As of 9 November 2026, DC Market Insights tracks 49 data centers operated by Vantage Data Centers in 14 countries, of which 24 are operational. Stated operational capacity is 1,043 MW, with a further 3,246 MW under construction and 1,601 MW planned. The pipeline is 4.6 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 43 of 49 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Vantage Data Centers data centers: key facts
About Vantage Data Centers
Vantage Data Centers is a global provider of digital infrastructure serving AI and cloud innovators, building and operating hyperscale data center campuses across North America, EMEA and Asia Pacific. Its website lists 42 locations: 17 in North America (Virginia, Ohio, Arizona, Wisconsin, Washington, Nevada, California, Texas and Quebec), 15 in EMEA and 8 in Asia Pacific. Launched in 2010 with a Santa Clara campus and backed by DigitalBridge and Silver Lake, it is developing gigawatt-scale AI campuses such as Frontier in Texas (1.4GW) and Lighthouse in Wisconsin (902MW).
- Headquarters
- Denver, United States
- Founded
- 2010
- Ownership
- Private; equity investment of $9.2 billion led by DigitalBridge and Silver Lake (2024); AustralianSuper in EMEA platform; GIC and ADIA in APAC platform
- Parent company
- DigitalBridge and Silver Lake (lead equity investors)
- Tracked footprint
- 49 facilities in 14 countries
- Website
- vantage-dc.com
Data center business
- Vantage's website lists 42 data center locations: 17 in North America, 15 in EMEA and 8 in Asia Pacific, across the US, Canada, Germany, Ireland, Italy, Poland, South Africa, Switzerland, the UK, Australia, Hong Kong, Japan, Malaysia and Taiwan.
- Vantage launched in June 2010, backed by Silver Lake, by buying a Santa Clara data center formerly owned by Intel; it later added Quincy, Washington (2013), Northern Virginia (2017) and Arizona and Canada (2019).
- The company entered Europe in 2020 (a USD 2 billion expansion), Asia-Pacific in 2021 through the Agile Data Centers and PCCW data center acquisitions, and South Africa in 2021.
- In Virginia, Vantage lists Ashburn I-III and Fredericksburg (VA4, 192MW), which takes its Virginia footprint to 782MW.
- The Santa Clara I campus has 77MW of critical IT load in six data centers (CA11-CA16); with Santa Clara II (75MW) and Santa Clara III (64MW), Silicon Valley capacity reaches 216MW once complete.
- The three Montreal sites (QC1 11MW, QC4 and QC6 30MW) offer a combined 89MW of IT capacity, and Quebec City (QC2) offers 86MW of critical IT load.
- In Asia Pacific, Vantage states 1GW of operational and planned capacity across the region, including Johor (300MW+), Cyberjaya, Hong Kong, Taipei, Osaka and Melbourne.
- Vantage completed a $9.2 billion equity investment led by DigitalBridge and Silver Lake in 2024; AustralianSuper invested in the EMEA platform (EUR 1.5 billion, 2023).
Recent updates
- Vantage secured a $2 billion credit facility for its North American early-stage development platform, adding to more than $40 billion of capital raised this year.
- Vantage and Nebius announced Nebius's first deployment at Vantage's South Wales AI Growth Zone campus; Vantage expects to deliver more than 1GW of AI-ready capacity across Newport, Bridgend and Bro Tathan.
- Vantage appointed Ed Harnaga as Chief Marketing and Communications Officer.
- Altarea and Vantage announced a partnership to develop an AI and cloud data center campus on Altarea land close to Bordeaux, France, with a 400MW grid connection secured.
- Vantage and Liberty Energy (LPI) agreed to deliver up to 1GW of power agreements for Vantage's next-generation data center campuses.
- Vantage completed a $1.6 billion investment in its APAC platform from GIC and ADIA and closed the acquisition of Yondr's 300MW+ hyperscale campus in Johor, Malaysia.
- OpenAI, Oracle and Vantage announced the Lighthouse Stargate site in Port Washington, Wisconsin: four data centers providing close to a gigawatt of AI capacity, completion scheduled for 2028.
- Vantage announced a second Italian campus near Milan with two data centers delivering a combined 32MW of critical IT capacity; first phase slated for spring 2026.
Company details checked against company and official sources, 14 Oct 2026.
- Capacity under construction or planned (4,847 MW) is 4.6 times the operational base of 1,043 MW.
- Its largest operational site is JHB1 in Kulai, Malaysia at 300 MW.
- The largest project in the pipeline is Vantage Frontier Shackelford County (1,400 MW, under construction).
- United States accounts for 68% of tracked capacity (22 facilities).
- 43 of 49 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Vantage Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 3,246 MW under construction and 1,601 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Vantage Frontier Shackelford CountyVantage Data Centers | United States | Under construction | Hyperscale | 1,400 MW |
| Vantage Lighthouse (Port Washington)Vantage Data Centers | Port Washington, United States | Under construction | Hyperscale | 902 MW |
| KUL2 (Cyberjaya II campus)Vantage Data Centers | Cyberjaya, Malaysia | Under construction | Hyperscale | 436 MW |
| Vantage Trident AuroraVantage Data Centers | Aurora, United States | Planned | Hyperscale | 334 MW |
| Vantage Ashburn III (VA3) campusVantage Data Centers | Ashburn, United States | Planned | Hyperscale | 288 MW |
| Vantage NV1Vantage Data Centers | Sparks, United States | Planned | Hyperscale | 224 MW |
| Vantage Fredericksburg (VA4) campusVantage Data Centers | Fredericksburg, United States | Planned | Hyperscale | 192 MW |
| Vantage OH1Vantage Data Centers | New Albany, United States | Under construction | Hyperscale | 192 MW |
| Vantage AZ1 GoodyearVantage Data Centers | Goodyear, United States | Under construction | Hyperscale | 176 MW |
| Vantage Johannesburg I (JNB1) campusVantage Data Centers | Johannesburg, South Africa | Planned | Hyperscale | 120 MW |
| Vantage Ashburn II (VA2) campusVantage Data Centers | Sterling, United States | Planned | Hyperscale | 96 MW |
| Vantage Osaka (KIX1) campusVantage Data Centers | Ibaraki, Japan | Under construction | Hyperscale | 68 MW |
Facilities
49 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Vantage Frontier Shackelford CountyHyperscale
Cooling: Hybrid
History
|
United States | Under construction | 1,400 MW IT | — | Operator / official |
Vantage Lighthouse (Port Washington)Hyperscale
Cooling: Direct liquid · Leased in colocation: Vantage Port Washington (Lighthouse), for Oracle and OpenAI (Stargate)
History
|
Port Washington, United States | Under construction | 902 MW IT | — | Operator / official |
KUL2 (Cyberjaya II campus)Hyperscale
History
|
Cyberjaya, Malaysia | Under construction | 436 MW IT | — | Operator / official |
| Vantage Trident AuroraHyperscale | Aurora, United States | Planned | 334 MW IT | — | Trade press |
| JHB1Hyperscale | Kulai, Malaysia | Operational | 300 MW IT | — | Operator / official |
| Vantage Ashburn III (VA3) campusHyperscale | Ashburn, United States | Planned | 288 MW IT | — | Operator / official |
| Vantage NV1Hyperscale Cooling: Hybrid | Sparks, United States | Planned | 224 MW IT | — | Operator / official |
| Vantage Fredericksburg (VA4) campusHyperscale | Fredericksburg, United States | Planned | 192 MW IT | — | Operator / official |
| Vantage OH1Hyperscale Cooling: Chilled water, dry coolers | New Albany, United States | Under construction | 192 MW IT | — | Operator / official |
Vantage AZ1 GoodyearHyperscale
Cooling: Chilled water, dry coolers
History
|
Goodyear, United States | Under construction | 176 MW IT | — | Operator / official |
Cardiff Campus (Newport)Hyperscale
2 deals
|
Newport, United Kingdom | Operational | 148 MW IT | — | Operator / official |
| Vantage Johannesburg I (JNB1) campusHyperscale | Johannesburg, South Africa | Planned | 120 MW IT | — | Operator / official |
| Vantage Ashburn II (VA2) campusHyperscale Cooling: Chilled water, dry coolers | Sterling, United States | Planned | 96 MW IT | — | Operator / official |
| Vantage WA1 QuincyHyperscale Cooling: Hybrid | Quincy, United States | Operational | 89 MW IT | — | Operator / official |
| Vantage Quebec City (QC2) campusHyperscale | Quebec City, Canada | Operational | 86 MW IT | — | Operator / official |
Vantage Osaka (KIX1) campusHyperscale
History
|
Ibaraki, Japan | Under construction | 68 MW IT | — | Operator / official |
| Vantage Melbourne (MEL1) campusHyperscale | Melbourne, Australia | Planned | 64 MW IT | — | Operator / official |
| Vantage Milan I (MXP1) campusHyperscale Cooling: Hybrid | Melegnano, Italy | Planned | 64 MW IT | — | Operator / official |
Berlin I (BER1)Hyperscale
History
|
Ludwigsfelde, Germany | Operational | 56 MW IT | — | Operator / official |
Frankfurt I (FRA1)Hyperscale
History
|
Offenbach am Main, Germany | Operational | 56 MW IT | — | Operator / official |
Frankfurt II (FRA2)Hyperscale
History
|
Raunheim, Germany | Operational | 56 MW IT | — | Operator / official |
| Vantage London (LHR1) campusHyperscale | London, United Kingdom | Planned | 55 MW IT | — | Operator / official |
| Vantage Dublin (DUB1) campusHyperscale | Dublin, Ireland | Planned | 52 MW IT | — | Operator / official |
| Vantage Warsaw (WAW1) campusHyperscale Cooling: Chilled water, dry coolers · Owned (self-build): greenfield campus, ground broken by Vantage | Warsaw, Poland | Planned | 48 MW IT | — | Operator / official |
| Vantage Zurich I (ZRH1) campusHyperscale Cooling: Chilled water, dry coolers | Winterthur, Switzerland | Planned | 40 MW IT | — | Operator / official |
Berlin II (BER2)Hyperscale
History
|
Mittenwalde, Germany | Operational | 32 MW IT | — | Operator / official |
Vantage Milan II campusHyperscale
History
|
Settimo Milanese, Italy | Under construction | 32 MW IT | — | Operator / official |
| Cyberjaya campus 1Hyperscale | Cyberjaya, Malaysia | Operational | 31 MW IT | — | Trade press |
| Vantage Montreal III (QC6)Hyperscale | Montreal, Canada | Operational | 30 MW IT | — | Operator / official |
| Vantage VA11 (Ashburn VA1 campus)Hyperscale | Sterling, United States | Operational | 30 MW IT | — | Operator / official |
| Vantage Zurich II (ZRH2)Hyperscale | Glattfelden, Switzerland | Planned | 24 MW IT | — | Operator / official |
| Vantage CA11 Santa ClaraHyperscale | Santa Clara, United States | Operational | 21.3 MW IT | — | Operator / official |
| Vantage Johannesburg II (JNB2)Hyperscale | Ekurhuleni, South Africa | Under construction | 20 MW IT | — | Operator / official |
| Vantage London (LHR2)Hyperscale | London, United Kingdom | Under construction | 20 MW IT | — | Operator / official |
| Vantage CA15 Santa ClaraHyperscale | Santa Clara, United States | Operational | 17 MW IT | — | Operator / official |
| Vantage Taipei (TPE1)Hyperscale | Taipei, Taiwan | Operational | 16 MW IT | — | Operator / official |
| Vantage VA12 (Ashburn VA1 campus)Hyperscale | Sterling, United States | Operational | 16 MW IT | — | Operator / official |
| Vantage Kwai Chung (HKG3)Hyperscale | Kwai Chung, Hong Kong | Operational | 14 MW IT | — | Operator / official |
| Vantage Fo Tan (HKG2)Hyperscale | Fo Tan, Hong Kong | Operational | 13 MW IT | — | Operator / official |
| Vantage Montreal I (QC1)Hyperscale | Montreal, Canada | Operational | 11 MW IT | — | Operator / official |
| Vantage CA16 Santa ClaraHyperscale | Santa Clara, United States | Operational | 9 MW IT | — | Operator / official |
| Vantage CA13 Santa ClaraHyperscale | Santa Clara, United States | Operational | 6 MW IT | — | Operator / official |
| Vantage CA14 Santa ClaraHyperscale | Santa Clara, United States | Operational | 6 MW IT | — | Operator / official |
| Vantage CA12 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Operator / official |
Vantage CA21 Santa ClaraHyperscale
History
|
Santa Clara, United States | Operational | — | — | Trade press |
| Vantage CA22 Santa ClaraHyperscale | Santa Clara, United States | Operational | — | — | Trade press |
| Vantage CA3 Santa ClaraHyperscale | Santa Clara, United States | Planned | — | — | Operator / official |
| Vantage Montreal II (QC4) campusHyperscale | Montreal, Canada | Planned | — | — | Operator / official |
| Vantage Wyoming CampusHyperscale | United States | Planned | — | — | Trade press |
Market position
How Vantage Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Vantage Data Centers ranks #4 of 171 tracked operators by capacity, with 5.1% of the country’s tracked MW.
- United States has 1,317 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Germany, Vantage Data Centers ranks #10 of 56 tracked operators by capacity, with 3.8% of the country’s tracked MW.
- In Canada, Vantage Data Centers ranks #6 of 18 tracked operators by capacity, with 1.2% of the country’s tracked MW.
- Santa Clara also hosts 10 other tracked data center(s), run by EdgeCore Digital Infrastructure, STACK Infrastructure, Centersquare and CloudHQ.
- Our Deal Tracker lists 2 deal(s) naming Vantage Data Centers, the latest on 21 October 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Canada
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| O'Leary Ventures | 1 | — | 7,500 MW |
| Meta | 1 | — | 1,000 MW |
| Beacon AI Centers | 1 | — | 920 MW |
| Bell Canada | 2 | — | 300 MW |
| eStruxture | 16 | 148 MW | 90 MW |
| Cologix | 23 | 86.4 MW | — |
| QScale | 2 | — | 60 MW |
| STACK Infrastructure | 1 | 56 MW | — |
All data centers in Canada Power and policy in Canada
Other data centers in Santa Clara
- EdgeCore Silicon Valley Campus · EdgeCore Digital Infrastructure · Operational · 72 MW
- STACK Infrastructure SVY02 Santa Clara · STACK Infrastructure · Operational · 48 MW
- Centersquare SFO2 Santa Clara · Centersquare · Operational · 43.2 MW
- Centersquare SFO4 Santa Clara · Centersquare · Operational · 43.1 MW
- SJC Campus (SJC1) · CloudHQ · Planned · 42 MW
- Centersquare SFO1 Santa Clara · Centersquare · Operational · 34.5 MW
- CoreSite SV9 Santa Clara · CoreSite · Operational · 34 MW
- NTT DATA SV1 Santa Clara · NTT DATA · Operational · 16 MW
- Cologix SV1 · Cologix · Operational · 9 MW
- Evocative SJC11 Santa Clara · Evocative · Operational · 9 MW
Deals naming Vantage Data Centers
- Vantage Data Centers (via Powhatan Technology Park LLC) → Powhatan Technology Park site Land / campus $9.4M
- Evercore and Wells Fargo Securities (lead arrangers) with ~12 insurance and institutional investors → Vantage Data Centers – North American early-stage development platform (initial collateral pool of three development assets) Financing $2.00B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Vantage Data Centers operate?
DC Market Insights tracks 49 Vantage Data Centers data center(s) in 14 countries as of November 2026: 24 operational, 9 under construction and 16 planned.
Where is Vantage Data Centers headquartered?
Vantage Data Centers is headquartered in Denver, United States. Ownership: Private; equity investment of $9.2 billion led by DigitalBridge and Silver Lake (2024); AustralianSuper in EMEA platform; GIC and ADIA in APAC platform.
Which other companies operate data centers in United States?
Besides Vantage Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Beale Infrastructure and OpenAI. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Santa Clara?
Other tracked data centers in Santa Clara include EdgeCore Silicon Valley Campus (EdgeCore Digital Infrastructure), STACK Infrastructure SVY02 Santa Clara (STACK Infrastructure), Centersquare SFO2 Santa Clara (Centersquare) and Centersquare SFO4 Santa Clara (Centersquare).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.