In short
As of 10 October 2026, DC Market Insights tracks 24 data centers operated by NorthC in 2 countries, of which 21 are operational. Stated operational capacity is 60.5 MW, with a further 6 MW under construction and 11.5 MW planned. The pipeline is 0.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 20 of 24 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
NorthC data centers: key facts
About NorthC
NorthC provides colocation and connectivity services in the Netherlands, Germany and Switzerland. It was formed in 2020 when The Datacenter Group and NLDC joined forces, and its website lists 25 data center locations.
- Headquarters
- Amsterdam, Netherlands
- Ownership
- Owned by Antin Infrastructure Partners
- Tracked footprint
- 24 facilities in 2 countries
- Website
- northcdatacenters.com
Company details checked against company and official sources, 7 Oct 2026.
- Capacity under construction or planned (17.5 MW) is 0.3 times the operational base of 60.5 MW.
- Its largest operational site is NorthC Aalsmeer in Aalsmeer, Netherlands at 14 MW.
- The largest project in the pipeline is Berlin 1 by NorthC (7 MW, planned).
- Netherlands accounts for 60% of tracked capacity (14 facilities).
- 20 of 24 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
NorthC development pipeline
Under construction and planned facilities with a stated capacity, largest first. 6 MW under construction and 11.5 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Berlin 1NorthC | Berlin, Germany | Planned | Colocation | 7 MW |
| FRA01NorthC | Frankfurt am Main, Germany | Under construction | Colocation | 6 MW |
| Frankfurt 2NorthC | Neu-Isenburg, Germany | Planned | Colocation | 4.5 MW |
Facilities
24 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| NorthC AalsmeerColocation | Aalsmeer, Netherlands | Operational | 14 MW total | — | Operator / official |
| NorthC AlmereColocation | Almere Stad, Netherlands | Operational | 11 MW total | — | Operator / official |
| Berlin 1Colocation | Berlin, Germany | Planned | 7 MW total | — | Operator / official |
| FRA01Colocation | Frankfurt am Main, Germany | Under construction | 6 MW total | — | Trade press |
| NurembergColocation | Nuremberg, Germany | Operational | 6 MW total | — | Operator / official |
NorthC Oude MeerColocation
1 deal
|
Oude Meer, Netherlands | Operational | 4.8 MW total | — | Operator / official |
| Frankfurt 2Colocation | Neu-Isenburg, Germany | Planned | 4.5 MW total | — | Trade press |
| NorthC Eindhoven 2Colocation | Eindhoven, Netherlands | Operational | 4.5 MW total | — | Operator / official |
| NorthC Amsterdam 2Colocation | Amsterdam, Netherlands | Operational | 3.4 MW total | — | Operator / official |
| NorthC NieuwegeinColocation | Nieuwegein, Netherlands | Operational | 2.5 MW total | — | Operator / official |
| NorthC Amsterdam 1Colocation | Amsterdam, Netherlands | Operational | 2.4 MW total | — | Operator / official |
| NorthC Eindhoven 1Colocation | Eindhoven, Netherlands | Operational | 2.4 MW total | — | Operator / official |
| Munich 1Colocation | Munich, Germany | Operational | 2 MW total | — | Operator / official |
| NorthC DelftColocation | Delft, Netherlands | Operational | 1.5 MW total | — | Operator / official |
| DüsseldorfColocation | Düsseldorf, Germany | Operational | 1.3 MW total | — | Operator / official |
| HamburgColocation | Hamburg, Germany | Operational | 1.2 MW total | — | Operator / official |
| Munich 2Colocation | Munich, Germany | Operational | 1.2 MW total | — | Operator / official |
| Berlin 2Colocation | Berlin, Germany | Operational | 0.9 MW total | — | Operator / official |
| Frankfurt 3Colocation | Frankfurt am Main, Germany | Operational | 0.9 MW total | — | Trade press |
| NorthC Rotterdam WaalhavenColocation | Rotterdam, Netherlands | Operational | 0.5 MW total | — | Operator / official |
| NorthC Groningen 1Colocation | Groningen, Netherlands | Operational | — | — | Operator / official |
| NorthC Groningen 2Colocation | Groningen, Netherlands | Operational | — | — | Operator / official |
| NorthC Rotterdam Zestienhoven 1Colocation | Rotterdam, Netherlands | Operational | — | — | Operator / official |
| NorthC Rotterdam Zestienhoven 2Colocation | Rotterdam, Netherlands | Operational | — | — | Operator / official |
Market position
How NorthC compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Netherlands, NorthC ranks #1 of 30 tracked operators by capacity, with 53% of the country’s tracked MW.
- Netherlands has 99 tracked data centers from 30 operators: 79.1 MW operational and 10 MW under construction or planned.
- Industrial electricity in Netherlands costs 148 USD/MWh (2025, latest official figure).
- In Germany, NorthC ranks #20 of 50 tracked operators by capacity, with 0.7% of the country’s tracked MW.
- Rotterdam also hosts 2 other tracked data center(s), run by Eurofiber Cloud Infra and Smartdc.
- Our Deal Tracker lists 1 deal(s) naming NorthC, the latest on 23 July 2026.
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 1 | 20.7 MW | — |
| Iron Mountain | 2 | — | 10 MW |
| maincubes | 1 | 5 MW | — |
| QTS | 4 | 4.8 MW | — |
| Penta Infra | 4 | 1.6 MW | — |
| Equinix | 12 | — | — |
| Digital Realty | 12 | — | — |
| Eurofiber Cloud Infra | 8 | — | — |
All data centers in Netherlands Power and policy in Netherlands
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 578 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| CloudHQ | 2 | 112 MW | 276 MW |
| Virtus Data Centres | 2 | — | 358 MW |
| Amazon Web Services | 2 | — | 300 MW |
| maincubes | 6 | 39 MW | 226 MW |
| CyrusOne | 7 | 60 MW | 192 MW |
All data centers in Germany Power and policy in Germany
Other data centers in Rotterdam
- Datacenter Rotterdam 2 · Eurofiber Cloud Infra · Operational
- Smartdc Rotterdam · Smartdc · Operational
Deals naming NorthC
- NovoServe → NorthC Oude Meer and Maincubes Schiphol Rijk Land / campus
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does NorthC operate?
DC Market Insights tracks 24 NorthC data center(s) in 2 countries as of October 2026: 21 operational, 1 under construction and 2 planned.
Where is NorthC headquartered?
NorthC is headquartered in Amsterdam, Netherlands. Ownership: Owned by Antin Infrastructure Partners.
Which other companies operate data centers in Netherlands?
Besides NorthC, the largest operators we track in Netherlands by capacity are NTT DATA, Iron Mountain, maincubes, QTS and Penta Infra. The Netherlands page lists all 30 operators.
What rules apply to data centers in Netherlands?
Our Power & Policy Tracker lists 12 government actions on data centers and power in Netherlands, including 4 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Rotterdam?
Other tracked data centers in Rotterdam include Datacenter Rotterdam 2 (Eurofiber Cloud Infra) and Smartdc Rotterdam (Smartdc).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.