Proprietary data

Vantage Data Centers Data Centers

Data centers operated by Vantage Data Centers that we have verified: location, status and capacity, each checked against its source.

In short

As of 9 November 2026, DC Market Insights tracks 49 data centers operated by Vantage Data Centers in 14 countries, of which 24 are operational. Stated operational capacity is 1,043 MW, with a further 3,246 MW under construction and 1,601 MW planned. The pipeline is 4.6 times the capacity already operating.

49Facilities tracked
14Countries
1,043 MWOperational (24 sites)
3,246 MWUnder construction (9 sites)
1,601 MWPlanned (16 sites)

MW = IT capacity where the source states it, otherwise total capacity. 43 of 49 facilities have a stated capacity; the others are counted as sites only.

JHB1 · Vantage Data Centers · Kulai (approximate location)Cyberjaya campus 1 · Vantage Data Centers · Cyberjaya (approximate location)KUL2 (Cyberjaya II campus) · Vantage Data Centers · Cyberjaya (approximate location)Berlin I (BER1) · Vantage Data Centers · Ludwigsfelde (approximate location)Berlin II (BER2) · Vantage Data Centers · Mittenwalde (approximate location)Frankfurt I (FRA1) · Vantage Data Centers · Offenbach am Main (approximate location)Vantage VA11 (Ashburn VA1 campus) · Vantage Data Centers · Sterling (approximate location)Vantage VA12 (Ashburn VA1 campus) · Vantage Data Centers · Sterling (approximate location)Vantage CA12 Santa Clara · Vantage Data Centers · Santa Clara (approximate location)Vantage CA21 Santa Clara · Vantage Data Centers · Santa Clara (approximate location)Vantage CA22 Santa Clara · Vantage Data Centers · Santa Clara (approximate location)Vantage CA3 Santa Clara · Vantage Data Centers · Santa Clara (approximate location)Vantage Trident Aurora · Vantage Data Centers · Aurora (approximate location)Frankfurt II (FRA2) · Vantage Data Centers · Raunheim (exact location)Vantage WA1 Quincy · Vantage Data Centers · Quincy (exact location) · Cooling: Hybrid
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Vantage Data Centers data centers: key facts

About Vantage Data Centers

Vantage Data Centers is a global provider of digital infrastructure serving AI and cloud innovators, building and operating hyperscale data center campuses across North America, EMEA and Asia Pacific. Its website lists 42 locations: 17 in North America (Virginia, Ohio, Arizona, Wisconsin, Washington, Nevada, California, Texas and Quebec), 15 in EMEA and 8 in Asia Pacific. Launched in 2010 with a Santa Clara campus and backed by DigitalBridge and Silver Lake, it is developing gigawatt-scale AI campuses such as Frontier in Texas (1.4GW) and Lighthouse in Wisconsin (902MW).

Headquarters
Denver, United States
Founded
2010
Ownership
Private; equity investment of $9.2 billion led by DigitalBridge and Silver Lake (2024); AustralianSuper in EMEA platform; GIC and ADIA in APAC platform
Parent company
DigitalBridge and Silver Lake (lead equity investors)
Tracked footprint
49 facilities in 14 countries
Website
vantage-dc.com

Data center business

  • Vantage's website lists 42 data center locations: 17 in North America, 15 in EMEA and 8 in Asia Pacific, across the US, Canada, Germany, Ireland, Italy, Poland, South Africa, Switzerland, the UK, Australia, Hong Kong, Japan, Malaysia and Taiwan.
  • Vantage launched in June 2010, backed by Silver Lake, by buying a Santa Clara data center formerly owned by Intel; it later added Quincy, Washington (2013), Northern Virginia (2017) and Arizona and Canada (2019).
  • The company entered Europe in 2020 (a USD 2 billion expansion), Asia-Pacific in 2021 through the Agile Data Centers and PCCW data center acquisitions, and South Africa in 2021.
  • In Virginia, Vantage lists Ashburn I-III and Fredericksburg (VA4, 192MW), which takes its Virginia footprint to 782MW.
  • The Santa Clara I campus has 77MW of critical IT load in six data centers (CA11-CA16); with Santa Clara II (75MW) and Santa Clara III (64MW), Silicon Valley capacity reaches 216MW once complete.
  • The three Montreal sites (QC1 11MW, QC4 and QC6 30MW) offer a combined 89MW of IT capacity, and Quebec City (QC2) offers 86MW of critical IT load.
  • In Asia Pacific, Vantage states 1GW of operational and planned capacity across the region, including Johor (300MW+), Cyberjaya, Hong Kong, Taipei, Osaka and Melbourne.
  • Vantage completed a $9.2 billion equity investment led by DigitalBridge and Silver Lake in 2024; AustralianSuper invested in the EMEA platform (EUR 1.5 billion, 2023).

Recent updates

  • Vantage secured a $2 billion credit facility for its North American early-stage development platform, adding to more than $40 billion of capital raised this year.
  • Vantage and Nebius announced Nebius's first deployment at Vantage's South Wales AI Growth Zone campus; Vantage expects to deliver more than 1GW of AI-ready capacity across Newport, Bridgend and Bro Tathan.
  • Vantage appointed Ed Harnaga as Chief Marketing and Communications Officer.
  • Altarea and Vantage announced a partnership to develop an AI and cloud data center campus on Altarea land close to Bordeaux, France, with a 400MW grid connection secured.
  • Vantage and Liberty Energy (LPI) agreed to deliver up to 1GW of power agreements for Vantage's next-generation data center campuses.
  • Vantage completed a $1.6 billion investment in its APAC platform from GIC and ADIA and closed the acquisition of Yondr's 300MW+ hyperscale campus in Johor, Malaysia.
  • OpenAI, Oracle and Vantage announced the Lighthouse Stargate site in Port Washington, Wisconsin: four data centers providing close to a gigawatt of AI capacity, completion scheduled for 2028.
  • Vantage announced a second Italian campus near Milan with two data centers delivering a combined 32MW of critical IT capacity; first phase slated for spring 2026.

Company details checked against company and official sources, 14 Oct 2026.

  • Capacity under construction or planned (4,847 MW) is 4.6 times the operational base of 1,043 MW.
  • Its largest operational site is JHB1 in Kulai, Malaysia at 300 MW.
  • The largest project in the pipeline is Vantage Frontier Shackelford County (1,400 MW, under construction).
  • United States accounts for 68% of tracked capacity (22 facilities).
  • 43 of 49 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational1,043 MW
Under construction3,246 MW
Planned1,601 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Malaysia767 MW
Germany200 MW
Canada127 MW
Italy96 MW
Japan68 MW

OperationalUnder construction or planned

Vantage Data Centers development pipeline

Under construction and planned facilities with a stated capacity, largest first. 3,246 MW under construction and 1,601 MW planned in total.

ProjectLocationStatusTypeCapacity
Vantage Frontier Shackelford CountyVantage Data Centers United States Under construction Hyperscale 1,400 MW
Vantage Lighthouse (Port Washington)Vantage Data Centers Port Washington, United States Under construction Hyperscale 902 MW
KUL2 (Cyberjaya II campus)Vantage Data Centers Cyberjaya, Malaysia Under construction Hyperscale 436 MW
Vantage Trident AuroraVantage Data Centers Aurora, United States Planned Hyperscale 334 MW
Vantage Ashburn III (VA3) campusVantage Data Centers Ashburn, United States Planned Hyperscale 288 MW
Vantage NV1Vantage Data Centers Sparks, United States Planned Hyperscale 224 MW
Vantage Fredericksburg (VA4) campusVantage Data Centers Fredericksburg, United States Planned Hyperscale 192 MW
Vantage OH1Vantage Data Centers New Albany, United States Under construction Hyperscale 192 MW
Vantage AZ1 GoodyearVantage Data Centers Goodyear, United States Under construction Hyperscale 176 MW
Vantage Johannesburg I (JNB1) campusVantage Data Centers Johannesburg, South Africa Planned Hyperscale 120 MW
Vantage Ashburn II (VA2) campusVantage Data Centers Sterling, United States Planned Hyperscale 96 MW
Vantage Osaka (KIX1) campusVantage Data Centers Ibaraki, Japan Under construction Hyperscale 68 MW

Facilities

49 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Vantage Frontier Shackelford CountyHyperscale Cooling: Hybrid
History
  1. Under construction
  2. Planned
  3. Under construction
  4. Under construction
United States Under construction 1,400 MW IT — Operator / official
Vantage Lighthouse (Port Washington)Hyperscale Cooling: Direct liquid · Leased in colocation: Vantage Port Washington (Lighthouse), for Oracle and OpenAI (Stargate)
History
  1. Planned
  2. Announced
  3. Under construction
Port Washington, United States Under construction 902 MW IT — Operator / official
KUL2 (Cyberjaya II campus)Hyperscale
History
  1. Under construction
  2. Under construction
Cyberjaya, Malaysia Under construction 436 MW IT — Operator / official
Vantage Trident AuroraHyperscale Aurora, United States Planned 334 MW IT — Trade press
JHB1Hyperscale Kulai, Malaysia Operational 300 MW IT — Operator / official
Vantage Ashburn III (VA3) campusHyperscale Ashburn, United States Planned 288 MW IT — Operator / official
Vantage NV1Hyperscale Cooling: Hybrid Sparks, United States Planned 224 MW IT — Operator / official
Vantage Fredericksburg (VA4) campusHyperscale Fredericksburg, United States Planned 192 MW IT — Operator / official
Vantage OH1Hyperscale Cooling: Chilled water, dry coolers New Albany, United States Under construction 192 MW IT — Operator / official
Vantage AZ1 GoodyearHyperscale Cooling: Chilled water, dry coolers
History
  1. Under construction
  2. Under construction
Goodyear, United States Under construction 176 MW IT — Operator / official
Cardiff Campus (Newport)Hyperscale
2 deals
  • ABS investors → Vantage Data Centers Cardiff campus (CWL11, CWL13) – EMEA ABS
  • Nebius → AI capacity at Vantage CWL1 campus, Newport (South Wales AI Growth Zone)
  • All deals in the Deal Tracker
Newport, United Kingdom Operational 148 MW IT — Operator / official
Vantage Johannesburg I (JNB1) campusHyperscale Johannesburg, South Africa Planned 120 MW IT — Operator / official
Vantage Ashburn II (VA2) campusHyperscale Cooling: Chilled water, dry coolers Sterling, United States Planned 96 MW IT — Operator / official
Vantage WA1 QuincyHyperscale Cooling: Hybrid Quincy, United States Operational 89 MW IT — Operator / official
Vantage Quebec City (QC2) campusHyperscale Quebec City, Canada Operational 86 MW IT — Operator / official
Vantage Osaka (KIX1) campusHyperscale
History
  1. Under construction
  2. Under construction
Ibaraki, Japan Under construction 68 MW IT — Operator / official
Vantage Melbourne (MEL1) campusHyperscale Melbourne, Australia Planned 64 MW IT — Operator / official
Vantage Milan I (MXP1) campusHyperscale Cooling: Hybrid Melegnano, Italy Planned 64 MW IT — Operator / official
Berlin I (BER1)Hyperscale
History
  1. Operational
  2. Operational
Ludwigsfelde, Germany Operational 56 MW IT — Operator / official
Frankfurt I (FRA1)Hyperscale
History
  1. Operational
  2. Operational
  3. Planned
  4. Operational
Offenbach am Main, Germany Operational 56 MW IT — Operator / official
Frankfurt II (FRA2)Hyperscale
History
  1. Operational
  2. Operational
Raunheim, Germany Operational 56 MW IT — Operator / official
Vantage London (LHR1) campusHyperscale London, United Kingdom Planned 55 MW IT — Operator / official
Vantage Dublin (DUB1) campusHyperscale Dublin, Ireland Planned 52 MW IT — Operator / official
Vantage Warsaw (WAW1) campusHyperscale Cooling: Chilled water, dry coolers · Owned (self-build): greenfield campus, ground broken by Vantage Warsaw, Poland Planned 48 MW IT — Operator / official
Vantage Zurich I (ZRH1) campusHyperscale Cooling: Chilled water, dry coolers Winterthur, Switzerland Planned 40 MW IT — Operator / official
Berlin II (BER2)Hyperscale
History
  1. Operational
  2. Operational
Mittenwalde, Germany Operational 32 MW IT — Operator / official
Vantage Milan II campusHyperscale
History
  1. Under construction
  2. Under construction
Settimo Milanese, Italy Under construction 32 MW IT — Operator / official
Cyberjaya campus 1Hyperscale Cyberjaya, Malaysia Operational 31 MW IT — Trade press
Vantage Montreal III (QC6)Hyperscale Montreal, Canada Operational 30 MW IT — Operator / official
Vantage VA11 (Ashburn VA1 campus)Hyperscale Sterling, United States Operational 30 MW IT — Operator / official
Vantage Zurich II (ZRH2)Hyperscale Glattfelden, Switzerland Planned 24 MW IT — Operator / official
Vantage CA11 Santa ClaraHyperscale Santa Clara, United States Operational 21.3 MW IT — Operator / official
Vantage Johannesburg II (JNB2)Hyperscale Ekurhuleni, South Africa Under construction 20 MW IT — Operator / official
Vantage London (LHR2)Hyperscale London, United Kingdom Under construction 20 MW IT — Operator / official
Vantage CA15 Santa ClaraHyperscale Santa Clara, United States Operational 17 MW IT — Operator / official
Vantage Taipei (TPE1)Hyperscale Taipei, Taiwan Operational 16 MW IT — Operator / official
Vantage VA12 (Ashburn VA1 campus)Hyperscale Sterling, United States Operational 16 MW IT — Operator / official
Vantage Kwai Chung (HKG3)Hyperscale Kwai Chung, Hong Kong Operational 14 MW IT — Operator / official
Vantage Fo Tan (HKG2)Hyperscale Fo Tan, Hong Kong Operational 13 MW IT — Operator / official
Vantage Montreal I (QC1)Hyperscale Montreal, Canada Operational 11 MW IT — Operator / official
Vantage CA16 Santa ClaraHyperscale Santa Clara, United States Operational 9 MW IT — Operator / official
Vantage CA13 Santa ClaraHyperscale Santa Clara, United States Operational 6 MW IT — Operator / official
Vantage CA14 Santa ClaraHyperscale Santa Clara, United States Operational 6 MW IT — Operator / official
Vantage CA12 Santa ClaraHyperscale Santa Clara, United States Operational — — Operator / official
Vantage CA21 Santa ClaraHyperscale
History
  1. Under construction
  2. Operational
Santa Clara, United States Operational — — Trade press
Vantage CA22 Santa ClaraHyperscale Santa Clara, United States Operational — — Trade press
Vantage CA3 Santa ClaraHyperscale Santa Clara, United States Planned — — Operator / official
Vantage Montreal II (QC4) campusHyperscale Montreal, Canada Planned — — Operator / official
Vantage Wyoming CampusHyperscale United States Planned — — Trade press

Market position

How Vantage Data Centers compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Vantage Data Centers ranks #4 of 171 tracked operators by capacity, with 5.1% of the country’s tracked MW.
  • United States has 1,317 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Germany, Vantage Data Centers ranks #10 of 56 tracked operators by capacity, with 3.8% of the country’s tracked MW.
  • In Canada, Vantage Data Centers ranks #6 of 18 tracked operators by capacity, with 1.2% of the country’s tracked MW.
  • Santa Clara also hosts 10 other tracked data center(s), run by EdgeCore Digital Infrastructure, STACK Infrastructure, Centersquare and CloudHQ.
  • Our Deal Tracker lists 2 deal(s) naming Vantage Data Centers, the latest on 21 October 2026.

Data center operators in United States

Tracked facilities1,317171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Vantage Data Centers rank by capacity#4of 171 operators · 5.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW
QTS471,977 MW283 MW

All data centers in United States Power and policy in United States

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
Vantage Data Centers rank by capacity#10of 56 operators · 3.8%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Data center operators in Canada

Tracked facilities7818 operators
Operational capacity495 MW9,870 MW in the pipeline
Vantage Data Centers rank by capacity#6of 18 operators · 1.2%
Renewable share of generation63.9%2024
OperatorFacilitiesOperational MWPipeline MW
O'Leary Ventures1—7,500 MW
Meta1—1,000 MW
Beacon AI Centers1—920 MW
Bell Canada2—300 MW
eStruxture16148 MW90 MW
Cologix2386.4 MW—
QScale2—60 MW
STACK Infrastructure156 MW—

All data centers in Canada Power and policy in Canada

Other data centers in Santa Clara

  • EdgeCore Silicon Valley Campus · EdgeCore Digital Infrastructure · Operational · 72 MW
  • STACK Infrastructure SVY02 Santa Clara · STACK Infrastructure · Operational · 48 MW
  • Centersquare SFO2 Santa Clara · Centersquare · Operational · 43.2 MW
  • Centersquare SFO4 Santa Clara · Centersquare · Operational · 43.1 MW
  • SJC Campus (SJC1) · CloudHQ · Planned · 42 MW
  • Centersquare SFO1 Santa Clara · Centersquare · Operational · 34.5 MW
  • CoreSite SV9 Santa Clara · CoreSite · Operational · 34 MW
  • NTT DATA SV1 Santa Clara · NTT DATA · Operational · 16 MW
  • Cologix SV1 · Cologix · Operational · 9 MW
  • Evocative SJC11 Santa Clara · Evocative · Operational · 9 MW

Deals naming Vantage Data Centers

  • Vantage Data Centers (via Powhatan Technology Park LLC) → Powhatan Technology Park site Land / campus $9.4M
  • Evercore and Wells Fargo Securities (lead arrangers) with ~12 insurance and institutional investors → Vantage Data Centers – North American early-stage development platform (initial collateral pool of three development assets) Financing $2.00B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Vantage Data Centers operate?

DC Market Insights tracks 49 Vantage Data Centers data center(s) in 14 countries as of November 2026: 24 operational, 9 under construction and 16 planned.

Where is Vantage Data Centers headquartered?

Vantage Data Centers is headquartered in Denver, United States. Ownership: Private; equity investment of $9.2 billion led by DigitalBridge and Silver Lake (2024); AustralianSuper in EMEA platform; GIC and ADIA in APAC platform.

Which other companies operate data centers in United States?

Besides Vantage Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Beale Infrastructure and OpenAI. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Santa Clara?

Other tracked data centers in Santa Clara include EdgeCore Silicon Valley Campus (EdgeCore Digital Infrastructure), STACK Infrastructure SVY02 Santa Clara (STACK Infrastructure), Centersquare SFO2 Santa Clara (Centersquare) and Centersquare SFO4 Santa Clara (Centersquare).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst