded
- 2010
- Ownership
- Equity led by DigitalBridge and Silver Lake ($9.2B investment, 2024)
- Tracked footprint
- 27 facilities in 4 countries
- Website
- vantage-dc.com
Company details checked against company and official sources, 7 Oct 2026.
- Capacity under construction or planned (826 MW) is 1.1 times the operational base of 758 MW.
- Its largest operational site is JHB1 in Kulai, Malaysia at 300 MW.
- The largest project in the pipeline is KUL2 (Cyberjaya II campus) by Vantage Data Centers (436 MW, under construction).
- Malaysia accounts for 48% of tracked capacity (3 facilities).
- 12 of 27 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Vantage Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 436 MW under construction and 390 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| KUL2 (Cyberjaya II campus)Vantage Data Centers | Cyberjaya, Malaysia | Under construction | Hyperscale | 436 MW |
| Vantage Trident AuroraVantage Data Centers | Aurora, United States | Planned | Hyperscale | 334 MW |
| Frankfurt I (FRA1)Vantage Data Centers | Offenbach, Germany | Planned | Hyperscale | 56 MW |
Facilities
27 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
KUL2 (Cyberjaya II campus)Hyperscale
History
|
Cyberjaya, Malaysia | Under construction | 436 MW IT | — | Operator / official |
| Vantage Trident AuroraHyperscale | Aurora, United States | Planned | 334 MW IT | — | Trade press |
| JHB1Hyperscale | Kulai, Malaysia | Operational | 300 MW IT | — | Operator / official |
Cardiff Campus (Newport)Hyperscale
2 deals
|
Newport, United Kingdom | Operational | 148 MW IT | — | Operator / official |
| Vantage WA1 QuincyHyperscale | Quincy, United States | Operational | 89 MW IT | — | Operator / official |
Berlin I (BER1)Hyperscale
History
|
Ludwigsfelde, Germany | Operational | 56 MW IT | — | Operator / official |
| Frankfurt I (FRA1)Hyperscale | Offenbach, Germany | Planned | 56 MW IT | — | Operator / official |
Frankfurt II (FRA2)Hyperscale
History
|
Raunheim, Germany | Operational | 56 MW IT | — | Operator / official |
Berlin II (BER2)Hyperscale
History
|
Mittenwalde, Germany | Operational | 32 MW IT | — | Operator / official |
| Cyberjaya campus 1Hyperscale | Cyberjaya, Malaysia | Operational | 31 MW IT | — | Trade press |
| Vantage VA11 (Ashburn VA1 campus)Hyperscale | Sterling, United States | Operational | 30 MW IT | — | Operator / official |
| Vantage VA12 (Ashburn VA1 campus)Hyperscale | Sterling, United States | Operational | 16 MW IT | — | Operator / official |
| Vantage Ashburn II (VA2) campusHyperscale | Sterling, United States | Planned | — | — | Operator / official |
| Vantage Ashburn III (VA3) campusHyperscale | Ashburn, United States | Planned | — | — | Operator / official |
Vantage AZ1 GoodyearHyperscale
History
|
Goodyear, United States | Under construction | — | — | Operator / official |
| Vantage CA11 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
| Vantage CA12 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
| Vantage CA13 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
| Vantage CA14 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
| Vantage CA15 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
| Vantage CA16 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
Vantage CA21 Santa ClaraHyperscale
History
|
Santa Clara, United States | Operational | — | — | Trade press |
| Vantage CA22 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Trade press |
| Vantage CA3 Santa ClaraHyperscale | Santa Clara, United States | Planned | — | — | Operator / official |
| Vantage Fredericksburg (VA4) campusHyperscale | Fredericksburg, United States | Planned | — | — | Operator / official |
| Vantage Frontier Shackelford CountyHyperscale | United States | Under construction | — | — | Operator / official |
| Vantage NV1Hyperscale | United States | Planned | — | — | Operator / official |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Vantage Data Centers operate?
DC Market Insights tracks 27 Vantage Data Centers data centers in 4 countries as of October 2026: 17 operational, 3 under construction and 7 planned.
Where is Vantage Data Centers headquartered?
Vantage Data Centers is headquartered in Denver, United States. Ownership: Equity led by DigitalBridge and Silver Lake ($9.2B investment, 2024).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.