Kazteleport Data Centers

Data centers operated by Kazteleport that we have verified: location, status and capacity, each checked against its source.

In short

As of 22 October 2026, DC Market Insights tracks 13 data centers operated by Kazteleport in 1 country, of which 13 are operational. Stated operational capacity is 4.4 MW.

13Facilities tracked
1Countries
4.4 MWOperational (13 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 13 facilities have a stated capacity; the others are counted as sites only.

Kazteleport Sairam Data Center · Kazteleport · Almaty (approximate location)Kazteleport Sairam Building 2 · Kazteleport · Almaty (approximate location)Kazteleport Yereymentau Data Center · Kazteleport · Astana (approximate location)Kazteleport Khan-Tengri Data Center · Kazteleport · Almaty (approximate location)Kazteleport Bogety Data Center · Kazteleport · Almaty (approximate location)Kazteleport Karatau Data Center · Kazteleport · Almaty (approximate location)Kazteleport Aktau Data Center · Kazteleport · Almaty (approximate location)Kazteleport Talgar Data Center · Kazteleport · Almaty (approximate location)Kazteleport Kumbel Data Center · Kazteleport · Almaty (approximate location)Kazteleport Okzhetpes Data Center · Kazteleport · Astana (approximate location)Kazteleport Burabay Data Center · Kazteleport · Astana (approximate location)Kazteleport Sandyktau Data Center · Kazteleport · Astana (approximate location)Kazteleport Ustyurt Data Center · Kazteleport · Aktau (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Kazteleport data centers: key facts

About Kazteleport

Kazteleport JSC is a Kazakh telecom, cloud and data centre operator wholly owned by Halyk Bank of Kazakhstan. Its website (October 2026) says its infrastructure consists of five geo-distributed data centres in Almaty and Astana linked by fibre; its two Uptime Tier III sites, Sairam in Almaty and Yereymentau in Astana, have 2MW and 120 or 100 racks each.

Headquarters
Almaty, Kazakhstan
Founded
1999
Ownership
100% Halyk Bank of Kazakhstan
Parent company
Halyk Bank of Kazakhstan
Tracked footprint
13 facilities in 1 country
Website
kazteleport.kz

Data center business

  • Kazteleport says it has more than 25 years in the Kazakh market. It grew out of the DianetLine joint venture in 1994 and was registered as a joint-stock company in November 1999. It started with digital channel leasing, then added SDH and MPLS networks, virtual and cloud infrastructure (2012-2014) and data centres from 2015. Halyk Bank of Kazakhstan holds 100% of the shares.
  • The company timeline lists its data centre launches: Khan-Tengri, Bogety and Karatau in Almaty (2015), Okzhetpes and Burabay in Astana (2016), a third Almaty data centre (2018), Sandyktau in Astana, then Nur-Sultan (2019), the Tier III Sairam data centre in Almaty (2022, design certified Tier III in 2021) and the Tier III Yereymentau data centre in Astana (2024).
  • Sairam, Voikova St. 2A, Almaty, opened in 2022 and is certified Tier III Design and Tier III Facility by the Uptime Institute. It has 2MW of total power, 120 42U racks of up to 7kW, a 270 sqm machine hall, 2N power with two 2,500kVA transformers in its own substation, two diesel generators above 1.5MW each and a design PUE below 1.2.
  • Sairam building 2 on the same Almaty site adds 1MW of power with 440kW of IT load, 30 racks of up to 22kW and a 70 sqm machine hall, sharing the 2,500kVA transformers and diesel generators. Yereymentau, Abay Ave. 47A, Astana, opened in 2024 with 2MW, 100 racks (80 up to 7kW and 20 up to 14kW) and a 366 sqm machine hall; it holds Tier III Design, with Tier III Facility shown as pending.
  • Colocation is sold in the two Tier III sites with a 99.982% SLA; the company says its other data centres meet the Tier II reliability standard. Services hosted in the data centres include IaaS, PaaS, managed Kubernetes, backup and disaster recovery, S3 storage, GPU cloud, DDoS protection, web application firewall and a security operations centre.
  • In 2020 Kazteleport says it became the first provider to deploy Microsoft Azure cloud services in its own data centres in Kazakhstan. In 2022 it registered TELEPORT DC LLP in Uzbekistan. It holds ISO/IEC 27001, ISO/IEC 20000-1, ISO 9001, ISO 14001 and ISO 45001 certificates, PCI DSS and an information security (OCIB) licence.

Recent updates

  • 16 May 2026: Kazteleport's company page lists an information security (OCIB) licence dated 16 May 2026, alongside its PCI DSS certificate and ISO/IEC 27001, 20000-1, 9001, 14001 and 45001 certificates.
  • 7 Apr 2026: deputy chairman Syrym Toleuliev said Kazteleport rents GPUs in its own cloud, with servers hosted in its Kazakh Tier III data centres and hourly or monthly billing, and that it plans cloud tools for AI developers.
  • 27 Mar 2026: Kazteleport launched a locally hosted business cloud on Nextcloud, under a partnership agreement with Nextcloud GmbH, running in its own Tier III data centre infrastructure in Kazakhstan.
  • 19 Jan 2026: chairman of the management board Kuat Kusainbekov said the company runs a network of data centres in Almaty, Astana and Aktau, with Tier III sites certified by the Uptime Institute for design and for the built facility, and that 2026 would focus on measured scaling and adding capacity selectively.

Company details checked against company and official sources, 22 Oct 2026.

  • Its largest operational site is Kazteleport Sairam Data Center in Almaty, Kazakhstan at 2 MW.
  • 3 of 13 facilities have a capacity stated by their source; the totals above count only those.

Facilities

13 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Kazteleport Sairam Data CenterColocation
History
  1. Operational
  2. Operational
Almaty, Kazakhstan Operational 2 MW total 2022 Operator / official
Kazteleport Yereymentau Data CenterColocation
History
  1. Operational
  2. Operational
Astana, Kazakhstan Operational 2 MW total 2024 Operator / official
Kazteleport Sairam Building 2Colocation Almaty, Kazakhstan Operational 0.4 MW IT — Operator / official
Kazteleport Aktau Data CenterColocation Almaty, Kazakhstan Operational — — Trade press
Kazteleport Bogety Data CenterColocation Almaty, Kazakhstan Operational — 2015 Operator / official
Kazteleport Burabay Data CenterColocation Astana, Kazakhstan Operational — 2016 Operator / official
Kazteleport Karatau Data CenterColocation Almaty, Kazakhstan Operational — 2015 Operator / official
Kazteleport Khan-Tengri Data CenterColocation Almaty, Kazakhstan Operational — 2015 Operator / official
Kazteleport Kumbel Data CenterColocation Almaty, Kazakhstan Operational — — Trade press
Kazteleport Okzhetpes Data CenterColocation Astana, Kazakhstan Operational — 2016 Operator / official
Kazteleport Sandyktau Data CenterColocation Astana, Kazakhstan Operational — 2019 Operator / official
Kazteleport Talgar Data CenterColocation Almaty, Kazakhstan Operational — — Trade press
Kazteleport Ustyurt Data CenterColocation Aktau, Kazakhstan Operational — — Trade press

Market position

How Kazteleport compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Kazakhstan, Kazteleport ranks #5 of 13 tracked operators by capacity, with 1.3% of the country’s tracked MW.
  • Kazakhstan has 36 tracked data centers from 13 operators: 33.1 MW operational and 312 MW under construction or planned.
  • Almaty also hosts 7 other tracked data center(s), run by Kazakhtelecom, Beeline Kazakhstan (Hyper Cloud), Transtelecom (TTC) and Akademset (Ahost).

Data center operators in Kazakhstan

Tracked facilities3613 operators
Operational capacity33.1 MW312 MW in the pipeline
Kazteleport rank by capacity#5of 13 operators · 1.3%
Renewable share of generation14.6%2025
OperatorFacilitiesOperational MWPipeline MW
Kazakhtelecom / Transtelecom1—300 MW
Transtelecom (TTC)917 MW—
AKASHI Data Center1—10 MW
Kazakhtelecom27.5 MW—
QazCloud13 MW—
Beeline Kazakhstan (Hyper Cloud)1—2 MW
Akademset (Ahost)10.7 MW—
Internet Company PS (PS Cloud Services)10.5 MW—

All data centers in Kazakhstan Power and policy in Kazakhstan

Other data centers in Almaty

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Kazteleport operate?

DC Market Insights tracks 13 Kazteleport data center(s) in 1 country as of October 2026: 13 operational, 0 under construction and 0 planned.

Where is Kazteleport headquartered?

Kazteleport is headquartered in Almaty, Kazakhstan. Ownership: 100% Halyk Bank of Kazakhstan.

Which other companies operate data centers in Kazakhstan?

Besides Kazteleport, the largest operators we track in Kazakhstan by capacity are Kazakhtelecom / Transtelecom, Transtelecom (TTC), AKASHI Data Center, Kazakhtelecom and QazCloud. The Kazakhstan page lists all 13 operators.

What rules apply to data centers in Kazakhstan?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Kazakhstan, including 0 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Almaty?

Other tracked data centers in Almaty include Kazakhtelecom Modular Data Center Almaty (Kazakhtelecom), Beeline Hyper Cloud Data Center (Alatau SEZ) (Beeline Kazakhstan (Hyper Cloud)), Transtelecom Data Center Almaty (Transtelecom (TTC)) and Ahost Data Center Almaty (Akademset (Ahost)).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst