Bell Canada Data Centers
Data centers operated by Bell Canada that we have verified: location, status and capacity, each checked against its source.
In short
As of 16 October 2026, DC Market Insights tracks 1 data center operated by Bell Canada in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Bell Canada data centers: key facts
- The largest project in the pipeline is Bell AI Fabric Saskatchewan (Sherwood) campus (300 MW, under construction).
Bell Canada development pipeline
Under construction and planned facilities with a stated capacity, largest first. 300 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Bell AI Fabric Saskatchewan (Sherwood) campusBell Canada | Sherwood (RM), Canada | Under construction | Hyperscale | 300 MW |
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Bell AI Fabric Saskatchewan (Sherwood) campusHyperscale
History
|
Sherwood (RM), Canada | Under construction | 300 MW total | — | Operator / official |
Market position
How Bell Canada compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Canada, Bell Canada ranks #2 of 10 tracked operators by capacity, with 16% of the country’s tracked MW.
- Canada has 62 tracked data centers from 10 operators: 465 MW operational and 1,450 MW under construction or planned.
- Our Deal Tracker lists 1 deal(s) naming Bell Canada, the latest on 14 September 2026.
Data center operators in Canada
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Meta | 1 | — | 1,000 MW |
| eStruxture | 16 | 148 MW | 90 MW |
| Vantage Data Centers | 4 | 127 MW | — |
| Cologix | 23 | 86.4 MW | — |
| QScale | 2 | — | 60 MW |
| STACK Infrastructure | 1 | 56 MW | — |
| Centersquare | 2 | 47.8 MW | — |
| Equinix | 11 | — | — |
All data centers in Canada Power and policy in Canada
Deals naming Bell Canada
- Bell Canada (BCE) – Bell AI Fabric → Bell AI data centre project, Regina area, Saskatchewan (expanded to pathway to 1.2 GW) Land / campus
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Bell Canada operate?
DC Market Insights tracks 1 Bell Canada data center(s) in 1 country as of October 2026: 0 operational, 1 under construction and 0 planned.
Which other companies operate data centers in Canada?
Besides Bell Canada, the largest operators we track in Canada by capacity are Meta, eStruxture, Vantage Data Centers, Cologix and QScale. The Canada page lists all 10 operators.
What rules apply to data centers in Canada?
Our Power & Policy Tracker lists 8 government actions on data centers and power in Canada, including 2 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.