As of 8 October 2026, DC Market Insights tracks 11 government actions on data centers and power in Pakistan, 6 of them in force. We have found no moratorium or restriction on new data centers in force in Pakistan. 1 incentive scheme applies: Special Technology Zones Authority (STZA) Zone Enterprise fiscal incentives under the Special Technology Zones Act, 2021.

11Actions tracked
6In force
97.5 USD/MWhIndustrial power price
34.7%Renewable share of generation

Market snapshot

Pakistan power and policy: key facts

  • Industrial electricity price: 97.5 USD/MWh (2026). Rank 19 of 30 tracked countries, highest first.
  • Renewable share of electricity generation: 34.7% (2025). Rank 24 of 42 tracked countries, highest first.
  • Latest change: Decision on Federal Government Motion and Policy Guidelines for Uniform Application of Use of System Charges (National Electric Power Regulatory Authority (NEPRA), 7 Sep 2026).
  • By type: 5 regulation, 2 power tariff, 2 plan or strategy and 1 renewable energy.

Power indicators for Pakistan

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 97.5 USD/MWh 2026 · NEPRA uniform tariff B-3 (11/33 kV, up to 500 kW) variable rate Rs 27.00/kWh per Feb 2026 rationalization decision (energy charge only; excludes Rs 1,250/kW/month fixed charge, adjustments and taxes); converted at SBP interbank weighted average rate ~276. NEPRA
Renewable share of electricity generation 34.7% 2025 · Pakistan Economic Survey 2024-25 Table 14.2, generation July-March FY2025: hydel 30.41% + renewable 4.24% (nuclear 19.05% excluded) Finance Division, Pakistan Economic Survey 2024-25
Peak electricity demand 30.2 GW 2024 · NEPRA State of Industry Report 2024: maximum demand of CPPA-G system (excludes K-Electric) FY2023-24, 30,150 MW; maximum load actually served 25,516 MW NEPRA State of Industry Report 2024
Installed generation capacity 46.6 GW 2025 · Total installed generation capacity as of July-March FY2025 (includes 2,813 MW net metering), 46,605 MW 2024: 45.9 GW Finance Division, Pakistan Economic Survey 2024-25

In force now in Pakistan

Power tariff (2)

  • Power tariffIn force

    Decision on Rationalization of Tariff for XWDISCOs and K-Electric (Federal Government motion)

    NEPRA approved the Federal Government motion revising the uniform tariff with category-wise fixed charges; fixed-charge recovery is used to reduce the cross subsidy of industrial consumers, lowering industrial variable rates by Rs 1/kWh to Rs 4.58/kWh depending on category. The approved B-3 (11/33 kV, up to 500 kW) rate is Rs 27.00/kWh non-TOU (peak Rs 35.68, off-peak Rs 23.67) with a fixed charge of Rs 1,250/kW/month.

    4.58 PKR/kWh max industrial variable rate cut Notified via SRO 279(I)/2026 dated 12-02-2026 per NEPRA tariff page.

    National Electric Power Regulatory Authority (NEPRA) · NEPRA

  • Power tariffIn force

    Incremental Consumption Package for Industrial and Agriculture Electricity Consumers of XWDISCOs & K-Electric

    NEPRA approved a rate of PKR 22.98 per unit for incremental consumption by industrial and private agricultural consumers of XWDISCOs and K-Electric, effective for three years from the date of approval and expiring automatically at the end of that period.

    22.98 PKR/kWh incremental rate Applies to incremental consumption only; the decision does not mention data centres. Notified as SRO 2409(I)/2025 dated 10-12-2025 per NEPRA tariff page.

    National Electric Power Regulatory Authority (NEPRA) · Effective 9 Dec 2025 · NEPRA

Incentive (1)

  • IncentiveIn force

    Special Technology Zones Authority (STZA) Zone Enterprise fiscal incentives under the Special Technology Zones Act, 2021

    Zone enterprises licensed by STZA receive a 10-year exemption from income tax on profits and gains under the Income Tax Ordinance, 2001, plus customs and sales tax exemptions on imported capital goods. STZA lists 'Data Center & Cloud Computing' as an eligible IT & Computing category; incentives are applicable until June 30, 2035. (source gives year only)

    10 years income tax exemption Date is the year of the Special Technology Zones Act, 2021 cited on the page; exemption runs 10 years from licence issuance.

    Special Technology Zones Authority (STZA) · Ends 30 Jun 2035 · Special Technology Zones Authority

Regulation (2)

  • RegulationIn force

    Accreditation Criteria for Cloud Service Providers (v1.9)

    Interim Cloud Office criteria for accrediting cloud service providers serving public sector entities: data center facilities must be located within Pakistan with data processing performed in Pakistan (except open/public data); Tier II facilities for Baseline level and Tier III (TIA-942, Uptime Institute or equivalent) for Intermediate, Enhanced and Highest levels. (source gives month only)

    Interim Cloud Office, Ministry of IT & Telecom · Ministry of IT & Telecom, Pakistan

  • RegulationIn force

    Pakistan Cloud First Policy

    Public sector entities must consider cloud services for all new ICT procurement and review any projects that involve setting up a data center, ICT infrastructure or server room. Government cloud and private cloud can only be located in Pakistan. After 1 July 2022 all new ICT investments should adhere to the directions of the Cloud Office. (source gives month only)

    Ministry of Information Technology & Telecommunication (MoITT) · Ministry of IT & Telecom, Pakistan

Plan or strategy (1)

  • Plan or strategyIn force

    National Artificial Intelligence Policy 2025

    Federal Cabinet-approved AI policy with six pillars; the AI Infrastructure pillar envisions a national AI compute grid, centralized datasets, AI hubs and cloud-based resources, and the action matrix includes expanding and interlinking national data centers with HPC-capable edge nodes.

    Federal Cabinet / Ministry of IT & Telecom · Ministry of IT & Telecom, Pakistan (National AI Policy 2025)

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Renewable energyAnnounced

    Decision on Federal Government Motion and Policy Guidelines for Uniform Application of Use of System Charges

    NEPRA approved uniform Use of System Charges (UOSC) for bulk power consumers and other open access users across all eleven XWDISCOs and K-Electric, with variable grid charges per category (e.g. B-3 Rs 6.23/kWh via competitive wheeling auction, Rs 19.17/kWh outside the auction including stranded cost), a fixed grid charge of Rs 1/kW/month on sanctioned load, and an additional charge applied to all consumers. The decision was sent to the Federal Government for notification in the official Gazette within 30 days under Section 31(7) of the NEPRA Act; no explicit effective date is stated.

    6.23 PKR/kWh B-3 wheeling grid charge Auction wheeling rate excluding stranded cost for B-3. Relevant to DCs as the grid charges for bulk power consumers buying power via open access/wheeling under CTBCM.

    National Electric Power Regulatory Authority (NEPRA) · NEPRA

  • RegulationProposed

    Data Governance Policy 2026

    Policy to be issued by the Pakistan Digital Authority that requires RESTRICTED, CONFIDENTIAL and personal data, and authoritative-source data of national importance, to be hosted, stored and processed within Pakistan; cross-border processing requires PDA approval. The document lists its Gazette reference as pending Cabinet approval and SRO assignment. (source gives month only)

    Pakistan Digital Authority / Ministry of IT & Telecom · Ministry of IT & Telecom, Pakistan

  • Plan or strategyAnnounced

    Allocation of 2,000 MW of electricity for bitcoin mining and AI data centres (first phase)

    The finance ministry announced the allocation of 2,000 MW of electricity in a first phase to power bitcoin mining and AI data centres, an initiative led by the Pakistan Crypto Council under the Ministry of Finance; the announcement is described as the first phase of a multi-stage digital infrastructure rollout.

    2,000 MW allocated No official Finance Division page reachable; reported by Arab News.

    Ministry of Finance / Pakistan Crypto Council

  • RegulationProposed

    Punjab Provincial Cloud-First Policy

    Provincial cloud-first policy formulated by the Punjab Information Technology Board, dated 2 January 2024, requiring public sector entities to review projects that involve setting up a datacenter, ICT infrastructure or server room. The document states it becomes effective on legislature approval; approval is not shown in the document.

    Punjab Information Technology Board (PITB) · Punjab · Government of Punjab (PITB)

  • RegulationProposed

    Khyber Pakhtunkhwa Cloud First Policy

    Provincial cloud-first policy that requires public sector entities to review any projects involving setting up a data center and cites cost and energy savings from moving to a centralized data center; the province set up a Tier-III data centre in 2014. The document states it takes effect on approval by the Government of Khyber Pakhtunkhwa; approval is not shown in the document. (source gives month only)

    Government of Khyber Pakhtunkhwa / Khyber Pakhtunkhwa Information Technology Board · Khyber Pakhtunkhwa · Khyber Pakhtunkhwa Information Technology Board

Timeline of data center and power policy in Pakistan

DateActionTypeStatusAuthority
7 Sep 2026Decision on Federal Government Motion and Policy Guidelines for Uniform Application of Use of System ChargesRenewable energyAnnouncedNational Electric Power Regulatory Authority (NEPRA)
1 Jun 2026Data Governance Policy 2026RegulationProposedPakistan Digital Authority / Ministry of IT & Telecom
11 Feb 2026Decision on Rationalization of Tariff for XWDISCOs and K-Electric (Federal Government motion)Power tariffIn forceNational Electric Power Regulatory Authority (NEPRA)
9 Dec 2025Incremental Consumption Package for Industrial and Agriculture Electricity Consumers of XWDISCOs & K-ElectricPower tariffIn forceNational Electric Power Regulatory Authority (NEPRA)
31 Jul 2025National Artificial Intelligence Policy 2025Plan or strategyIn forceFederal Cabinet / Ministry of IT & Telecom
25 May 2025Allocation of 2,000 MW of electricity for bitcoin mining and AI data centres (first phase)Plan or strategyAnnouncedMinistry of Finance / Pakistan Crypto Council
1 May 2024Accreditation Criteria for Cloud Service Providers (v1.9)RegulationIn forceInterim Cloud Office, Ministry of IT & Telecom
2 Jan 2024Punjab Provincial Cloud-First Policy PunjabRegulationProposedPunjab Information Technology Board (PITB)
1 Dec 2023Khyber Pakhtunkhwa Cloud First Policy Khyber PakhtunkhwaRegulationProposedGovernment of Khyber Pakhtunkhwa / Khyber Pakhtunkhwa Information Technology Board
1 Feb 2022Pakistan Cloud First PolicyRegulationIn forceMinistry of Information Technology & Telecommunication (MoITT)
1 Jan 2021Special Technology Zones Authority (STZA) Zone Enterprise fiscal incentives under the Special Technology Zones Act, 2021IncentiveIn forceSpecial Technology Zones Authority (STZA)

How Pakistan compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Pakistan?

We have found no moratorium or restriction on new data centers in force in Pakistan as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.

What incentives does Pakistan offer data centers?

In force: Special Technology Zones Authority (STZA) Zone Enterprise fiscal incentives under the Special Technology Zones Act, 2021. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Pakistan?

The industrial electricity price in Pakistan was 97.5 USD/MWh in 2026 (NEPRA uniform tariff B-3 (11/33 kV, up to 500 kW) variable rate Rs 27.00/kWh per Feb 2026 rationalization decision (energy charge only; excludes Rs 1,250/kW/month fixed charge, adjustments and taxes); converted at SBP interbank weighted average rate ~276.). Data center contracts can differ by voltage level, contract length and location.

How much of Pakistan’s electricity is renewable?

Renewables supplied 34.7% of electricity generation in Pakistan in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst