Proprietary data

NorthC Data Centers

Data centers operated by NorthC that we have verified: location, status and capacity, each checked against its source.

In short

As of 10 October 2026, DC Market Insights tracks 24 data centers operated by NorthC in 2 countries, of which 21 are operational. Stated operational capacity is 60.5 MW, with a further 6 MW under construction and 11.5 MW planned. The pipeline is 0.3 times the capacity already operating.

24Facilities tracked
2Countries
60.5 MWOperational (21 sites)
6 MWUnder construction (1 site)
11.5 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 20 of 24 facilities have a stated capacity; the others are counted as sites only.

FRA01 · NorthC · Frankfurt am Main (approximate location)Frankfurt 2 · NorthC · Neu-Isenburg (approximate location)Frankfurt 3 · NorthC · Frankfurt am Main (approximate location)Berlin 1 · NorthC · Berlin (approximate location)Berlin 2 · NorthC · Berlin (approximate location)Düsseldorf · NorthC · Düsseldorf (approximate location)Hamburg · NorthC · Hamburg (approximate location)Munich 1 · NorthC · Munich (approximate location)Munich 2 · NorthC · Munich (approximate location)Nuremberg · NorthC · Nuremberg (approximate location)NorthC Aalsmeer · NorthC · Aalsmeer (approximate location)NorthC Almere · NorthC · Almere Stad (approximate location)NorthC Amsterdam 1 · NorthC · Amsterdam (approximate location)NorthC Amsterdam 2 · NorthC · Amsterdam (approximate location)NorthC Delft · NorthC · Delft (approximate location)NorthC Rotterdam Waalhaven · NorthC · Rotterdam (approximate location)NorthC Rotterdam Zestienhoven 1 · NorthC · Rotterdam (approximate location)NorthC Rotterdam Zestienhoven 2 · NorthC · Rotterdam (approximate location)NorthC Eindhoven 1 · NorthC · Eindhoven (approximate location)NorthC Eindhoven 2 · NorthC · Eindhoven (approximate location)NorthC Groningen 1 · NorthC · Groningen (approximate location)NorthC Groningen 2 · NorthC · Groningen (approximate location)NorthC Nieuwegein · NorthC · Nieuwegein (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

NorthC data centers: key facts

About NorthC

NorthC provides colocation and connectivity services in the Netherlands, Germany and Switzerland. It was formed in 2020 when The Datacenter Group and NLDC joined forces, and its website lists 25 data center locations.

Headquarters
Amsterdam, Netherlands
Ownership
Owned by Antin Infrastructure Partners
Tracked footprint
24 facilities in 2 countries
Website
northcdatacenters.com

Company details checked against company and official sources, 7 Oct 2026.

  • Capacity under construction or planned (17.5 MW) is 0.3 times the operational base of 60.5 MW.
  • Its largest operational site is NorthC Aalsmeer in Aalsmeer, Netherlands at 14 MW.
  • The largest project in the pipeline is Berlin 1 by NorthC (7 MW, planned).
  • Netherlands accounts for 60% of tracked capacity (14 facilities).
  • 20 of 24 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational60.5 MW
Under construction6 MW
Planned11.5 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Germany30.9 MW

OperationalUnder construction or planned

NorthC development pipeline

Under construction and planned facilities with a stated capacity, largest first. 6 MW under construction and 11.5 MW planned in total.

ProjectLocationStatusTypeCapacity
Berlin 1NorthC Berlin, Germany Planned Colocation 7 MW
FRA01NorthC Frankfurt am Main, Germany Under construction Colocation 6 MW
Frankfurt 2NorthC Neu-Isenburg, Germany Planned Colocation 4.5 MW

