Proprietary data

Higher Education Commission (HEC) Data Centers

Data centers operated by Higher Education Commission (HEC) that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data center operated by Higher Education Commission (HEC) in 1 country (1 operational). Stated operational capacity is 4 MW.

1Facilities tracked
1Countries
4 MWOperational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

HEC Astrolabe Data Centre · Higher Education Commission (HEC) · Karachi (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Higher Education Commission (HEC) data centers: key facts

  • Its largest operational site is HEC Astrolabe Data Centre in Karachi, Pakistan at 4 MW.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
HEC Astrolabe Data CentreEnterprise Karachi, Pakistan Operational 4 MW total 2025 Trade press

Market position

How Higher Education Commission (HEC) compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Pakistan, Higher Education Commission (HEC) ranks #2 of 17 tracked operators by capacity, with 20% of the country’s tracked MW.
  • Pakistan has 24 tracked data centers from 17 operators: 15.5 MW operational and 5 MW under construction or planned.
  • Industrial electricity in Pakistan costs 97.5 USD/MWh (2026, latest official figure).
  • Karachi also hosts 9 other tracked data center(s), run by SKY47 (Mari Energies), Cybernet (Cyber Internet Services), Data Vault Pakistan and Multinet Pakistan.

Data center operators in Pakistan

Tracked facilities2417 operators
Operational capacity15.5 MW5 MW in the pipeline
Higher Education Commission (HEC) rank by capacity#2of 17 operators · 20%
Industrial power price97.5 USD/MWh2026

All data centers in Pakistan Power and policy in Pakistan

Other data centers in Karachi

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Higher Education Commission (HEC) operate?

DC Market Insights tracks 1 Higher Education Commission (HEC) data center(s) in 1 country as of October 2026: 1 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Pakistan?

Besides Higher Education Commission (HEC), the largest operators we track in Pakistan by capacity are SKY47 (Mari Energies), Jazz (VEON), Wateen Telecom, Multinet Pakistan and PTCL. The Pakistan page lists all 17 operators.

What rules apply to data centers in Pakistan?

Our Power & Policy Tracker lists 11 government actions on data centers and power in Pakistan, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Karachi?

Other tracked data centers in Karachi include SKY47 Indus-01 (SKY47 (Mari Energies)), Cybernet Karachi Data Center (Cybernet (Cyber Internet Services)), Data Vault Pakistan AI Data Center (Data Vault Pakistan) and Multinet Karachi Data Center (Multinet Pakistan).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst