Telis Energie Deutschland Data Centers

Data centers operated by Telis Energie Deutschland that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data center operated by Telis Energie Deutschland in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
500 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Hohenhameln (Mehrum) · Telis Energie Deutschland · Hohenhameln (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Telis Energie Deutschland data centers: key facts

  • The largest project in the pipeline is Hohenhameln (Mehrum) by Telis Energie Deutschland (500 MW, planned).

Telis Energie Deutschland development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 500 MW planned in total.

ProjectLocationStatusTypeCapacity
Hohenhameln (Mehrum)Telis Energie Deutschland Hohenhameln, Germany Planned Other 500 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Hohenhameln (Mehrum)Other Hohenhameln, Germany Planned 500 MW total — Trade press

Market position

How Telis Energie Deutschland compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Germany, Telis Energie Deutschland ranks #2 of 50 tracked operators by capacity, with 11% of the country’s tracked MW.
  • Germany has 170 tracked data centers from 50 operators: 819 MW operational and 3,782 MW under construction or planned.
  • Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).

Data center operators in Germany

Tracked facilities17050 operators
Operational capacity819 MW3,782 MW in the pipeline
Telis Energie Deutschland rank by capacity#2of 50 operators · 11%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW578 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW
CyrusOne760 MW192 MW
Vantage Data Centers4144 MW56 MW

All data centers in Germany Power and policy in Germany

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Telis Energie Deutschland operate?

DC Market Insights tracks 1 Telis Energie Deutschland data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Germany?

Besides Telis Energie Deutschland, the largest operators we track in Germany by capacity are NTT DATA, Schwarz Digits (STACKIT), CloudHQ, Virtus Data Centres and Amazon Web Services. The Germany page lists all 50 operators.

What rules apply to data centers in Germany?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst