Proprietary data

Rackspace Data Centers

Data centers operated by Rackspace that we have verified: location, status and capacity, each checked against its source.

In short

As of 10 October 2026, DC Market Insights tracks 1 data center operated by Rackspace in 1 country (1 operational). Stated operational capacity is 56 MW.

1Facilities tracked
1Countries
56 MWOperational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Rackspace Chicago ORD1 · Rackspace · Elk Grove Village (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Rackspace data centers: key facts

  • Its largest operational site is Rackspace Chicago ORD1 in Elk Grove Village, United States at 56 MW.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Rackspace Chicago ORD1Enterprise Elk Grove Village, United States Operational 56 MW total — Operator / official

Market position

How Rackspace compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Rackspace ranks #39 of 166 tracked operators by capacity, with 0.1% of the country’s tracked MW.
  • United States has 1,189 tracked data centers from 166 operators: 9,259 MW operational and 33,763 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Elk Grove Village also hosts 10 other tracked data center(s), run by Prime Data Centers, Stream Data Centers, T5 Data Centers and Centersquare.

Data center operators in United States

Tracked facilities1,189166 operators
Operational capacity9,259 MW33,763 MW in the pipeline
Rackspace rank by capacity#39of 166 operators · 0.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
PowerHouse Data Centers1760 MW8,807 MW
Meta301,000 MW7,000 MW
Tract15—4,800 MW
QTS471,977 MW283 MW
Microsoft48—2,000 MW
Vantage Data Centers22135 MW1,734 MW
CyrusOne371,048 MW200 MW
Crusoe11,200 MW—

All data centers in United States Power and policy in United States

Other data centers in Elk Grove Village

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Rackspace operate?

DC Market Insights tracks 1 Rackspace data center(s) in 1 country as of October 2026: 1 operational, 0 under construction and 0 planned.

Which other companies operate data centers in United States?

Besides Rackspace, the largest operators we track in United States by capacity are PowerHouse Data Centers, Meta, Tract, QTS and Microsoft. The United States page lists all 166 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Elk Grove Village?

Other tracked data centers in Elk Grove Village include Prime ORD01-01 (Prime Data Centers), Prime ORD01-02 (Prime Data Centers), Prime ORD01-03 (Prime Data Centers) and Stream Chicago III (ORDC) Building 1 (Stream Data Centers).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst