In short
As of 7 October 2026, DC Market Insights tracks 22 data centers operated by CyrusOne in 3 countries, of which 17 are operational. Stated operational capacity is 393 MW, with a further 108 MW under construction and 192 MW planned. The pipeline is 0.8 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 21 of 22 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
CyrusOne data centers: key facts
About CyrusOne
CyrusOne owns, develops and operates data centers for hyperscale and enterprise organizations across North America, EMEA and APAC. Its website states that it has more than 60 operational data centers and serves 9 countries, as stated on its website in October 2026.
- Headquarters
- Dallas, United States
- Founded
- 2001
- Ownership
- Owned by funds managed by KKR and Global Infrastructure Partners (GIP)
- Tracked footprint
- 22 facilities in 3 countries
- Website
- cyrusone.com
Company details checked against company and official sources, 7 Oct 2026.
- Capacity under construction or planned (300 MW) is 0.8 times the operational base of 393 MW.
- Its largest operational site is CyrusOne Sterling NVA5-NVA7 in Sterling, United States at 116 MW.
- The largest project in the pipeline is CyrusOne LON6 (108 MW, planned).
- United States accounts for 38% of tracked capacity (8 facilities).
- By type, the tracker lists 16 colocation and 6 hyperscale facilities.
- 21 of 22 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
CyrusOne development pipeline
Under construction and planned facilities with a stated capacity, largest first. 108 MW under construction and 192 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| CyrusOne LON6CyrusOne | Iver Heath, United Kingdom | Planned | Hyperscale | 108 MW |
| FRA6CyrusOne | Frankfurt am Main, Germany | Planned | Colocation | 84 MW |
| FRA5CyrusOne | Hanau am Main, Germany | Under construction | Colocation | 54 MW |
| FRA7CyrusOne | Frankfurt am Main, Germany | Under construction | Colocation | 54 MW |
Facilities
22 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| CyrusOne Sterling NVA5-NVA7Hyperscale | Sterling, United States | Operational | 116 MW IT | — | Operator / official |
| CyrusOne LON6Hyperscale | Iver Heath, United Kingdom | Planned | 108 MW IT | — | Operator / official |
| FRA6Colocation | Frankfurt am Main, Germany | Planned | 84 MW IT | — | Operator / official |
| FRA5Colocation | Hanau am Main, Germany | Under construction | 54 MW IT | — | Operator / official |
FRA7Colocation
History
|
Frankfurt am Main, Germany | Under construction | 54 MW total | — | Trade press |
| CyrusOne Sterling NVA1-NVA3Hyperscale | Sterling, United States | Operational | 44 MW IT | — | Operator / official |
| CyrusOne Sterling NVA9Hyperscale | Sterling, United States | Operational | 38 MW IT | — | Operator / official |
| CyrusOne Sterling NVA8Hyperscale | Sterling, United States | Operational | 24 MW IT | — | Operator / official |
| CyrusOne Somerset NYM1Colocation | Somerset, United States | Operational | 23 MW IT | — | Operator / official |
| FRA3Colocation | Frankfurt am Main, Germany | Operational | 22 MW IT | — | Operator / official |
| CyrusOne LON4Colocation | Slough, United Kingdom | Operational | 18 MW IT | — | Operator / official |
| CyrusOne LON5Colocation | Slough, United Kingdom | Operational | 18 MW IT | — | Operator / official |
| FRA2Colocation | Frankfurt am Main, Germany | Operational | 18 MW IT | — | Operator / official |
| CyrusOne LON2Colocation | London, United Kingdom | Operational | 14 MW IT | — | Operator / official |
| CyrusOne Sterling NVA4Hyperscale | Sterling, United States | Operational | 11 MW IT | — | Operator / official |
| FRA4Colocation | Frankfurt am Main, Germany | Operational | 11 MW IT | — | Operator / official |
| CyrusOne LON1Colocation | Slough, United Kingdom | Operational | 9 MW IT | — | Operator / official |
| CyrusOne LON3Colocation | Slough, United Kingdom | Operational | 9 MW IT | — | Operator / official |
| FRA1Colocation | Frankfurt am Main, Germany | Operational | 9 MW IT | — | Operator / official |
| CyrusOne Totowa NYM2Colocation | Totowa, United States | Operational | 6 MW IT | — | Operator / official |
| CyrusOne Wappingers Falls NYM7Colocation | Wappingers Falls, United States | Operational | 3 MW IT | — | Operator / official |
CyrusOne SouthallColocation
History
|
Southall, United Kingdom | Planned | — | — | Trade press |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does CyrusOne operate?
DC Market Insights tracks 22 CyrusOne data centers in 3 countries as of October 2026: 17 operational, 2 under construction and 3 planned.
Where is CyrusOne headquartered?
CyrusOne is headquartered in Dallas, United States. Ownership: Owned by funds managed by KKR and Global Infrastructure Partners (GIP).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.