Proprietary data

Data Centers in France

Every data center in France that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 13 October 2026, DC Market Insights tracks 1 data centers in France run by 1 operators: 1 operational, 0 under construction and 0 planned. Stated operational capacity is 4.5 MW. CyrusOne holds the largest share of tracked operational capacity (100%).

1Facilities tracked
1Operators
4.5 MWOperational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

CyrusOne PAR1 Paris · CyrusOne · Wissous (approximate location)
Operational Under construction Planned

Market snapshot

France data center market: key facts

  • The largest operational facility we track is CyrusOne PAR1 Paris (CyrusOne, Wissous) at 4.5 MW.

Operators in France

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
CyrusOne14.5 MW—100%

How France compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom18148760 MW7,045 MW
Germany17553845 MW4,463 MW
Russia10017371 MW211 MW
Italy43—209 MW
Netherlands9930133 MW10 MW
Spain2218 MW—
Ireland2214 MW—
Belgium2788.4 MW—
France114.5 MW—
Luxembourg83——
Denmark42——
Finland42——

Data center deals in France

Our Deal Tracker lists 8 deals in France since January 2026, with $8.08B in disclosed value.

  • Azur Datacenter (Arago Technologie group) → HRS headquarters site, Champagnier (Isère), 14,100 sqm, to be converted to a data center Land / campus
  • Morrison → Orange France data centre platform (5 data centres on 4 campuses: Chevilly-Larue, Aubervilliers, Chartres, Val-de-Reuil) JV / partnership $3.42B · 400 MW

All France deals in the Deal Tracker

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CyrusOne PAR1 ParisCyrusOne Wissous Operational 4.5 MW IT — Operator / official

Get the data

Every data center in France, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

All countries

Global Data Center Database: annual licence

2,498 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

$1,499 USD / year

Subscribe

Full database now, a fresh file every month. Renews yearly; cancel anytime in PayPal.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in France

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

Secure checkout

Data pack

Loading secure checkout…

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in France?

DC Market Insights tracks 1 data centers in France as of October 2026: 1 operational, 0 under construction and 0 planned, run by 1 operators. The count grows as we verify more sites.

What is the data center capacity of France?

Tracked operational capacity in France is 4.5 MW, with — under construction and — planned. These totals use the capacity each source states (IT load where given) and cover 1 of 1 tracked facilities.

Which companies operate the most data center capacity in France?

By tracked operational capacity, the largest operators in France are CyrusOne (4.5 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst