In short

As of 10 October 2026, DC Market Insights tracks 1 data center operated by Red Wolf DCD Properties in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
—Planned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 1 facilities have a stated capacity; the others are counted as sites only.

Red Wolf Kansas City Kansas hyperscale campus · Red Wolf DCD Properties · Kansas City (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Red Wolf DCD Properties data centers: key facts

  • 0 of 1 facilities have a capacity stated by their source; the totals above count only those.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Red Wolf Kansas City Kansas hyperscale campusHyperscale Kansas City, United States Planned — — Trade press

Market position

How Red Wolf DCD Properties compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Red Wolf DCD Properties is one of 166 operators we track.
  • United States has 1,184 tracked data centers from 166 operators: 9,093 MW operational and 33,676 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Kansas City also hosts 7 other tracked data center(s), run by Edged, Google, Lightedge and Meta.

Data center operators in United States

Tracked facilities1,184166 operators
Operational capacity9,093 MW33,676 MW in the pipeline
Red Wolf DCD Properties rank by capacity#101of 166 operators
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
PowerHouse Data Centers1760 MW8,807 MW
Meta301,000 MW7,000 MW
Tract15—4,800 MW
QTS471,977 MW283 MW
Microsoft48—2,000 MW
Vantage Data Centers22135 MW1,734 MW
CyrusOne371,048 MW200 MW
Crusoe11,200 MW—

All data centers in United States Power and policy in United States

Other data centers in Kansas City

  • Edged Kansas City · Edged · Operational · 26 MW
  • Google Kansas City – Hunt Midwest Business Center · Google · Planned
  • Google Kansas City – Rocky Branch Creek Technology Park · Google · Planned
  • Lightedge Kansas City Data Center · Lightedge · Operational
  • Meta Kansas City Data Center · Meta · Operational
  • Netrality 1102 Grand · Netrality · Operational
  • Project Kestrel (KCI 29 Logistics Park) · Shenandoah Computing · Planned

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Red Wolf DCD Properties operate?

DC Market Insights tracks 1 Red Wolf DCD Properties data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in United States?

Besides Red Wolf DCD Properties, the largest operators we track in United States by capacity are PowerHouse Data Centers, Meta, Tract, QTS and Microsoft. The United States page lists all 166 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Kansas City?

Other tracked data centers in Kansas City include Edged Kansas City (Edged), Google Kansas City – Hunt Midwest Business Center (Google), Google Kansas City – Rocky Branch Creek Technology Park (Google) and Lightedge Kansas City Data Center (Lightedge).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst