Every data center in Kazakhstan that we have verified: operator, location, status and capacity, each checked against its source.
By Amit JainReviewed by Deepti AgrawalUpdated 26 Oct 2026
In short
As of 26 October 2026, DC Market Insights tracks 36 data centers in Kazakhstan run by 13 operators: 30 operational, 2 under construction and 4 planned. Stated operational capacity is 33.1 MW, with a further 2 MW under construction and 310 MW planned. Transtelecom (TTC) holds the largest share of tracked operational capacity (51%).
36Facilities tracked
13Operators
33.1 MWOperational (30 sites)
2 MWUnder construction (2 sites)
310 MWPlanned (4 sites)
MW = IT capacity where the source states it, otherwise total capacity. 20 of 36 facilities have a stated capacity; the others are counted as sites only.
OperationalUnder constructionPlannedPin = exact site location; dot = city (approximate)
Market snapshot
Kazakhstan data center market: key facts
Capacity under construction or planned (312 MW) is 9.4 times the operational base of 33.1 MW.
The three largest operators by operational capacity, Transtelecom (TTC), Kazakhtelecom and Kazteleport, hold 87% of tracked operational MW.
Kazakhtelecom / Transtelecom has the largest development pipeline in Kazakhstan: 300 MW under construction or planned.
The largest operational facility we track is Kazakhtelecom Pavlodar Data Center (Kazakhtelecom, Pavlodar) at 4.2 MW.
The largest project in the pipeline is Data Center Valley Ekibastuz by Kazakhtelecom / Transtelecom (300 MW, planned).
Ekibastuz is the largest cluster: 2 of 36 facilities and 87% of tracked capacity.
By type, the tracker lists 31 colocation, 4 enterprise and 1 hyperscale facilities.
20 of 36 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational33.1 MW
Under construction2 MW
Planned310 MW
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Capacity by year opened or expected, MW
OperationalUnder construction or planned Facilities with a stated year and capacity only.
Largest operators in Kazakhstan by tracked capacity, MW
Our Deal Tracker lists 1 deals in Kazakhstan since October 2026, with $31.2M in disclosed value.
Eurasian Development Bank → AKASHI Data Center PLC – Tier IV data center campus, Astana (100 MW planned, ~10 MW first phase 2027) Financing$31.2M · 10 MW
Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
A second analyst re-opens each source before a facility is published.
Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers are there in Kazakhstan?
DC Market Insights tracks 36 data centers in Kazakhstan as of October 2026: 30 operational, 2 under construction and 4 planned, run by 13 operators. The count grows as we verify more sites.
What is the data center capacity of Kazakhstan?
Tracked operational capacity in Kazakhstan is 33.1 MW, with 2 MW under construction and 310 MW planned. These totals use the capacity each source states (IT load where given) and cover 20 of 36 tracked facilities.
Which companies operate the most data center capacity in Kazakhstan?
By tracked operational capacity, the largest operators in Kazakhstan are Transtelecom (TTC) (17 MW), Kazakhtelecom (7.5 MW) and Kazteleport (4.4 MW).
Where are the data centers in Kazakhstan located?
The largest clusters by tracked capacity are Ekibastuz (2 facilities), Astana (8 facilities) and Almaty (15 facilities). The map above shows every site.
Which new data centers are being built in Kazakhstan?
We track 2 MW under construction and 310 MW planned. The largest projects are Data Center Valley Ekibastuz by Kazakhtelecom / Transtelecom (300 MW), AKASHI Data Center 1 (Phase 1) (10 MW) and Beeline Hyper Cloud Data Center (Alatau SEZ) (2 MW).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?