Uztelecom Data Centers
Data centers operated by Uztelecom that we have verified: location, status and capacity, each checked against its source.
In short
As of 13 November 2026, DC Market Insights tracks 6 data centers operated by Uztelecom in 1 country, of which 5 are operational. Stated operational capacity is 3.1 MW, with a further — under construction and 1.8 MW planned. The pipeline is 0.6 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 5 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Uztelecom data centers: key facts
About Uztelecom
Uztelecom (legal name Uzbektelecom JSC) is Uzbekistan's national telecommunications operator and runs the UzCloud sovereign cloud platform. UzCloud states 5 data centers in 4 regions of Uzbekistan (Akhangaran Site-1 and Site-2 in Tashkent region, Zangiata district, Bukhara and Kokand) with 61 modules, 299 IT racks and 5.1 MW of capacity (uzcloud.uz, November 2026). Bukhara and Kokand were commissioned on 22 September 2026. The sites hold Uptime Institute Tier III design (TCDD) certificates; constructed-facility and operations certificates are in progress.
- Headquarters
- Tashkent, Uzbekistan
- Founded
- 2000
- Ownership
- Joint-stock company with predominant state ownership; the Ministry of Finance of Uzbekistan is the key shareholder
- Tracked footprint
- 6 facilities in 1 country
- Website
- uztelecom.uz
Data center business
- UzCloud, the cloud brand of Uzbektelecom JSC, hosts government, enterprise and commercial information systems across 5 data centers in 4 regions of Uzbekistan. It reports 61 modules, 299 IT racks and 5.1 MW of capacity, more than 34,000 CPU cores, over 650 TB of RAM, over 36 PB of stored data and 40 GPU servers for HPC and AI workloads, monitored 24×7.
- Site figures stated by UzCloud: Akhangaran Site-1 (Tashkent region) 37 IT racks, 0.5 MW; Akhangaran Site-2 70 IT racks, 1 MW; Tashkent data center in Zangiata district 96 IT racks, 1.8 MW, 20 GPU servers; Bukhara 48 IT racks, 0.8 MW, 7 GPU servers; Kokand 48 IT racks, 0.8 MW, 7 GPU servers. The MW basis (IT or total) is not stated.
- The UzCloud sites are designed to Tier III requirements with a 99.982% SLA. Tier III Design Documents (TCDD) certificates have been obtained from the Uptime Institute; Constructed Facility (TCCF) and Operational Sustainability (TCOS) certificates are in progress. Sites have two independent power feeds, N+1 power and cooling, and diesel generators with fuel for up to 72 hours.
- UzCloud colocation offers 47U racks rated at 8 kW and Tier III 50U racks rated at 10 kW, with N+1 cooling, N+1 plus 2N power, on-site diesel generators, DCIM monitoring, gas fire suppression and connections of up to 100 Gbps. The platform also sells IaaS, S3 object storage, managed Kubernetes and GPU-as-a-Service on NVIDIA A40.
- Uztelecom built its first data processing and storage center in Tashkent under Presidential Resolution PP-1989 of 27 June 2015 on the National Information and Communication System. The company describes its reliability as Tier III under the Uptime Institute classification (N+1 redundancy, 99.982% availability) and sells cloud, colocation, VDI and VPS services from it.
- Uzbektelecom's 2025 sustainability report says projects financed by JBIC and MUFG under government guarantees aim to build telecom infrastructure for data centers with a total capacity of at least 100 PB; USD 24.67 million was used under these projects in 2025. The company's main data center facility used 2,806,019 kWh of electricity in 2025, up about 6% on 2024, and has free-cooling air handling units.
- UzCloud calls itself Uzbekistan's first sovereign cloud provider: data is stored in-country, contracts are signed with an Uzbek legal entity and billed in UZS. It reports more than 2,000 clients, a 40 Gbps TAS-IX connection and over 300 km of geographic separation between its five data centers.
Company
- Uzbektelecom JSC was set up as a joint-stock company under Presidential Decree UP-2647 of 28 June 2000 and Cabinet of Ministers Decree No. 253 of 30 June 2000, on the basis of the joint-stock companies Mahalliy Telekom and Xalqaro Telekom.
- The 2025 sustainability report states that Uzbektelecom is a joint-stock company with predominant state ownership. In 2025 the state's ownership interest in the charter capital was reduced by 25%; most shares remain with the Ministry of Finance of Uzbekistan as key shareholder. The company had 9.5 million mobile and 2.6 million broadband subscribers in 2025.
Recent updates
- Fitch Ratings upgraded Uzbektelecom JSC's Standalone Credit Profile from bb- to bb and affirmed its Long-Term Issuer Default Rating at BB with a Positive Outlook.
- Uztelecom said its next data center, in Zangiata district of Tashkent region, holds an Uptime Institute Tier III project certificate and is due to be commissioned in autumn 2026 as the fifth site of its network. With Toyota Tsusho, NTT Docomo Business and NEC it is piloting an APN photonic network, first linking the Akhangaran and Zangiata data centers at a target 800 Gbps.
- Uztelecom commissioned two new data centers in Bukhara and Kokand, opened by the Minister of Digital Technologies and the Ambassador of Japan at ICT Week Uzbekistan 2026. The sites, more than 300 km from Tashkent, run within the UzCloud national cloud platform and have dedicated GPU servers for AI workloads. Ministry of Digital Technologies of Uzbekistan
- Uztelecom presented UzCloud as a sovereign cloud whose data centers were designed to Tier III (Design, Facility and Operations) standards, said it had applied for the certificates, and planned phased commissioning of the sites from the second quarter of 2026.
Company details checked against company and official sources, 13 Nov 2026.
- Capacity under construction or planned (1.8 MW) is 0.6 times the operational base of 3.1 MW.
- Its largest operational site is Uztelecom (UzCloud) Akhangaran Site-2 in Akhangaran, Uzbekistan at 1 MW.
- The largest project in the pipeline is Uztelecom Zangiata Data Center (1.8 MW, planned).
- 5 of 6 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Uztelecom development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 1.8 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Uztelecom Zangiata Data CenterUztelecom | Zangiata, Uzbekistan | Planned | Colocation | 1.8 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Uztelecom Zangiata Data CenterColocation
History
|
Zangiata, Uzbekistan | Planned | 1.8 MW | — | Operator / official |
| Uztelecom (UzCloud) Akhangaran Site-2Colocation | Akhangaran, Uzbekistan | Operational | 1 MW | — | Operator / official |
| Uztelecom Bukhara Data CenterColocation | Bukhara, Uzbekistan | Operational | 0.8 MW | 2026 | Operator / official |
| Uztelecom Kokand Data CenterColocation | Kokand, Uzbekistan | Operational | 0.8 MW | 2026 | Operator / official |
| Uztelecom (UzCloud) Akhangaran Site-1Colocation | Akhangaran, Uzbekistan | Operational | 0.5 MW | — | Operator / official |
| Uztelecom Tashkent Data CenterColocation | Tashkent, Uzbekistan | Operational | — | — | Operator / official |
Market position
How Uztelecom compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Uzbekistan, Uztelecom ranks #4 of 8 tracked operators by capacity, with 1.3% of the country’s tracked MW.
- Uzbekistan has 13 tracked data centers from 8 operators: 3.1 MW operational and 364 MW under construction or planned.
- Industrial electricity in Uzbekistan costs 83.3 USD/MWh (2026, latest official figure).
Data center operators in Uzbekistan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| LINKWISE | 1 | — | 300 MW |
| Muroosystems | 1 | — | 50 MW |
| DataVolt | 1 | — | 12 MW |
| Keycore Technology | 1 | — | — |
| East Telecom | 1 | — | — |
| UNICON.UZ | 1 | — | — |
| Ministry of Digital Technologies of Uzbekistan | 1 | — | — |
All data centers in Uzbekistan Power and policy in Uzbekistan
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Uztelecom operate?
DC Market Insights tracks 6 Uztelecom data center(s) in 1 country as of November 2026: 5 operational, 0 under construction and 1 planned.
Where is Uztelecom headquartered?
Uztelecom is headquartered in Tashkent, Uzbekistan. Ownership: Joint-stock company with predominant state ownership; the Ministry of Finance of Uzbekistan is the key shareholder.
Which other companies operate data centers in Uzbekistan?
Besides Uztelecom, the largest operators we track in Uzbekistan by capacity are LINKWISE, Muroosystems, DataVolt, Keycore Technology and East Telecom. The Uzbekistan page lists all 8 operators.
What rules apply to data centers in Uzbekistan?
Our Power & Policy Tracker lists 11 government actions on data centers and power in Uzbekistan, including 1 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.