AtlasEdge Data Centers

Data centers operated by AtlasEdge that we have verified: location, status and capacity, each checked against its source.

In short

As of 10 October 2026, DC Market Insights tracks 10 data centers operated by AtlasEdge in 3 countries, of which 9 are operational. Stated operational capacity is 35.2 MW, with a further 4.4 MW under construction and — planned. The pipeline is 0.1 times the capacity already operating.

10Facilities tracked
3Countries
35.2 MWOperational (9 sites)
4.4 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 10 facilities have a stated capacity; the others are counted as sites only.

BER001 · AtlasEdge · Berlin (approximate location)HAM001 · AtlasEdge · Hamburg (approximate location)HAM002 · AtlasEdge · Ahrensburg (approximate location)DUS001 · AtlasEdge · Hilden (approximate location)LEV001 · AtlasEdge · Leverkusen (approximate location)LEV002 · AtlasEdge · Leverkusen (approximate location)STR001 · AtlasEdge · Böblingen (approximate location)AMS001 · AtlasEdge · Amsterdam (approximate location)AMS002 · AtlasEdge · Amsterdam (approximate location)BRU001 · AtlasEdge · Nossegem (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

AtlasEdge data centers: key facts

About AtlasEdge

AtlasEdge designs, builds and operates data centres in European markets, with sites listed in Barcelona, Berlin, Brussels, Düsseldorf, Hamburg, Leverkusen, Lisbon, Manchester, Stuttgart and Vienna, as stated on its website in October 2026. It was formed in 2021 through joint investment from DigitalBridge and Liberty Global and began by acquiring 12 data centres from Colt.

Founded
2021
Ownership
Backed by DigitalBridge and Liberty Global (joint investment)
Tracked footprint
10 facilities in 3 countries
Website
atlasedge.com

Company details checked against company and official sources, 10 Oct 2026.

  • Capacity under construction or planned (4.4 MW) is 0.1 times the operational base of 35.2 MW.
  • Its largest operational site is DUS001 in Hilden, Germany at 11.2 MW.
  • The largest project in the pipeline is LEV002 by AtlasEdge (4.4 MW, under construction).
  • Germany accounts for 100% of tracked capacity (7 facilities).
  • 5 of 10 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational35.2 MW
Under construction4.4 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

AtlasEdge development pipeline

Under construction and planned facilities with a stated capacity, largest first. 4.4 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
LEV002AtlasEdge Leverkusen, Germany Under construction Colocation 4.4 MW

Facilities

10 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DUS001Colocation Hilden, Germany Operational 11.2 MW IT — Operator / official
HAM002Colocation
History
  1. Under construction
  2. Operational
Ahrensburg, Germany Operational 11.2 MW IT — Operator / official
STR001Colocation Böblingen, Germany Operational 11.2 MW IT — Operator / official
LEV002Colocation Leverkusen, Germany Under construction 4.4 MW IT — Operator / official
LEV001Colocation Leverkusen, Germany Operational 1.6 MW IT — Operator / official
AMS001Colocation Amsterdam, Netherlands Operational — — Operator / official
AMS002Colocation Amsterdam, Netherlands Operational — — Operator / official
BER001Colocation Berlin, Germany Operational — — Operator / official
BRU001Colocation Nossegem, Belgium Operational — — Operator / official
HAM001Colocation Hamburg, Germany Operational — — Operator / official

Market position

How AtlasEdge compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Germany, AtlasEdge ranks #20 of 53 tracked operators by capacity, with 0.7% of the country’s tracked MW.
  • Germany has 175 tracked data centers from 53 operators: 845 MW operational and 4,436 MW under construction or planned.
  • Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
  • In Netherlands, AtlasEdge is one of 30 operators we track.
  • In Belgium, AtlasEdge is one of 8 operators we track.

Data center operators in Germany

Tracked facilities17553 operators
Operational capacity845 MW4,436 MW in the pipeline
AtlasEdge rank by capacity#20of 53 operators · 0.7%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Data center operators in Netherlands

Tracked facilities9930 operators
Operational capacity79.1 MW10 MW in the pipeline
AtlasEdge rank by capacity#15of 30 operators
Industrial power price148 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NorthC1447 MW—
NTT DATA120.7 MW—
Iron Mountain2—10 MW
maincubes15 MW—
QTS44.8 MW—
Penta Infra41.6 MW—
Digital Realty12——
Equinix12——

All data centers in Netherlands Power and policy in Netherlands

Data center operators in Belgium

Tracked facilities278 operators
Operational capacity8.4 MW— in the pipeline
AtlasEdge rank by capacity#7of 8 operators
Industrial power price183 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Penta Infra17.2 MW—
nLighten11.2 MW—
Datacenter United13——
LCL5——
Digital Realty3——
Google2——
KevlinX1——

All data centers in Belgium Power and policy in Belgium

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does AtlasEdge operate?

DC Market Insights tracks 10 AtlasEdge data center(s) in 3 countries as of October 2026: 9 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Germany?

Besides AtlasEdge, the largest operators we track in Germany by capacity are NTT DATA, AM:PM Grund, Telis Energie Deutschland, Schwarz Digits (STACKIT) and CloudHQ. The Germany page lists all 53 operators.

What rules apply to data centers in Germany?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.