In short
As of 16 October 2026, DC Market Insights tracks 1 data center operated by Brookfield in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Brookfield data centers: key facts
- The largest project in the pipeline is Brookfield Strängnäs AI campus (750 MW, planned).
Brookfield development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 750 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Brookfield Strängnäs AI campusBrookfield | Strängnäs, Sweden | Planned | Hyperscale | 750 MW |
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Brookfield Strängnäs AI campusHyperscale | Strängnäs, Sweden | Planned | 750 MW total | — | Trade press |
Market position
How Brookfield compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Sweden, Brookfield ranks #1 of 15 tracked operators by capacity, with 45% of the country’s tracked MW.
- Sweden has 36 tracked data centers from 15 operators: 171 MW operational and 1,498 MW under construction or planned.
- Industrial electricity in Sweden costs 78.5 USD/MWh (2025, latest official figure).
- Our Deal Tracker lists 3 deal(s) naming Brookfield, the latest on 14 September 2026.
Data center operators in Sweden
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EcoDataCenter | 3 | 80 MW | 400 MW |
| atNorth | 3 | 12 MW | 330 MW |
| Conapto | 4 | 39 MW | — |
| Hydro66 | 1 | 19.2 MW | — |
| STACK Infrastructure | 1 | 18 MW | — |
| evroc | 1 | — | 18 MW |
| Glesys | 1 | 3.2 MW | — |
| Bahnhof | 6 | — | — |
All data centers in Sweden Power and policy in Sweden
Deals naming Brookfield
- Brookfield (affiliates) → American Real Estate Partners (AREP) – data center development platform (PowerHouse Data Centers) M&A
- Brookfield (campus developer); NextEra Energy (power); Big Rivers Electric, Jackson Purchase Energy Cooperative, Paducah Power System → AI data center campus at DOE Paducah Site, Western Kentucky Land / campus $100.00B
- Brookfield (up to US$9bn), NVIDIA (US$1bn), NAVER → GAK Sejong AI data centre expansion (55MW to 200MW) JV / partnership $10.00B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Brookfield operate?
DC Market Insights tracks 1 Brookfield data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.
Which other companies operate data centers in Sweden?
Besides Brookfield, the largest operators we track in Sweden by capacity are EcoDataCenter, atNorth, Conapto, Hydro66 and STACK Infrastructure. The Sweden page lists all 15 operators.
What rules apply to data centers in Sweden?
Our Power & Policy Tracker lists 7 government actions on data centers and power in Sweden, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.