Facilities

24 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
NorthC AalsmeerColocation Aalsmeer, Netherlands Operational 14 MW total — Operator / official
NorthC AlmereColocation Almere Stad, Netherlands Operational 11 MW total — Operator / official
Berlin 1Colocation Berlin, Germany Planned 7 MW total — Operator / official
FRA01Colocation Frankfurt am Main, Germany Under construction 6 MW total — Trade press
NurembergColocation Nuremberg, Germany Operational 6 MW total — Operator / official
NorthC Oude MeerColocation
1 deal
Oude Meer, Netherlands Operational 4.8 MW total — Operator / official
Frankfurt 2Colocation Neu-Isenburg, Germany Planned 4.5 MW total — Trade press
NorthC Eindhoven 2Colocation Eindhoven, Netherlands Operational 4.5 MW total — Operator / official
NorthC Amsterdam 2Colocation Amsterdam, Netherlands Operational 3.4 MW total — Operator / official
NorthC NieuwegeinColocation Nieuwegein, Netherlands Operational 2.5 MW total — Operator / official
NorthC Amsterdam 1Colocation Amsterdam, Netherlands Operational 2.4 MW total — Operator / official
NorthC Eindhoven 1Colocation Eindhoven, Netherlands Operational 2.4 MW total — Operator / official
Munich 1Colocation Munich, Germany Operational 2 MW total — Operator / official
NorthC DelftColocation Delft, Netherlands Operational 1.5 MW total — Operator / official
DüsseldorfColocation Düsseldorf, Germany Operational 1.3 MW total — Operator / official
HamburgColocation Hamburg, Germany Operational 1.2 MW total — Operator / official
Munich 2Colocation Munich, Germany Operational 1.2 MW total — Operator / official
Berlin 2Colocation Berlin, Germany Operational 0.9 MW total — Operator / official
Frankfurt 3Colocation Frankfurt am Main, Germany Operational 0.9 MW total — Trade press
NorthC Rotterdam WaalhavenColocation Rotterdam, Netherlands Operational 0.5 MW total — Operator / official
NorthC Groningen 1Colocation Groningen, Netherlands Operational — — Operator / official
NorthC Groningen 2Colocation Groningen, Netherlands Operational — — Operator / official
NorthC Rotterdam Zestienhoven 1Colocation Rotterdam, Netherlands Operational — — Operator / official
NorthC Rotterdam Zestienhoven 2Colocation Rotterdam, Netherlands Operational — — Operator / official

Market position

How NorthC compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Netherlands, NorthC ranks #1 of 30 tracked operators by capacity, with 53% of the country’s tracked MW.
  • Netherlands has 99 tracked data centers from 30 operators: 79.1 MW operational and 10 MW under construction or planned.
  • Industrial electricity in Netherlands costs 148 USD/MWh (2025, latest official figure).
  • In Germany, NorthC ranks #20 of 50 tracked operators by capacity, with 0.7% of the country’s tracked MW.
  • Rotterdam also hosts 2 other tracked data center(s), run by Eurofiber Cloud Infra and Smartdc.
  • Our Deal Tracker lists 1 deal(s) naming NorthC, the latest on 23 July 2026.

Data center operators in Netherlands

Tracked facilities9930 operators
Operational capacity79.1 MW10 MW in the pipeline
NorthC rank by capacity#1of 30 operators · 53%
Industrial power price148 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA120.7 MW—
Iron Mountain2—10 MW
maincubes15 MW—
QTS44.8 MW—
Penta Infra41.6 MW—
Equinix12——
Digital Realty12——
Eurofiber Cloud Infra8——

All data centers in Netherlands Power and policy in Netherlands

Data center operators in Germany

Tracked facilities17050 operators
Operational capacity819 MW3,782 MW in the pipeline
NorthC rank by capacity#20of 50 operators · 0.7%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW578 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW
CyrusOne760 MW192 MW

All data centers in Germany Power and policy in Germany

Other data centers in Rotterdam

Deals naming NorthC

  • NovoServe → NorthC Oude Meer and Maincubes Schiphol Rijk Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does NorthC operate?

DC Market Insights tracks 24 NorthC data center(s) in 2 countries as of October 2026: 21 operational, 1 under construction and 2 planned.

Where is NorthC headquartered?

NorthC is headquartered in Amsterdam, Netherlands. Ownership: Owned by Antin Infrastructure Partners.

Which other companies operate data centers in Netherlands?

Besides NorthC, the largest operators we track in Netherlands by capacity are NTT DATA, Iron Mountain, maincubes, QTS and Penta Infra. The Netherlands page lists all 30 operators.

What rules apply to data centers in Netherlands?

Our Power & Policy Tracker lists 12 government actions on data centers and power in Netherlands, including 4 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Rotterdam?

Other tracked data centers in Rotterdam include Datacenter Rotterdam 2 (Eurofiber Cloud Infra) and Smartdc Rotterdam (Smartdc).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst