Proprietary data

EcoDataCenter Data Centers

Data centers operated by EcoDataCenter that we have verified: location, status and capacity, each checked against its source.

In short

As of 16 October 2026, DC Market Insights tracks 3 data centers operated by EcoDataCenter in 1 country, of which 1 are operational. Stated operational capacity is 80 MW, with a further 250 MW under construction and 150 MW planned. The pipeline is 5.0 times the capacity already operating.

3Facilities tracked
1Countries
80 MWOperational (1 site)
250 MWUnder construction (1 site)
150 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 3 facilities have a stated capacity; the others are counted as sites only.

EcoDataCenter 1 Falun · EcoDataCenter · Falun (approximate location)EcoDataCenter 2 Borlänge · EcoDataCenter · Borlänge (approximate location)EcoDataCenter Smedjebacken (Röbacken) · EcoDataCenter · Smedjebacken (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

EcoDataCenter data centers: key facts

  • Capacity under construction or planned (400 MW) is 5.0 times the operational base of 80 MW.
  • Its largest operational site is EcoDataCenter 1 Falun in Falun, Sweden at 80 MW.
  • The largest project in the pipeline is EcoDataCenter 2 Borlänge (250 MW, under construction).
  • By type, the tracker lists 2 hyperscale and 1 colocation facilities.
Capacity by status, MW
Operational80 MW
Under construction250 MW
Planned150 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Hyperscale2
Colocation1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

EcoDataCenter development pipeline

Under construction and planned facilities with a stated capacity, largest first. 250 MW under construction and 150 MW planned in total.

ProjectLocationStatusTypeCapacity
EcoDataCenter 2 BorlängeEcoDataCenter Borlänge, Sweden Under construction Hyperscale 250 MW
EcoDataCenter Smedjebacken (Röbacken)EcoDataCenter Smedjebacken, Sweden Planned Hyperscale 150 MW

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
EcoDataCenter 2 BorlängeHyperscale Borlänge, Sweden Under construction 250 MW total — Trade press
EcoDataCenter Smedjebacken (Röbacken)Hyperscale Smedjebacken, Sweden Planned 150 MW total — Operator / official
EcoDataCenter 1 FalunColocation Falun, Sweden Operational 80 MW total — Operator / official

Market position

How EcoDataCenter compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Sweden, EcoDataCenter ranks #2 of 15 tracked operators by capacity, with 29% of the country’s tracked MW.
  • Sweden has 36 tracked data centers from 15 operators: 171 MW operational and 1,498 MW under construction or planned.
  • Industrial electricity in Sweden costs 78.5 USD/MWh (2025, latest official figure).
  • Our Deal Tracker lists 1 deal(s) naming EcoDataCenter, the latest on 26 August 2026.

Data center operators in Sweden

Tracked facilities3615 operators
Operational capacity171 MW1,498 MW in the pipeline
EcoDataCenter rank by capacity#2of 15 operators · 29%
Industrial power price78.5 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Brookfield1—750 MW
atNorth312 MW330 MW
Conapto439 MW—
Hydro66119.2 MW—
STACK Infrastructure118 MW—
evroc1—18 MW
Glesys13.2 MW—
Bahnhof6——

All data centers in Sweden Power and policy in Sweden

Deals naming EcoDataCenter

  • EcoDataCenter → 52-hectare site for third Dalarna campus, Smedjebacken Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does EcoDataCenter operate?

DC Market Insights tracks 3 EcoDataCenter data center(s) in 1 country as of October 2026: 1 operational, 1 under construction and 1 planned.

Which other companies operate data centers in Sweden?

Besides EcoDataCenter, the largest operators we track in Sweden by capacity are Brookfield, atNorth, Conapto, Hydro66 and STACK Infrastructure. The Sweden page lists all 15 operators.

What rules apply to data centers in Sweden?

Our Power & Policy Tracker lists 7 government actions on data centers and power in Sweden, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst