Proprietary data

Data Centers in United States

Every data center in United States that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 8 October 2026, DC Market Insights tracks 553 data centers in United States run by 89 operators: 336 operational, 74 under construction and 143 planned. Stated operational capacity is 2,506 MW, with a further 1,931 MW under construction and 3,460 MW planned. CyrusOne holds the largest share of tracked operational capacity (30%).

553Facilities tracked
89Operators
2,506 MWOperational (336 sites)
1,931 MWUnder construction (74 sites)
3,460 MWPlanned (143 sites)

MW = IT capacity where the source states it, otherwise total capacity. 157 of 553 facilities have a stated capacity; the others are counted as sites only.

Equinix DC1 Ashburn · Equinix · Ashburn (approximate location)Equinix DC2 Ashburn · Equinix · Ashburn (approximate location)Equinix DC3 Ashburn · Equinix · Ashburn (approximate location)Equinix DC4 Ashburn · Equinix · Ashburn (approximate location)Equinix DC5 Ashburn · Equinix · Ashburn (approximate location)Equinix DC6 Ashburn · Equinix · Ashburn (approximate location)Equinix DC10 Ashburn · Equinix · Ashburn (approximate location)Equinix DC11 Ashburn · Equinix · Ashburn (approximate location)Equinix DC12 Ashburn · Equinix · Ashburn (approximate location)Equinix DC13 Ashburn · Equinix · Ashburn (approximate location)Equinix DC14 Manassas · Equinix · Manassas (approximate location)Equinix DC21 Ashburn · Equinix · Ashburn (approximate location)CoreSite VA1 Reston · CoreSite · Reston (approximate location)CoreSite VA2 Reston · CoreSite · Reston (approximate location)CoreSite VA3 Reston · CoreSite · Reston (approximate location)CoreSite NY1 New York · CoreSite · New York City (approximate location)CoreSite NY2 Secaucus · CoreSite · Secaucus (approximate location)CoreSite NY3 Secaucus · CoreSite · Secaucus (approximate location)Digital Realty ACC4 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty ACC5 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty ACC6 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty ACC7 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD12 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD14 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD24 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD35 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD36 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD37 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD38 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD39 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD40 Ashburn · Digital Realty · Ashburn (approximate location)Digital Realty IAD44 Sterling · Digital Realty · Sterling (approximate location)Digital Realty VA3 Reston · Digital Realty · Reston (approximate location)Digital Realty EWR11 Piscataway · Digital Realty · Piscataway (approximate location)Digital Realty EWR12 Piscataway · Digital Realty · Piscataway (approximate location)Digital Realty EWR20 Clifton · Digital Realty · Clifton (approximate location)Digital Realty EWR21 Clifton · Digital Realty · Clifton (approximate location)Digital Realty JFK10 Manhattan · Digital Realty · New York City (approximate location)Digital Realty JFK12 Manhattan · Digital Realty · New York City (approximate location)Digital Realty JFK13 Manhattan · Digital Realty · New York City (approximate location)Centersquare Sterling IAD1 · Centersquare · Sterling (approximate location)Centersquare Sterling IAD2 · Centersquare · Sterling (approximate location)Centersquare Ashburn IAD4 · Centersquare · Ashburn (approximate location)Centersquare Weehawken EWR2 · Centersquare · Weehawken (approximate location)Centersquare Piscataway EWR3 · Centersquare · Piscataway (approximate location)Centersquare Secaucus EWR5 · Centersquare · Secaucus (approximate location)Cologix ASH1 Ashburn · Cologix · Ashburn (approximate location)Cologix ASH2 Ashburn · Cologix · Ashburn (approximate location)Cologix NNJ2 Cedar Knolls · Cologix · Cedar Knolls (approximate location)Cologix NNJ3 Parsippany · Cologix · Parsippany (approximate location)Cologix NNJ4 Cedar Knolls · Cologix · Cedar Knolls (approximate location)Hudson Interxchange 60 Hudson Street · Hudson Interxchange · New York City (approximate location)Telehouse New York Chelsea · Telehouse America · New York City (approximate location)Telehouse New York Teleport · Telehouse America · Staten Island (approximate location)Sabey Intergate.Manhattan · Sabey Data Centers · New York City (approximate location)365 Data Centers Herndon · 365 Data Centers · Herndon (approximate location)365 Data Centers Bridgewater · 365 Data Centers · Bridgewater (approximate location)365 Data Centers Carlstadt · 365 Data Centers · Carlstadt (approximate location)365 Data Centers Commack · 365 Data Centers · Commack (approximate location)365 Data Centers Philadelphia University City · 365 Data Centers · Philadelphia (approximate location)365 Data Centers Philadelphia Downtown · 365 Data Centers · Philadelphia (approximate location)H5 Ashburn · H5 Data Centers · Ashburn (approximate location)H5 Herndon · H5 Data Centers · Herndon (approximate location)H5 Virginia Data Center Campus Chantilly · H5 Data Centers · Chantilly (approximate location)H5 New York 325 Hudson Street · H5 Data Centers · New York City (approximate location)H5 New Jersey Secaucus · H5 Data Centers · Secaucus (approximate location)H5 Philadelphia · H5 Data Centers · Philadelphia (approximate location)H5 Pittsburgh · H5 Data Centers · Pittsburgh (approximate location)H5 Buffalo I · H5 Data Centers · Lockport (approximate location)H5 Buffalo II · H5 Data Centers · Lockport (approximate location)H5 Buffalo III · H5 Data Centers · Buffalo (approximate location)QTS Ashburn 1 DC1 · QTS · Sterling (approximate location)QTS Ashburn 1 DC2 · QTS · Sterling (approximate location)QTS Ashburn 2 · QTS · Sterling (approximate location)QTS Ashburn 3 · QTS · Ashburn (approximate location)QTS Ashburn-Moran · QTS · Sterling (approximate location)QTS Manassas 1 · QTS · Manassas (approximate location)QTS Richmond 1 · QTS · Sandston (approximate location)CyrusOne Sterling NVA1-NVA3 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA4 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA5-NVA7 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA8 · CyrusOne · Sterling (approximate location)CyrusOne Sterling NVA9 · CyrusOne · Sterling (approximate location)CyrusOne Somerset NYM1 · CyrusOne · Somerset (approximate location)CyrusOne Totowa NYM2 · CyrusOne · Totowa (approximate location)CyrusOne Wappingers Falls NYM7 · CyrusOne · Wappingers Falls (approximate location)Vantage VA11 (Ashburn VA1 campus) · Vantage Data Centers · Sterling (approximate location)Vantage VA12 (Ashburn VA1 campus) · Vantage Data Centers · Sterling (approximate location)Vantage Ashburn II (VA2) campus · Vantage Data Centers · Sterling (approximate location)Vantage Ashburn III (VA3) campus · Vantage Data Centers · Ashburn (approximate location)Vantage Fredericksburg (VA4) campus · Vantage Data Centers · Fredericksburg (approximate location)NTT DATA Ashburn VA1 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA2 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA3 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA4 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA5 · NTT DATA · Ashburn (approximate location)NTT DATA Ashburn VA7 · NTT DATA · Ashburn (approximate location)STACK NVA01 Sterling (NVA01A) · STACK Infrastructure · Sterling (approximate location)STACK NVA05 Manassas · STACK Infrastructure · Manassas (approximate location)Aligned IAD-01 · Aligned Data Centers · Ashburn (approximate location)Aligned IAD-02 · Aligned Data Centers · Ashburn (approximate location)Aligned IAD-03 · Aligned Data Centers · Sterling (approximate location)Aligned IAD-04 (Quantum Frederick Building 1) · Aligned Data Centers · Frederick (approximate location)Aligned IAD-06 (Quantum Frederick) · Aligned Data Centers · Frederick (approximate location)CloudHQ LC3 (LC Campus) · CloudHQ · AshburnCloudHQ LC4 (LC Campus) · CloudHQ · AshburnCloudHQ MCC5 (MCC Campus) · CloudHQCloudHQ MCC7 (MCC Campus) · CloudHQCloudHQ MDC Campus · CloudHQSabey SDC Ashburn Building A · Sabey Data Centers · Ashburn (approximate location)Sabey SDC Ashburn Building B · Sabey Data Centers · Ashburn (approximate location)Sabey SDC Ashburn Building C · Sabey Data Centers · Ashburn (approximate location)EdgeCore Culpeper Campus (Culpeper Technology Zone) · EdgeCore Digital Infrastructure · Culpeper (approximate location)EdgeCore Ashburn Campus (Maries Road and Moran Road) · EdgeCore Digital Infrastructure · Sterling (approximate location)PowerHouse ABX-1 · PowerHouse Data Centers · AshburnPowerHouse Pacific · PowerHouse Data Centers · AshburnPowerHouse Arcola · PowerHouse Data Centers · ArcolaPowerHouse PAX-1 · PowerHouse Data Centers · Carlisle (approximate location)Iron Mountain Northern Virginia Campus (Manassas) · Iron Mountain · Manassas (approximate location)Iron Mountain NJE-1 (Edison) · Iron Mountain · Edison (approximate location)Corscale Gainesville Crossing Building 3 · Corscale · Gainesville (approximate location)Warrenton data center (Blackwell Road) · Amazon Web Services · Warrenton (approximate location)Microsoft Boydton campus · Microsoft · Boydton (approximate location)AVC17 Lakeside · Microsoft · Clarksville (approximate location)Microsoft Tunstall Road site · Microsoft · South Hill (approximate location)CoreWeave Kenilworth (NEST campus, 11 Nest Drive) · CoreWeave · Kenilworth (approximate location)CoreWeave Lancaster data center · CoreWeave · Lancaster (approximate location)Nebius New Jersey data center (Vineland) · Nebius · Vineland (approximate location)Rowan Frederick Data Center (Bauxite) · Rowan Digital Infrastructure · Adamstown (approximate location)Rowan Quantum Frederick Project II · Rowan Digital Infrastructure · Adamstown (approximate location)Rowan Quantum Frederick Project III · Rowan Digital Infrastructure · Adamstown (approximate location)Devlin Technology Park · Amazon Web Services · Bristow (approximate location)Bristow Campus · Amazon Web Services · Bristow (approximate location)AWS Dean Drive data center complex · Amazon Web Services · Manassas (approximate location)MNZ07 Wellington Data Center · Microsoft · Gainesville (approximate location)Allentown – TekPark Data Center · TierPoint · Breinigsville (approximate location)Bethlehem Data Center (BET) · TierPoint · Bethlehem (approximate location)Lehigh Valley Data Center (LVQ) · TierPoint · Bethlehem (approximate location)PIT2 Summit Park Data Center · DataBank · Pittsburgh (approximate location)PIT1 Downtown Pittsburgh Data Center · DataBank · Pittsburgh (approximate location)PHL1 Downtown Philadelphia Data Center · DataBank · Philadelphia (approximate location)EWR1 Downtown Newark Data Center · DataBank · Newark (approximate location)EWR2 Piscataway Data Center · DataBank · Piscataway (approximate location)IAD1 Ashburn Campus Data Center · DataBank · Ashburn (approximate location)IAD2 McLean Data Center · DataBank · McLean (approximate location)IAD3 Ashburn Campus Data Center · DataBank · Ashburn (approximate location)IAD4 Ashburn Campus Data Center · DataBank · Ashburn (approximate location)IAD5 Culpeper Campus Data Center · DataBank · Culpeper (approximate location)IAD6 Culpeper Campus Data Center · DataBank · Culpeper (approximate location)LGA3 Orangeburg Data Center · DataBank · Orangeburg (approximate location)LGA4 Orangeburg Data Center · DataBank · Orangeburg (approximate location)LGA1 Downtown New York City Data Center · DataBank · New York City (approximate location)LGA2 Downtown New York City Data Center · DataBank · New York City (approximate location)New York – Hawthorne Data Center (HWT) · TierPoint · Hawthorne (approximate location)New York – Hawthorne Data Center (HW2) · TierPoint · Hawthorne (approximate location)Expedient PIT1 · Expedient · Pittsburgh (approximate location)Expedient PIT2 · Expedient · Pittsburgh (approximate location)Expedient Baltimore Data Center (BWI1) · Expedient · Owings Mills (approximate location)Orangeburg NY | ORNY1 · 1547 Critical Systems Realty · Orangeburg (approximate location)New Jersey Data Center (EWR1) · Evocative · Secaucus (approximate location)Vienna Office & Data Center · Cogent · Vienna (approximate location)Richmond Data Center · Cogent · Richmond (approximate location)Washington DC 2 Data Center · Cogent · Washington (approximate location)Pittsburgh Data Center · Cogent · Pittsburgh (approximate location)Sparta Data Center · Cogent · Sparta (approximate location)Newark Data Center (Franklin) · Cogent · Franklin (approximate location)New York Data Center · Cogent · New York City (approximate location)Hackensack Data Center · Cogent · Hackensack (approximate location)Pennsauken Data Center · Cogent · Pennsauken (approximate location)Buffalo Data Center · Cogent · Buffalo (approximate location)Syracuse Data Center · Cogent · Syracuse (approximate location)University at Albany IT Building and Data Center · University at Albany · Albany (approximate location)ITS Albany Data Center · New York State Office of Information Technology Services · Albany (approximate location)DQE Pittsburgh Facility · DQE Communications · Pittsburgh (approximate location)DQE Butler Facility · DQE Communications · Butler (approximate location)Homer City Energy Campus · Homer City Redevelopment · Homer City (approximate location)Philadelphia – Collegeville Data Center · Flexential · Collegeville (approximate location)Richmond Data Center · Flexential · Richmond (approximate location)Valley Forge Data Center (VFO) · TierPoint · Norristown (approximate location)Philadelphia Data Center (PHI) · TierPoint · Philadelphia (approximate location)Baltimore Data Center (BAL) · TierPoint · Baltimore (approximate location)CTP-01 · Chirisa Technology Parks · Richmond (approximate location)CTP-02 & CTP-03 · Chirisa Technology Parks · Richmond (approximate location)CTP-04/05/06 · Chirisa Technology Parks · Richmond (approximate location)Equinix NY1 Newark · Equinix · Newark (approximate location)Equinix NY2 Secaucus · Equinix · Secaucus (approximate location)Equinix NY3 Secaucus · Equinix · Secaucus (approximate location)Equinix NY4 Secaucus · Equinix · Secaucus (approximate location)Equinix NY5 Secaucus · Equinix · Secaucus (approximate location)Equinix NY6 Secaucus · Equinix · Secaucus (approximate location)Equinix NY7 North Bergen · Equinix · North Bergen (approximate location)Equinix NY9 Manhattan · Equinix · New York City (approximate location)Equinix NY11 Carteret · Equinix · Carteret (approximate location)Equinix NY13 Elmsford · Equinix · Elmsford (approximate location)Equinix DC15 Ashburn · Equinix · Ashburn (approximate location)Equinix DC16 Ashburn · Equinix · Ashburn (approximate location)Equinix DC22 Ashburn · Equinix · Ashburn (approximate location)Equinix PH1 Philadelphia · Equinix · Philadelphia (approximate location)Digital Realty Digital Dulles Campus Sterling · Digital Realty · Sterling (approximate location)Digital Realty Manassas hyperscale buildings (2 x 96MW) · Digital Realty · Manassas (approximate location)QTS Richmond 2 · QTS · Sandston (approximate location)QTS Richmond 3 · QTS · Sandston (approximate location)QTS Piscataway 1 · QTS · Piscataway (approximate location)NTT DATA Ashburn VA6 · NTT DATA · Ashburn (approximate location)NTT DATA Gainesville VA11 · NTT DATA · Gainesville (approximate location)Iron Mountain VA-1 (Manassas) · Iron Mountain · Manassas (approximate location)Iron Mountain VA-2 (Manassas) · Iron Mountain · Manassas (approximate location)Iron Mountain VA-6 (Manassas) · Iron Mountain · Manassas (approximate location)EdgeConneX RIC01 Richmond · EdgeConneX · Richmond (approximate location)EdgeConneX PIT01 Pittsburgh · EdgeConneX · Pittsburgh (approximate location)EdgeConneX NOR01 Norfolk · EdgeConneX · Norfolk (approximate location)Menlo Digital MD-DC1 Herndon · Menlo Digital · Herndon (approximate location)Menlo Digital MD-VA2 Sterling · Menlo Digital · Sterling (approximate location)Menlo Digital MD-VA3 Richmond · Menlo Digital · Richmond (approximate location)AWS BWI-150 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-151 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-152 Frederick · Amazon Web Services · Frederick (approximate location)AWS BWI-153 Frederick · Amazon Web Services · Frederick (approximate location)CloudHQ LC1A (LC Campus) · CloudHQ · Ashburn (approximate location)CloudHQ LC2 (LC Campus) · CloudHQ · Ashburn (approximate location)Archbald Project Gravity data center campus · Archbald 25 Developer LLC · Archbald (approximate location)TPC Data Centers Konterra 1 Laurel · TPC Data Centers · Laurel (approximate location)Netrality Philadelphia 401 North Broad · Netrality · Philadelphia (approximate location)11:11 Systems Carlstadt, New Jersey Data Center · 11:11 Systems · Carlstadt (approximate location)CoreSite DC1 Washington · CoreSite · Washington (approximate location)CoreSite DC2 Washington · CoreSite · Washington (approximate location)Equinix DA1 Dallas · Equinix · Dallas (approximate location)Equinix DA2 Dallas · Equinix · Dallas (approximate location)Equinix DA3 Dallas · Equinix · Dallas (approximate location)Equinix DA4 Dallas · Equinix · Dallas (approximate location)Equinix DA6 Dallas · Equinix · Dallas (approximate location)Equinix DA7 Dallas · Equinix · Plano (approximate location)Equinix DA9 Dallas · Equinix · Irving (approximate location)Equinix DA11 Dallas · Equinix · Dallas (approximate location)Equinix HO1 Houston · Equinix · Houston (approximate location)Digital Realty DFW10 Dallas · Digital Realty · Dallas (approximate location)Digital Realty DFW11 Dallas · Digital Realty · Carrollton (approximate location)Digital Realty DFW12 Dallas · Digital Realty · Carrollton (approximate location)Digital Realty DFW16 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW17 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW18 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW25 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW26 Dallas · Digital Realty · Lewisville (approximate location)Digital Realty DFW28 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW29 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW35 Dallas · Digital Realty · Richardson (approximate location)Digital Realty DFW36 Dallas · Digital Realty · Dallas (approximate location)Digital Realty IAH10 Houston · Digital Realty · Houston (approximate location)Digital Realty AUS11 Austin · Digital Realty · Austin (approximate location)CyrusOne DFW1 Carrollton · CyrusOne · Carrollton (approximate location)CyrusOne DFW2 Lewisville · CyrusOne · Lewisville (approximate location)CyrusOne DFW3-DFW4 Allen · CyrusOne · Allen (approximate location)CyrusOne DFW5 Allen · CyrusOne · Allen (approximate location)CyrusOne AUS2-AUS3 Austin · CyrusOne · Austin (approximate location)CyrusOne HOU3-HOU4 Houston · CyrusOne · Houston (approximate location)CyrusOne SAT1 San Antonio · CyrusOne · San Antonio (approximate location)CyrusOne SAT2-SAT4 San Antonio · CyrusOne · San Antonio (approximate location)CyrusOne SAT5-SAT6 San Antonio · CyrusOne · San Antonio (approximate location)QTS Irving 1 · QTS · Irving (approximate location)QTS Fort Worth 1 · QTS · Fort Worth (approximate location)QTS San Antonio 2 · QTS · San Antonio (approximate location)QTS South Dallas · QTS · Wilmer (approximate location)DataBank DFW1 Dallas · DataBank · Dallas (approximate location)DataBank DFW2 Richardson · DataBank · Richardson (approximate location)DataBank DFW3 Plano · DataBank · Plano (approximate location)DataBank DFW4 Dallas · DataBank · Dallas (approximate location)DataBank DFW5 Dallas · DataBank · Dallas (approximate location)DataBank DFW6 Dallas · DataBank · Dallas (approximate location)DataBank DFW7 Dallas · DataBank · Dallas (approximate location)DataBank DFW8 Plano · DataBank · Plano (approximate location)DataBank DFW9 Red Oak · DataBank · Red Oak (approximate location)DataBank DFW10 Red Oak · DataBank · Red Oak (approximate location)DataBank DFW11 Red Oak · DataBank · Red Oak (approximate location)DataBank DFW12 Red Oak · DataBank · Red Oak (approximate location)DataBank HOU1 Houston · DataBank · Houston (approximate location)DataBank HOU2 Houston · DataBank · Houston (approximate location)DataBank HOU3 Houston · DataBank · Houston (approximate location)DataBank HOU5 Houston · DataBank · Houston (approximate location)DataBank AUS1 Austin · DataBank · Austin (approximate location)DataBank ACT1 Waco · DataBank · Waco (approximate location)Flexential Dallas – Downtown Dallas · Flexential · Dallas (approximate location)Flexential Dallas – Plano · Flexential · Plano (approximate location)Flexential Dallas – Richardson · Flexential · Richardson (approximate location)Flexential Dallas-Talty 1 · Flexential · Talty (approximate location)Cologix DAL1 Dallas · Cologix · Dallas (approximate location)Cologix DAL2 Dallas · Cologix · Dallas (approximate location)Cologix DAL3 Dallas · Cologix · Dallas (approximate location)Centersquare DFW1 Fort Worth · Centersquare · Fort Worth (approximate location)Centersquare DFW2 Allen · Centersquare · Allen (approximate location)Centersquare DFW3 Dallas · Centersquare · Dallas (approximate location)TierPoint Dallas · TierPoint · Dallas (approximate location)TierPoint Dallas-Allen · TierPoint · Allen (approximate location)TierPoint Dallas-Fort Worth · TierPoint · Fort Worth (approximate location)NTT DATA Dallas TX1 · NTT DATA · Garland (approximate location)NTT DATA Dallas TX4 · NTT DATA · Garland (approximate location)Switch The Rock · Switch · Round Rock (approximate location)Switch Data Foundry Texas 1 (Data Foundry 01) · Switch · Austin (approximate location)Switch Data Foundry Texas 2 (Data Foundry 02) · Switch · Austin (approximate location)Switch Data Foundry Austin 1 · Switch · Austin (approximate location)Switch Data Foundry Houston 2 · Switch · Houston (approximate location)H5 Data Centers San Antonio · H5 Data Centers · San Antonio (approximate location)Element Critical Houston One · Element Critical · Katy (approximate location)Element Critical Houston Two · Element Critical · Katy (approximate location)Element Critical Austin One · Element Critical · Austin (approximate location)Evocative DAL6 Plano · Evocative · Plano (approximate location)Netrality 1301 Fannin Houston · Netrality · Houston (approximate location)TRG Datacenters HOU1 Spring · TRG Datacenters · Spring (approximate location)TRG Datacenters HOU2 & HOU3 Spring · TRG Datacenters · Spring (approximate location)TRG Datacenters DFW1 Farmers Branch · TRG Datacenters · Farmers Branch (approximate location)Stream DFWC (Wilmer II) · Stream Data Centers · Wilmer (approximate location)Stream DFWB Wilmer · Stream Data Centers · Wilmer (approximate location)Stream DFWA Garland · Stream Data Centers · Garland (approximate location)Stream SATA1 San Antonio II · Stream Data Centers · San Antonio (approximate location)Stream SATB1 San Antonio III · Stream Data Centers · San Antonio (approximate location)Skybox PowerCampus Texas (Wichita Falls) · Skybox Datacenters · Wichita Falls (approximate location)Skybox PowerCampus Austin · Skybox Datacenters · Austin (approximate location)Skybox Austin I · Skybox Datacenters · Austin (approximate location)Skybox PowerCampus Dallas · Skybox Datacenters · Dallas (approximate location)Skybox Houston I · Skybox Datacenters · Houston (approximate location)Aligned DFW-01 Plano · Aligned Data Centers · Plano (approximate location)Aligned DFW-02 Plano · Aligned Data Centers · Plano (approximate location)Aligned DFW-03 Mansfield · Aligned Data Centers · Mansfield (approximate location)Aligned DFW-04 Plano · Aligned Data Centers · Plano (approximate location)Aligned Project Caprock LBB-01 Abernathy · Aligned Data Centers · Abernathy (approximate location)STACK DFW01 Plano · STACK Infrastructure · Plano (approximate location)STACK DFW02 Lancaster · STACK Infrastructure · Lancaster (approximate location)Compass Red Oak Campus · Compass Datacenters · Red Oak (approximate location)Compass DFW Allen · Compass Datacenters · Allen (approximate location)Prime AUS01 Lockhart Campus · Prime Data Centers · Lockhart (approximate location)Prime DFW01-01 Dallas · Prime Data Centers · Dallas (approximate location)Prime DFW01-02 Dallas · Prime Data Centers · Dallas (approximate location)Sabey SDC Austin Building A · Sabey Data Centers · Round Rock (approximate location)Sabey SDC Austin Building B · Sabey Data Centers · Round Rock (approximate location)EdgeConneX HOU-01 Houston · EdgeConneX · Houston (approximate location)Crusoe Abilene Stargate Campus · Crusoe · Abilene (approximate location)Google Armstrong County (Goodnight Campus) · Google · Claude (approximate location)Google Midlothian · Google · Midlothian (approximate location)Google Red Oak · Google · Red Oak (approximate location)Google Pampa · Google · Pampa (approximate location)Meta Fort Worth Data Center · Meta · Fort Worth (approximate location)Meta Temple Data Center · Meta · Temple (approximate location)Meta El Paso Data Center · Meta · El Paso (approximate location)Core Scientific Denton · Core Scientific · Denton (approximate location)Microsoft SAT46 San Antonio · Microsoft · San Antonio (approximate location)Microsoft SAT80/SAT81/SAT82 Castroville · Microsoft · Castroville (approximate location)Microsoft Castroville (2026 filing) · Microsoft · Castroville (approximate location)Microsoft Texas Research Park Campus · Microsoft · San Antonio (approximate location)Microsoft Wiseman Blvd Campus · Microsoft · San Antonio (approximate location)Microsoft SAT16 San Antonio · Microsoft · San Antonio (approximate location)Amazon Web Services Project Eagle Boling · Amazon Web Services · Boling (approximate location)Amazon Web Services Horizon Junction Floydada · Amazon Web Services · Floydada (approximate location)Rowan Project Temple · Rowan Digital Infrastructure · Temple (approximate location)Lincoln Red Oak Campus · Lincoln Property Company · Red Oak (approximate location)Iron Mountain AZP-1 Phoenix · Iron Mountain · Phoenix (approximate location)Iron Mountain AZP-2 Phoenix · Iron Mountain · Phoenix (approximate location)Iron Mountain AZP-3 Phoenix · Iron Mountain · Phoenix (approximate location)Iron Mountain AZS-1 Scottsdale · Iron Mountain · Scottsdale (approximate location)Aligned PHX-01/02/03 Phoenix · Aligned Data Centers · Phoenix (approximate location)Aligned PHX-04 Chandler · Aligned Data Centers · Chandler (approximate location)Aligned PHX-05 Phoenix · Aligned Data Centers · Phoenix (approximate location)Aligned PHX-06 Chandler · Aligned Data Centers · Chandler (approximate location)CyrusOne Chandler PHX1-PHX8 · CyrusOne · Chandler (approximate location)NTT DATA Phoenix PH1 · NTT DATA · Mesa (approximate location)NTT DATA Phoenix PH4 · NTT DATA · Mesa (approximate location)NTT DATA Mesa Pecos & Crismon campus · NTT DATA · Mesa (approximate location)Digital Realty PHX10 Phoenix · Digital Realty · Phoenix (approximate location)Digital Realty PHX15 Chandler · Digital Realty · Chandler (approximate location)EdgeCore Mesa first data center · EdgeCore · Mesa (approximate location)EdgeCore PH02 Mesa · EdgeCore · Mesa (approximate location)EdgeCore PH03 Mesa · EdgeCore · Mesa (approximate location)EdgeCore Mesa expansion parcel · EdgeCore · Mesa (approximate location)Stream PHXA Goodyear · Stream Data Centers · Goodyear (approximate location)Vantage AZ1 Goodyear · Vantage Data Centers · Goodyear (approximate location)STACK PHX01 Avondale · STACK Infrastructure · Avondale (approximate location)STACK PHX02 Central Phoenix · STACK Infrastructure · Phoenix (approximate location)QTS Phoenix 2 DC1 · QTS · Phoenix (approximate location)QTS Phoenix 2 DC5 · QTS · Phoenix (approximate location)Novva Project Borealis Mesa · Novva Data Centers · Mesa (approximate location)EdgeConneX PHX01 Tempe · EdgeConneX · Tempe (approximate location)Flexential Phoenix – Deer Valley · Flexential · Phoenix (approximate location)H5 Phoenix Data Center Chandler · H5 Data Centers · Chandler (approximate location)Centersquare PHX1 Phoenix · Centersquare · Phoenix (approximate location)Centersquare PHX3 Mesa · Centersquare · Mesa (approximate location)Tract Buckeye Technology Park · Tract · Buckeye (approximate location)Microsoft PHX-80 El Mirage · Microsoft · El Mirage (approximate location)Microsoft PHX-81 El Mirage · Microsoft · El Mirage (approximate location)Microsoft PHX-82 El Mirage · Microsoft · El Mirage (approximate location)Microsoft PHX-83 El Mirage · Microsoft · El Mirage (approximate location)Microsoft Goodyear campus · Microsoft · Goodyear (approximate location)Google Mesa data center · Google · Mesa (approximate location)Meta Mesa Data Center · Meta · Mesa (approximate location)Apple Mesa data center · Apple · Mesa (approximate location)AWS Mesa Pecos Road campus · Amazon Web Services · Mesa (approximate location)AWS Mesa Elliot Road campus · Amazon Web Services · Mesa (approximate location)Compass Goodyear campus · Compass Datacenters · Goodyear (approximate location)Meta Los Lunas Data Center · Meta · Los Lunas (approximate location)Meta Los Lunas expansion (Greater Kudu) · Meta · Los Lunas (approximate location)H5 Albuquerque Data Center · H5 Data Centers · Albuquerque (approximate location)Switch LAS VEGAS 2 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 4 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 5 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 7 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 8 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 9 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 11 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 12 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 10 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 15 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 14 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 16 · Switch · Las Vegas (approximate location)Google Henderson · Google · Henderson (approximate location)Microsoft Silver Springs · Microsoft · Silver Springs (approximate location)Centra RNO2 · Centra · Reno (approximate location)Colovore RNO01 · Colovore · Reno (approximate location)Oppidan Reno (North Virginia Street) · Oppidan · Reno (approximate location)Lumen Reno (220 Gardner Street) · Lumen · Reno (approximate location)Novva Las Vegas · Novva Data Centers · North Las Vegas (approximate location)Flexential Las Vegas – North · Flexential · North Las Vegas (approximate location)Flexential Las Vegas – Downtown · Flexential · Las Vegas (approximate location)DataBank LAS1 Las Vegas · DataBank · Las Vegas (approximate location)EdgeConneX LAS01 Las Vegas · EdgeConneX · Las Vegas (approximate location)Fiberhub LAS1 · Fiberhub · Las Vegas (approximate location)Aligned SLC-01 · Aligned Data Centers · West Jordan (approximate location)Aligned SLC-02 · Aligned Data Centers · West Jordan (approximate location)Aligned SLC-03 · Aligned Data Centers · West Jordan (approximate location)Aligned SLC-04 · Aligned Data Centers · West Valley City (approximate location)Novva Utah Data Center · Novva Data Centers · West Jordan (approximate location)DataBank SLC1 Salt Lake City · DataBank · Salt Lake City (approximate location)DataBank SLC2 Salt Lake City · DataBank · Bluffdale (approximate location)DataBank SLC3 Salt Lake City · DataBank · Bluffdale (approximate location)DataBank SLC4 Salt Lake City · DataBank · Bluffdale (approximate location)DataBank SLC5 Salt Lake City · DataBank · Bluffdale (approximate location)DataBank SLC6 Salt Lake City · DataBank · Bluffdale (approximate location)Flexential Salt Lake City – Downtown · Flexential · Salt Lake City (approximate location)Flexential Salt Lake City – Millcreek · Flexential · Salt Lake City (approximate location)Flexential Salt Lake City – Fair Park · Flexential · Salt Lake City (approximate location)Flexential Salt Lake City – South Valley · Flexential · West Jordan (approximate location)Meta Eagle Mountain Data Center · Meta · Eagle Mountain (approximate location)QTS SLC1 Eagle Mountain · QTS · Eagle Mountain (approximate location)Tract Eagle Mountain (Project Tripletail) · Tract · Eagle Mountain (approximate location)Google Eagle Mountain · Google · Eagle Mountain (approximate location)NSA Utah Data Center · National Security Agency · Bluffdale (approximate location)XMission Salt Lake City · XMission · Salt Lake City (approximate location)
Operational Under construction Planned

Market snapshot

United States data center market: key facts

  • Capacity under construction or planned (5,391 MW) is 2.2 times the operational base of 2,506 MW.
  • The three largest operators by operational capacity, CyrusOne, Centersquare and DataBank, hold 58% of tracked operational MW.
  • PowerHouse Data Centers has the largest development pipeline in United States: 2,635 MW under construction or planned.
  • The largest operational facility we track is CyrusOne Chandler PHX1-PHX8 (CyrusOne, Chandler) at 169 MW.
  • The largest project in the pipeline is PowerHouse PAX-1 (1,350 MW, planned).
  • Northern Virginia is the largest cluster: 117 of 553 facilities and 27% of tracked capacity.
  • By type, the tracker lists 304 colocation, 236 hyperscale and 5 other facilities.
  • 9 facilities publish a PUE figure; the lowest is 1.30 at Flexential Dallas – Plano (Flexential) and the median is 1.50.
  • 157 of 553 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational2,506 MW
Under construction1,931 MW
Planned3,460 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
12≤2011'12'13'14'15'1640'17'18'19'2048'21'2260'23

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in United States by tracked capacity, MW
CyrusOne749 MW
DataBank466 MW
TeraWulf438 MW
NTT DATA327 MW

OperationalUnder construction or planned

Capacity by market in United States, MW
Northern Virginia2,161 MW
Central Pennsylvania1,350 MW
Richmond1,151 MW
Fredericksburg VA900 MW
Phoenix706 MW
Western New York438 MW
Dallas-Fort Worth358 MW
New York / New Jersey298 MW
Salt Lake City135 MW
Houston126 MW

OperationalUnder construction or planned

Facilities by type
Colocation304
Hyperscale236
Other5
Edge4
Enterprise4

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the United States data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 7 October 2026. Government sources are linked; the full source list comes with the Excel data.

Data centers consumed about 4.4% of total U.S. electricity in 2023, according to a Lawrence Berkeley National Laboratory report released by the U.S. Department of Energy on December 20, 2024. The same report found total data center electricity use rose from 58 TWh in 2014 to 176 TWh in 2023. U.S. Department of Energy

Policy and incentives

Virginia exempts computer equipment and enabling software bought or leased for data centers from state retail sales and use tax (Code of Virginia 58.1-609.3), for facilities with at least $150 million of new capital investment and 50 new jobs paying 1.5 times the local average wage; thresholds fall to $70 million and 10 jobs in distressed localities. Virginia Legislative Information System, Code of Virginia

Under the Code of Virginia 58.1-609.3, the base data center sales and use tax exemption runs from July 1, 2010 to June 30, 2035, with extensions to June 30, 2040 and June 30, 2050 tied to cumulative investment of $35 billion with 1,000 jobs and $100 billion with 2,500 jobs. Virginia Legislative Information System, Code of Virginia

The Texas Comptroller administers a state sales tax exemption for qualifying data centers of at least 100,000 square feet whose owners or occupants commit to at least 20 qualifying jobs in the county and a $200 million capital investment over five years; the exemption lasts 10 years, or 15 years for investment of at least $250 million. Texas Comptroller of Public Accounts

The Illinois Department of Commerce and Economic Opportunity (DCEO) states that, following a Governor's directive of June 5, 2026, it no longer processes applications for the state data center incentive program as of July 1, 2026. The program required at least $250 million of capital investment over 60 months and 20 new full-time jobs. Illinois Department of Commerce and Economic Opportunity

Executive Order 14318, signed July 23, 2025, defines data center projects as facilities requiring more than 100 MW of new load dedicated to AI inference, training, simulation or synthetic data generation, and directs expedited federal permitting for qualifying projects, including those with at least $500 million in committed capital expenditures. The White House

Power and grid

Texas Senate Bill 6 (89th Legislature, 2025) adds Section 37.0561 to the Utilities Code, requiring the Public Utility Commission of Texas to adopt standards for interconnecting large load customers in the ERCOT power region, with a demand threshold of 75 megawatts unless the commission determines a lower threshold is necessary. Texas Legislature Online

On December 18, 2025, the Federal Energy Regulatory Commission (FERC) directed PJM Interconnection, in Docket EL25-49-000 et al., to revise its tariff so that transmission customers serving load co-located with generating facilities can choose from several transmission service options. Federal Energy Regulatory Commission

On June 18, 2026, the Federal Energy Regulatory Commission issued show cause orders to six grid operators (PJM, MISO, SPP, CAISO, ISO-NE and NYISO), giving them 60 days to justify their tariffs as just and reasonable without large-load provisions or to file tariff changes. Federal Energy Regulatory Commission

Oregon House Bill 3546 (2025) requires the Public Utility Commission of Oregon to create a separate classification of service, with its own tariff schedule, for large energy use facilities using 20 MW or more and primarily providing services under NAICS code 518210, and requires their service contracts to run 10 years or longer. Oregon State Legislature (OLIS)

According to the U.S. Energy Information Administration, annual average U.S. retail electricity prices in 2025 were 8.62 cents per kWh for industrial customers and 13.41 cents per kWh for commercial customers; the overall 2025 average of 13.63 cents per kWh is cited to preliminary Electric Power Monthly data. U.S. Energy Information Administration

Land, zoning and sites

According to Loudoun County, Virginia, much data center development in the county was permitted by right until March 2025. The Board of Supervisors has approved changes to the Comprehensive Plan and zoning so that data centers now require an approved special exception application, eliminating data centers as a by-right use in the county. Loudoun County Government – Data Centers Land Use FAQ

On September 10, 2024, the Fairfax County, Virginia Board of Supervisors approved a data center zoning ordinance amendment requiring data center buildings to be at least 200 feet from adjacent residential lot lines and at least one mile from a Metro station. Fairfax County Government News

In July 2025 the U.S. Department of Energy selected four federal sites for AI data center and energy infrastructure development: Idaho National Laboratory, Oak Ridge Reservation, Paducah Gaseous Diffusion Plant and Savannah River Site. U.S. Department of Energy

Demand and connectivity

According to a U.S. Department of Energy release of December 20, 2024 on a Lawrence Berkeley National Laboratory report, total U.S. data center electricity usage rose from 58 TWh in 2014 to 176 TWh in 2023. U.S. Department of Energy

The U.S. Census Bureau reported in January 2025, citing Bureau of Labor Statistics data, that the number of people working in U.S. data centers grew from 306,000 in 2016 to 501,000 in 2023, an increase of more than 60%. U.S. Census Bureau – America Counts

In an August 7, 2025 release on new submarine cable rules, the Federal Communications Commission stated there are 90 FCC-licensed submarine cable systems and that submarine cable systems carry roughly 99% of global internet traffic. Federal Communications Commission

The Federal Communications Commission reported in August 2025 that U.S. cable landing licensees had reported more than 5.3 million Gbps of available submarine cable capacity as of December 2022. Federal Communications Commission

Sustainability, water and climate

The U.S. Energy Information Administration reports that renewable energy sources supplied about 24% of total U.S. utility-scale electricity generation in 2025, when total utility-scale generation was about 4.43 trillion kWh. U.S. Energy Information Administration – Electricity in the U.S.

The U.S. Energy Information Administration reports that natural gas was the largest source of U.S. utility-scale electricity generation in 2025 at about 41%, followed by nuclear at about 18% and coal at about 17%. U.S. Energy Information Administration – Electricity in the U.S.

The U.S. Environmental Protection Agency's eGRID database with 2023 data, released in January 2025 and revised in June 2025, gives a U.S. average CO2 output emission rate of 767.209 lb/MWh for electricity generation. U.S. Environmental Protection Agency – eGRID Summary Data

Minnesota's 2025 data center law (2025 First Special Session, Chapter 12, H.F. 16) provides that when a data center contacts the state Department of Natural Resources about a project likely to consume more than 100 million gallons of water annually, the DNR may request information from the data center to assess the consumption's impact. Minnesota House Research – Act Summary, Chapter 12

Operators in United States

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
DataBank40244 MW222 MW9.7%
Digital Realty40—192 MW—
Equinix35———
Amazon Web Services25———
QTS24101 MW22.5 MW4%
CyrusOne22749 MW—30%
Aligned Data Centers2082 MW—3.3%
Switch2040 MW55 MW1.6%
Microsoft20———
Iron Mountain14227 MW—9%
NTT DATA13159 MW168 MW6.3%
H5 Data Centers1373 MW42 MW2.9%
Flexential1360.1 MW—2.4%
Google13———
Centersquare12466 MW—19%
TierPoint12———
Cogent12———
EdgeConneX91.5 MW—0.1%
Meta9———
STACK Infrastructure9—17 MW—
Vantage Data Centers846 MW—1.8%
Prime Data Centers88 MW252 MW0.3%
Tract8———
Cologix8—51 MW—
CoreSite8———
TeraWulf760 MW378 MW2.4%
CloudHQ7———
Stream Data Centers7———
PowerHouse Data Centers660 MW2,635 MW2.4%
365 Data Centers637.1 MW—1.5%
Sabey Data Centers6———
EdgeCore5———
Skybox Datacenters5———
Rowan Digital Infrastructure5———
Chirisa Technology Parks428 MW520 MW1.1%
Compass Datacenters410.8 MW—0.4%
Novva Data Centers4———
Element Critical39.5 MW—0.4%
TRG Datacenters36 MW—0.2%
Expedient30.8 MW—0%

Largest data center projects in United States

Under construction and planned facilities with a stated capacity, largest first. 1,931 MW under construction and 3,460 MW planned in total.

ProjectLocationStatusTypeCapacity
PowerHouse PAX-1PowerHouse Data Centers Carlisle Planned Hyperscale 1,350 MW
PowerHouse 95PowerHouse Data Centers Planned Hyperscale 900 MW
CleanArc VA1 Caroline County campusCleanArc Data Centers Under construction Hyperscale 300 MW
Menlo Digital MD-VA3 RichmondMenlo Digital Richmond Planned Hyperscale 300 MW
PowerHouse PacificPowerHouse Data Centers Ashburn Under construction Hyperscale 265 MW
CTP-04/05/06Chirisa Technology Parks Richmond Planned Colocation 200 MW
DDC Campus (1600 Digital Drive)Chirisa Technology Parks Planned Hyperscale 200 MW
Digital Realty Manassas hyperscale buildings (2 x 96MW)Digital Realty Manassas Under construction Hyperscale 192 MW
Lake Mariner CB-4TeraWulf Under construction Hyperscale 168 MW
Lake Mariner CB-5TeraWulf Under construction Hyperscale 168 MW
Menlo Digital MD-VA2 SterlingMenlo Digital Sterling Planned Hyperscale 144 MW
IAD6 Culpeper Campus Data CenterDataBank Culpeper Planned Colocation 120 MW

How United States compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States553892,506 MW5,391 MW
Argentina5510.5 MW920 MW
Chile441682.6 MW663 MW
Colombia16117 MW19.2 MW
Peru534.7 MW20 MW
Guatemala21—2 MW
Ecuador111 MW—
Panama22——
Bolivia11——
Dominican Republic11——
Venezuela11——
Paraguay11——

Data center deals in United States

Our Deal Tracker lists 102 deals in United States since January 2026, with $374.88B in disclosed value.

  • Google → 890MW nuclear PPA (11 units in IL, NJ, PA) plus 2.7GW PJM supply agreement Power deal $4.30B · 3,600 MW
  • TeraWulf → Muskie Data Campus, eastern Kentucky (contracted power raised from 500MW to 1GW) Power deal · 1,000 MW
  • Blackstart Digital → Former IBM Almaden Research Center, 650 Harry Road (35 acres, 25MW substation) M&A
  • Ares Secondaries funds (Ares Management) → Sabey Data Center Properties (SDCP) M&A
  • Crusoe → Two data centers, Country Road 233 and P2390, Jayton, Kent County (each 759,260 sq ft) Land / campus $4.80B
  • SoftBank Group → DigitalBridge Group (digital infrastructure investor) M&A $3.10B

All United States deals in the Deal Tracker

Facilities

553 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
PowerHouse PAX-1PowerHouse Data Centers Carlisle Planned 1,350 MW total — Operator / official
PowerHouse 95PowerHouse Data Centers Planned 900 MW total — Operator / official
CleanArc VA1 Caroline County campusCleanArc Data Centers Under construction 300 MW total — Trade press
Menlo Digital MD-VA3 RichmondMenlo Digital Richmond Planned 300 MW total — Trade press
PowerHouse PacificPowerHouse Data Centers Ashburn Under construction 265 MW total — Operator / official
CTP-04/05/06Chirisa Technology Parks Richmond Planned 200 MW total — Operator / official
DDC Campus (1600 Digital Drive)Chirisa Technology Parks Planned 200 MW total — Trade press
Digital Realty Manassas hyperscale buildings (2 x 96MW)Digital Realty
1 deal
Manassas Under construction 192 MW IT — Operator / official
CyrusOne Chandler PHX1-PHX8CyrusOne Chandler Operational 169 MW IT — Operator / official
Lake Mariner CB-4TeraWulf Under construction 168 MW IT — Operator / official
Lake Mariner CB-5TeraWulf Under construction 168 MW IT — Operator / official
Menlo Digital MD-VA2 SterlingMenlo Digital Sterling Planned 144 MW total — Trade press
Centersquare Sterling IAD1Centersquare Sterling Operational 143 MW total — Operator / official
CTP-02 & CTP-03Chirisa Technology Parks Richmond Under construction 120 MW total — Operator / official
IAD6 Culpeper Campus Data CenterDataBank Culpeper Planned 120 MW IT — Operator / official
PowerHouse ArcolaPowerHouse Data Centers
1 deal
Arcola Under construction 120 MW total — Operator / official
CyrusOne Sterling NVA5-NVA7CyrusOne Sterling Operational 116 MW IT — Operator / official
NTT DATA Gainesville VA11NTT DATA
History
  1. Planned
  2. Planned
Gainesville Planned 96 MW IT — Operator / official
CyrusOne HOU3-HOU4 HoustonCyrusOne Houston Operational 84 MW IT — Operator / official
CyrusOne DFW3-DFW4 AllenCyrusOne Allen Operational 77 MW IT — Operator / official
IAD5 Culpeper Campus Data CenterDataBank Culpeper Under construction 72 MW IT — Operator / official
PowerHouse ABX-1PowerHouse Data Centers Ashburn Operational 60 MW total 2023 Operator / official
QTS Ashburn 1 DC1QTS Sterling Operational 55 MW IT — Operator / official
Switch TAHOE RENO 2Switch
History
  1. Under construction
  2. Under construction
Under construction 55 MW total — Operator / official
Centersquare Piscataway EWR3Centersquare Piscataway Operational 54.8 MW total — Operator / official
Centersquare DFW1 Fort WorthCentersquare Fort Worth Operational 51.9 MW total — Operator / official
Cologix ASH2 AshburnCologix Ashburn Under construction 51 MW total — Operator / official
Aligned SLC-02Aligned Data Centers
History
  1. Operational
  2. Operational
West Jordan Operational 48 MW total 2021 Trade press
Iron Mountain AZP-2 PhoenixIron Mountain Phoenix Operational 48 MW IT — Operator / official
Menlo Digital MD-DC1 HerndonMenlo Digital Herndon Under construction 48 MW IT — Operator / official
Prime PHX01-01 AvondalePrime Data Centers Under construction 48 MW IT — Operator / official
Prime PHX01-02 AvondalePrime Data Centers Under construction 48 MW IT — Operator / official
Prime PHX01-03 AvondalePrime Data Centers Under construction 48 MW IT — Operator / official
Prime PHX01-04 AvondalePrime Data Centers Under construction 48 MW IT — Operator / official
Prime PHX01-05 AvondalePrime Data Centers Planned 48 MW IT — Operator / official
Centersquare Weehawken EWR2Centersquare Weehawken Operational 45.7 MW total — Operator / official
CyrusOne DFW1 CarrolltonCyrusOne Carrollton Operational 45 MW IT — Operator / official
CyrusOne Sterling NVA1-NVA3CyrusOne Sterling Operational 44 MW IT — Operator / official
H5 AshburnH5 Data Centers Ashburn Under construction 42 MW total — Operator / official
Lake Mariner CB-2TeraWulf Operational 42 MW IT — Operator / official
Lake Mariner CB-3TeraWulf Under construction 42 MW IT — Operator / official
QTS Phoenix 2 DC1QTS Phoenix Operational 42 MW IT — Operator / official
Iron Mountain AZP-1 PhoenixIron Mountain Phoenix Operational 41 MW IT — Operator / official
CoreWeave Kenilworth (NEST campus, 11 Nest Drive)CoreWeave
History
  1. Planned
  2. Under construction
Kenilworth Under construction 40 MW IT — Trade press
DataBank DFW8 PlanoDataBank Plano Operational 40 MW IT — Operator / official
IAD3 Ashburn Campus Data CenterDataBank Ashburn Operational 40 MW IT — Operator / official
Switch LAS VEGAS 10Switch Las Vegas Operational 40 MW total 2017 Operator / official
CyrusOne Sterling NVA9CyrusOne Sterling Operational 38 MW IT — Operator / official
CyrusOne SAT2-SAT4 San AntonioCyrusOne San Antonio Operational 36 MW IT — Operator / official
Iron Mountain AZP-3 PhoenixIron Mountain Phoenix Operational 36 MW IT — Operator / official

Get the data

Every data center in United States, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

Data Centers in United States: Capacity Sheet

553 facilities

Every tracked data center in United States with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

$199 USD

Buy now

Excel · instant download · secure checkout by PayPal

All countries

Global Data Center Database: annual licence

1,469 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

$1,499 USD / year

Subscribe

Full database now, a fresh file every month. Renews yearly; cancel anytime in PayPal.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in United States

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

Secure checkout

Data pack

Loading secure checkout…

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in United States?

DC Market Insights tracks 553 data centers in United States as of October 2026: 336 operational, 74 under construction and 143 planned, run by 89 operators. The count grows as we verify more sites.

What is the data center capacity of United States?

Tracked operational capacity in United States is 2,506 MW, with 1,931 MW under construction and 3,460 MW planned. These totals use the capacity each source states (IT load where given) and cover 157 of 553 tracked facilities.

Which companies operate the most data center capacity in United States?

By tracked operational capacity, the largest operators in United States are CyrusOne (749 MW), Centersquare (466 MW) and DataBank (244 MW).

Where are the data centers in United States located?

The largest clusters by tracked capacity are Northern Virginia (117 facilities), Central Pennsylvania (2 facilities) and Richmond (24 facilities). The map above shows every site.

Which new data centers are being built in United States?

We track 1,931 MW under construction and 3,460 MW planned. The largest projects are PowerHouse PAX-1 (1,350 MW), PowerHouse 95 (900 MW) and CleanArc VA1 Caroline County campus (300 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst