Proprietary data

Telehouse Data Centers

Data centers operated by Telehouse that we have verified: location, status and capacity, each checked against its source.

In short

As of 12 October 2026, DC Market Insights tracks 7 data centers operated by Telehouse in 2 countries, of which 7 are operational. Stated operational capacity is 27.9 MW.

7Facilities tracked
2Countries
27.9 MWOperational (7 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 7 facilities have a stated capacity; the others are counted as sites only.

Telehouse North · Telehouse · London (approximate location)Telehouse North Two · Telehouse · London (approximate location)Telehouse East · Telehouse · London (approximate location)Telehouse West · Telehouse · London (approximate location)Telehouse South · Telehouse · London (approximate location)Telehouse Frankfurt Building M · Telehouse · Frankfurt am Main (approximate location)Telehouse Frankfurt Building N · Telehouse · Frankfurt am Main (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Telehouse data centers: key facts

  • Its largest operational site is Telehouse South in London, United Kingdom at 18 MW.
  • United Kingdom accounts for 65% of tracked capacity (5 facilities).
  • 3 of 7 facilities have a capacity stated by their source; the totals above count only those.
Capacity by country, MW
Germany9.9 MW

OperationalUnder construction or planned

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Telehouse SouthColocation London, United Kingdom Operational 18 MW total 2022 Operator / official
Telehouse Frankfurt Building NColocation Frankfurt am Main, Germany Operational 5.4 MW total — Trade press
Telehouse Frankfurt Building MColocation
History
  1. Operational
  2. Operational
Frankfurt am Main, Germany Operational 4.5 MW IT 2023 Operator / official
Telehouse EastColocation London, United Kingdom Operational — — Operator / official
Telehouse NorthColocation London, United Kingdom Operational — 1990 Operator / official
Telehouse North TwoColocation London, United Kingdom Operational — 2016 Operator / official
Telehouse WestColocation London, United Kingdom Operational — 2010 Operator / official

Market position

How Telehouse compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Telehouse ranks #29 of 45 tracked operators by capacity, with 0.3% of the country’s tracked MW.
  • United Kingdom has 177 tracked data centers from 45 operators: 748 MW operational and 6,405 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • In Germany, Telehouse ranks #31 of 53 tracked operators by capacity, with 0.2% of the country’s tracked MW.
  • London also hosts 10 other tracked data center(s), run by Ada Infrastructure, Pure DC, Pure DC / SEGRO JV and Global Switch.

Data center operators in United Kingdom

Tracked facilities17745 operators
Operational capacity748 MW6,405 MW in the pipeline
Telehouse rank by capacity#29of 45 operators · 0.3%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Humber Tech Park1—386 MW
Equinix15—250 MW
Virtus Data Centres1196.9 MW145 MW
Ada Infrastructure1—210 MW

All data centers in United Kingdom Power and policy in United Kingdom

Data center operators in Germany

Tracked facilities17553 operators
Operational capacity845 MW4,436 MW in the pipeline
Telehouse rank by capacity#31of 53 operators · 0.2%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Other data centers in London

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Telehouse operate?

DC Market Insights tracks 7 Telehouse data center(s) in 2 countries as of October 2026: 7 operational, 0 under construction and 0 planned.

Which other companies operate data centers in United Kingdom?

Besides Telehouse, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Humber Tech Park. The United Kingdom page lists all 45 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in London?

Other tracked data centers in London include Docklands Campus (Ada Infrastructure), Pure DC London Brent Cross (LON01) Building 2 (Pure DC), Pure DC London Park Royal (LON02) (Pure DC / SEGRO JV) and Global Switch London South (Global Switch).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst