Proprietary data

Chief Telecom Data Centers

Data centers operated by Chief Telecom that we have verified: location, status and capacity, each checked against its source.

In short

As of 5 November 2026, DC Market Insights tracks 5 data centers operated by Chief Telecom in 1 country, of which 4 are operational. Stated operational capacity is 20 MW, with a further 16 MW under construction and — planned. The pipeline is 0.8 times the capacity already operating.

5Facilities tracked
1Countries
20 MWOperational (4 sites)
16 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 5 facilities have a stated capacity; the others are counted as sites only.

Chief Telecom LY2 (聯雲智能資料中心) · Chief Telecom · Neihu District (approximate location)Chief Telecom LY (麗源網路中心) · Chief Telecom · Neihu District (approximate location)Chief Telecom HD (宏鼎雲端中心) · Chief Telecom · Neihu District (approximate location)Chief Telecom Tengfu (騰富) IDC · Chief Telecom · Neihu District (approximate location)Chief Telecom Huwei AI Data Center · Chief Telecom · Huwei Township (CTSP Huwei Park) (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Chief Telecom data centers: key facts

  • Capacity under construction or planned (16 MW) is 0.8 times the operational base of 20 MW.
  • Its largest operational site is Chief Telecom LY2 (聯雲智能資料中心) in Neihu District, Taiwan at 20 MW.
  • The largest project in the pipeline is Chief Telecom Huwei AI Data Center (16 MW, under construction).
  • 2 of 5 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational20 MW
Under construction16 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Chief Telecom development pipeline

Under construction and planned facilities with a stated capacity, largest first. 16 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Chief Telecom Huwei AI Data CenterChief Telecom Huwei Township (CTSP Huwei Park), Taiwan Under construction Colocation 16 MW

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Chief Telecom LY2 (聯雲智能資料中心)Colocation
History
  1. Under construction
  2. Operational
  3. Operational
  4. Operational
Neihu District, Taiwan Operational 20 MW total 2024 Trade press
Chief Telecom Huwei AI Data CenterColocation
History
  1. Planned
  2. Under construction
Huwei Township (CTSP Huwei Park), Taiwan Under construction 16 MW total — Trade press
Chief Telecom HD (宏鼎雲端中心)Colocation Neihu District, Taiwan Operational — — Trade press
Chief Telecom LY (麗源網路中心)Colocation Neihu District, Taiwan Operational — — Trade press
Chief Telecom Tengfu (騰富) IDCColocation Neihu District, Taiwan Operational — — Trade press

Market position

How Chief Telecom compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Taiwan, Chief Telecom ranks #1 of 11 tracked operators by capacity, with 36% of the country’s tracked MW.
  • Taiwan has 21 tracked data centers from 11 operators: 56 MW operational and 45 MW under construction or planned.
  • Neihu District also hosts 3 other tracked data center(s), run by Empyrion Digital, Chunghwa Telecom and Taiwan Mobile.

Data center operators in Taiwan

Tracked facilities2111 operators
Operational capacity56 MW45 MW in the pipeline
Chief Telecom rank by capacity#1of 11 operators · 36%
Renewable share of generation12.7%2025
OperatorFacilitiesOperational MWPipeline MW
Epoch Digital1—22 MW
Vantage Data Centers116 MW—
NCHC (NARLabs)215 MW—
Empyrion Digital1—7 MW
Foxconn15 MW—
Chunghwa Telecom4——
Google2——
Taiwan Mobile2——

All data centers in Taiwan Power and policy in Taiwan

Other data centers in Neihu District

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Chief Telecom operate?

DC Market Insights tracks 5 Chief Telecom data center(s) in 1 country as of November 2026: 4 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Taiwan?

Besides Chief Telecom, the largest operators we track in Taiwan by capacity are Epoch Digital, Vantage Data Centers, NCHC (NARLabs), Empyrion Digital and Foxconn. The Taiwan page lists all 11 operators.

What rules apply to data centers in Taiwan?

Our Power & Policy Tracker lists 12 government actions on data centers and power in Taiwan, including 1 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Neihu District?

Other tracked data centers in Neihu District include Empyrion Digital TW1 Taipei (Empyrion Digital), Chunghwa Telecom Neihu Binjiang IDC (Chunghwa Telecom) and Taiwan Mobile Neihu Cloud IDC (Taiwan Mobile).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst