Proprietary data

maincubes Data Centers

Data centers operated by maincubes that we have verified: location, status and capacity, each checked against its source.

In short

As of 10 October 2026, DC Market Insights tracks 7 data centers operated by maincubes in 2 countries, of which 5 are operational. Stated operational capacity is 44 MW, with a further 186 MW under construction and 40 MW planned. The pipeline is 5.1 times the capacity already operating.

7Facilities tracked
2Countries
44 MWOperational (5 sites)
186 MWUnder construction (1 site)
40 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 7 of 7 facilities have a stated capacity; the others are counted as sites only.

FRA01 · maincubes · Frankfurt am Main (approximate location)FRA02 · maincubes · Schwalbach am Taunus (approximate location)FRA03 · maincubes · Schwalbach am Taunus (approximate location)FRA04 · maincubes · Dietzenbach (approximate location)BER02 · maincubes · Nauen (approximate location)BER01 · maincubes · Berlin (approximate location)AMS01 · maincubes · Amsterdam (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

maincubes data centers: key facts

  • Capacity under construction or planned (226 MW) is 5.1 times the operational base of 44 MW.
  • Its largest operational site is FRA03 in Schwalbach am Taunus, Germany at 16 MW.
  • The largest project in the pipeline is BER02 by maincubes (186 MW, under construction).
  • Germany accounts for 98% of tracked capacity (6 facilities).
  • 4 facilities publish a PUE figure; the lowest is 1.20 at FRA04 (maincubes) and the median is 1.30.
Capacity by status, MW
Operational44 MW
Under construction186 MW
Planned40 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
6'17'18'19'20'21'22'238'24'2516'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Capacity by country, MW
Germany265 MW

OperationalUnder construction or planned

maincubes development pipeline

Under construction and planned facilities with a stated capacity, largest first. 186 MW under construction and 40 MW planned in total.

ProjectLocationStatusTypeCapacity
BER02maincubes Nauen, Germany Under construction Colocation 186 MW
FRA04maincubes Dietzenbach, Germany Planned Colocation 40 MW

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
BER02Colocation Nauen, Germany Under construction 186 MW IT — Operator / official
FRA04Colocation
1 deal
  • Syndicate of eleven banks and one institutional fund → maincubes (DTCP-majority-owned) German data centre platform incl. FRA04 and 200MW Berlin campus
  • All deals in the Deal Tracker
Dietzenbach, Germany Planned 40 MW IT — Operator / official
FRA03Colocation
History
  1. Operational
  2. Operational
Schwalbach am Taunus, Germany Operational 16 MW IT 2026 Operator / official
BER01Colocation Berlin, Germany Operational 9 MW IT — Operator / official
FRA02Colocation Schwalbach am Taunus, Germany Operational 8 MW IT 2024 Operator / official
FRA01Colocation Frankfurt am Main, Germany Operational 6 MW IT 2017 Operator / official
AMS01Colocation
1 deal
Amsterdam, Netherlands Operational 5 MW IT — Operator / official

Market position

How maincubes compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Germany, maincubes ranks #7 of 50 tracked operators by capacity, with 5.8% of the country’s tracked MW.
  • Germany has 170 tracked data centers from 50 operators: 819 MW operational and 3,782 MW under construction or planned.
  • Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
  • In Netherlands, maincubes ranks #4 of 30 tracked operators by capacity, with 5.6% of the country’s tracked MW.
  • Schwalbach am Taunus also hosts 1 other tracked data center(s), run by noris network.
  • Our Deal Tracker lists 1 deal(s) naming maincubes, the latest on 23 July 2026.

Data center operators in Germany

Tracked facilities17050 operators
Operational capacity819 MW3,782 MW in the pipeline
maincubes rank by capacity#7of 50 operators · 5.8%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW578 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
CyrusOne760 MW192 MW
Vantage Data Centers4144 MW56 MW

All data centers in Germany Power and policy in Germany

Data center operators in Netherlands

Tracked facilities9930 operators
Operational capacity79.1 MW10 MW in the pipeline
maincubes rank by capacity#4of 30 operators · 5.6%
Industrial power price148 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NorthC1447 MW—
NTT DATA120.7 MW—
Iron Mountain2—10 MW
QTS44.8 MW—
Penta Infra41.6 MW—
Digital Realty12——
Equinix12——
Eurofiber Cloud Infra8——

All data centers in Netherlands Power and policy in Netherlands

Other data centers in Schwalbach am Taunus

Deals naming maincubes

  • NovoServe → NorthC Oude Meer and Maincubes Schiphol Rijk Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does maincubes operate?

DC Market Insights tracks 7 maincubes data center(s) in 2 countries as of October 2026: 5 operational, 1 under construction and 1 planned.

Which other companies operate data centers in Germany?

Besides maincubes, the largest operators we track in Germany by capacity are NTT DATA, Telis Energie Deutschland, Schwarz Digits (STACKIT), CloudHQ and Virtus Data Centres. The Germany page lists all 50 operators.

What rules apply to data centers in Germany?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Schwalbach am Taunus?

Other tracked data centers in Schwalbach am Taunus include FRA1 (noris network).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst