In short
As of 10 October 2026, DC Market Insights tracks 7 data centers operated by maincubes in 2 countries, of which 5 are operational. Stated operational capacity is 44 MW, with a further 186 MW under construction and 40 MW planned. The pipeline is 5.1 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 7 of 7 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
maincubes data centers: key facts
- Capacity under construction or planned (226 MW) is 5.1 times the operational base of 44 MW.
- Its largest operational site is FRA03 in Schwalbach am Taunus, Germany at 16 MW.
- The largest project in the pipeline is BER02 by maincubes (186 MW, under construction).
- Germany accounts for 98% of tracked capacity (6 facilities).
- 4 facilities publish a PUE figure; the lowest is 1.20 at FRA04 (maincubes) and the median is 1.30.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
OperationalUnder construction or planned
maincubes development pipeline
Under construction and planned facilities with a stated capacity, largest first. 186 MW under construction and 40 MW planned in total.
Facilities
7 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| BER02Colocation | Nauen, Germany | Under construction | 186 MW IT | — | Operator / official |
FRA04Colocation
1 deal
|
Dietzenbach, Germany | Planned | 40 MW IT | — | Operator / official |
FRA03Colocation
History
|
Schwalbach am Taunus, Germany | Operational | 16 MW IT | 2026 | Operator / official |
| BER01Colocation | Berlin, Germany | Operational | 9 MW IT | — | Operator / official |
| FRA02Colocation | Schwalbach am Taunus, Germany | Operational | 8 MW IT | 2024 | Operator / official |
| FRA01Colocation | Frankfurt am Main, Germany | Operational | 6 MW IT | 2017 | Operator / official |
AMS01Colocation
1 deal
|
Amsterdam, Netherlands | Operational | 5 MW IT | — | Operator / official |
Market position
How maincubes compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Germany, maincubes ranks #7 of 50 tracked operators by capacity, with 5.8% of the country’s tracked MW.
- Germany has 170 tracked data centers from 50 operators: 819 MW operational and 3,782 MW under construction or planned.
- Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
- In Netherlands, maincubes ranks #4 of 30 tracked operators by capacity, with 5.6% of the country’s tracked MW.
- Schwalbach am Taunus also hosts 1 other tracked data center(s), run by noris network.
- Our Deal Tracker lists 1 deal(s) naming maincubes, the latest on 23 July 2026.
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 578 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| CloudHQ | 2 | 112 MW | 276 MW |
| Virtus Data Centres | 2 | — | 358 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 192 MW |
| Vantage Data Centers | 4 | 144 MW | 56 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NorthC | 14 | 47 MW | — |
| NTT DATA | 1 | 20.7 MW | — |
| Iron Mountain | 2 | — | 10 MW |
| QTS | 4 | 4.8 MW | — |
| Penta Infra | 4 | 1.6 MW | — |
| Digital Realty | 12 | — | — |
| Equinix | 12 | — | — |
| Eurofiber Cloud Infra | 8 | — | — |
All data centers in Netherlands Power and policy in Netherlands
Other data centers in Schwalbach am Taunus
- FRA1 · noris network · Under construction · 30 MW
Deals naming maincubes
- NovoServe → NorthC Oude Meer and Maincubes Schiphol Rijk Land / campus
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: the source’s address where given, otherwise the city centre (approximate).
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does maincubes operate?
DC Market Insights tracks 7 maincubes data center(s) in 2 countries as of October 2026: 5 operational, 1 under construction and 1 planned.
Which other companies operate data centers in Germany?
Besides maincubes, the largest operators we track in Germany by capacity are NTT DATA, Telis Energie Deutschland, Schwarz Digits (STACKIT), CloudHQ and Virtus Data Centres. The Germany page lists all 50 operators.
What rules apply to data centers in Germany?
Our Power & Policy Tracker lists 9 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Schwalbach am Taunus?
Other tracked data centers in Schwalbach am Taunus include FRA1 (noris network).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.