Proprietary data
LINKWISE Data Centers
Data centers operated by LINKWISE that we have verified: location, status and capacity, each checked against its source.
In short
As of 31 October 2026, DC Market Insights tracks 1 data center operated by LINKWISE in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
LINKWISE data centers: key facts
- The largest project in the pipeline is LINKWISE Takhiatash AI Data Center (300 MW, under construction).
LINKWISE development pipeline
Under construction and planned facilities with a stated capacity, largest first. 300 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| LINKWISE Takhiatash AI Data CenterLINKWISE | Takhiatash, Uzbekistan | Under construction | Hyperscale | 300 MW |
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
LINKWISE Takhiatash AI Data CenterHyperscale
History
|
Takhiatash, Uzbekistan | Under construction | 300 MW total | — | Operator / official |
Market position
How LINKWISE compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Uzbekistan, LINKWISE ranks #1 of 8 tracked operators by capacity, with 83% of the country’s tracked MW.
- Uzbekistan has 11 tracked data centers from 8 operators: — operational and 362 MW under construction or planned.
- Industrial electricity in Uzbekistan costs 83.3 USD/MWh (2026, latest official figure).
- Takhiatash also hosts 1 other tracked data center(s), run by Keycore Technology.
Data center operators in Uzbekistan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Muroosystems | 1 | — | 50 MW |
| DataVolt | 1 | — | 12 MW |
| Uztelecom | 4 | — | — |
| East Telecom | 1 | — | — |
| UNICON.UZ | 1 | — | — |
| Ministry of Digital Technologies of Uzbekistan | 1 | — | — |
| Keycore Technology | 1 | — | — |
All data centers in Uzbekistan Power and policy in Uzbekistan
Other data centers in Takhiatash
- KCT Takhiatash AI Data Center · Keycore Technology · Planned
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does LINKWISE operate?
DC Market Insights tracks 1 LINKWISE data center(s) in 1 country as of October 2026: 0 operational, 1 under construction and 0 planned.
Which other companies operate data centers in Uzbekistan?
Besides LINKWISE, the largest operators we track in Uzbekistan by capacity are Muroosystems, DataVolt, Uztelecom, East Telecom and UNICON.UZ. The Uzbekistan page lists all 8 operators.
What rules apply to data centers in Uzbekistan?
Our Power & Policy Tracker lists 11 government actions on data centers and power in Uzbekistan, including 1 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Takhiatash?
Other tracked data centers in Takhiatash include KCT Takhiatash AI Data Center (Keycore Technology).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
