Proprietary data

MedOne Data Centers

Data centers operated by MedOne that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 10 data centers operated by MedOne in 1 country, of which 4 are operational. Stated operational capacity is 23 MW, with a further — under construction and 42 MW planned. The pipeline is 1.8 times the capacity already operating.

10Facilities tracked
1Countries
23 MWOperational (4 sites)
—Under construction (0 sites)
42 MWPlanned (6 sites)

MW = IT capacity where the source states it, otherwise total capacity. 7 of 10 facilities have a stated capacity; the others are counted as sites only.

TC1 Tirat Carmel · MedOne · Tirat Carmel (approximate location)TC2 Tirat Carmel · MedOne · Tirat Carmel (approximate location)TC3 Tirat Carmel · MedOne · Tirat Carmel (approximate location)TC4 Tirat Carmel · MedOne · Tirat Carmel (approximate location)KY1 Kfar Yona · MedOne · Kfar Yona (approximate location)KY2 Kfar Yona · MedOne · Kfar Yona (approximate location)Petach Tikva PT1/PT2 · MedOne · Petah Tikva (approximate location)RM1 Ramla · MedOne · Ramla (approximate location)RM2 Ramla · MedOne · Ramla (approximate location)RM3 Ramla · MedOne · Ramla (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

MedOne data centers: key facts

  • Capacity under construction or planned (42 MW) is 1.8 times the operational base of 23 MW.
  • Its largest operational site is RM1 Ramla in Ramla, Israel at 10.5 MW.
  • The largest project in the pipeline is KY1 Kfar Yona by MedOne (10.5 MW, planned).
  • By type, the tracker lists 5 colocation, 4 hyperscale and 1 enterprise facilities.
  • 7 of 10 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational23 MW
Planned42 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
13≤2013'14'15'16'17'18'19'20'21'22'23'2411'25

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Facilities by type
Colocation5
Hyperscale4
Enterprise1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

MedOne development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 42 MW planned in total.

ProjectLocationStatusTypeCapacity
KY1 Kfar YonaMedOne Kfar Yona, Israel Planned Hyperscale 10.5 MW
KY2 Kfar YonaMedOne Kfar Yona, Israel Planned Hyperscale 10.5 MW
RM2 RamlaMedOne Ramla, Israel Planned Colocation 10.5 MW
RM3 RamlaMedOne Ramla, Israel Planned Colocation 10.5 MW

Facilities

10 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
KY1 Kfar YonaHyperscale Kfar Yona, Israel Planned 10.5 MW IT — Operator / official
KY2 Kfar YonaHyperscale Kfar Yona, Israel Planned 10.5 MW IT — Operator / official
RM1 RamlaColocation Ramla, Israel Operational 10.5 MW IT 2025 Operator / official
RM2 RamlaColocation Ramla, Israel Planned 10.5 MW IT — Operator / official
RM3 RamlaColocation Ramla, Israel Planned 10.5 MW IT — Operator / official
TC1 Tirat CarmelHyperscale Tirat Carmel, Israel Operational 10.5 MW IT 1999 Operator / official
Petach Tikva PT1/PT2Enterprise Petah Tikva, Israel Operational 2 MW 2000 Operator / official
TC2 Tirat CarmelHyperscale Tirat Carmel, Israel Operational — 2023 Operator / official
TC3 Tirat CarmelColocation Tirat Carmel, Israel Planned — — Operator / official
TC4 Tirat CarmelColocation Tirat Carmel, Israel Planned — — Operator / official

Market position

How MedOne compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Israel, MedOne ranks #1 of 3 tracked operators by capacity, with 76% of the country’s tracked MW.
  • Israel has 13 tracked data centers from 3 operators: 33 MW operational and 52.5 MW under construction or planned.

Data center operators in Israel

Tracked facilities133 operators
Operational capacity33 MW52.5 MW in the pipeline
MedOne rank by capacity#1of 3 operators · 76%
OperatorFacilitiesOperational MWPipeline MW
Global Technical Realty1—10.5 MW
Serverfarm210 MW—

All data centers in Israel

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does MedOne operate?

DC Market Insights tracks 10 MedOne data center(s) in 1 country as of November 2026: 4 operational, 0 under construction and 6 planned.

Which other companies operate data centers in Israel?

Besides MedOne, the largest operators we track in Israel by capacity are Global Technical Realty and Serverfarm. The Israel page lists all 3 operators.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst