Proprietary data
LuxConnect Data Centers
Data centers operated by LuxConnect that we have verified: location, status and capacity, each checked against its source.
In short
As of 29 October 2026, DC Market Insights tracks 4 data centers operated by LuxConnect in 1 country, of which 4 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 4 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
LuxConnect data centers: key facts
About LuxConnect
LuxConnect is a Luxembourg data center and dark fiber operator wholly owned by the Luxembourg State. It runs four multi-tier data centers (Tier II to Tier IV) on two sites, Bettembourg and Bissen, with 15,000 m² of server space that it owns outright, and a national optical fiber network of about 2,000 km with 16 country breakouts. It calls itself the largest operator of data center infrastructure in Luxembourg. 2025 revenue was EUR 42.5 million.
- Headquarters
- Bettembourg, Luxembourg
- Founded
- 2006
- Ownership
- Private company with the Luxembourg State as its sole shareholder
- Parent company
- Luxembourg State
- Tracked footprint
- 4 facilities in 1 country
- Website
- luxconnect.lu
Data center business
- Build history: DC 1.1 in Bettembourg opened in 2009 after the first stone was laid in 2008; DC 1.2 followed in 2011 and became the campus entrance from 2016; DC 2 in Bissen opened in 2012 to give geographic redundancy; DC 1.3 was launched in 2013 and inaugurated in 2016, with only part of it activated at first.
- LuxConnect operates four data centers on two sites: DC 1.1, DC 1.2 and DC 1.3 at 202 Z.A.E. Wolser F, Bettembourg, and DC 2 at 3 op der Poukewiss, ZAC Klengbousbierg, Bissen. Net server space is 3,100 m² (DC 1.1), 1,300 m² (DC 1.2), 5,500 m² (DC 1.3) and 4,800 m² (DC 2). Stated grid power is 2 x 6.3 MVA for DC 1.1 and DC 1.2, 2 x 10.0 MVA for DC 1.3 and 2 x 12.6 MVA for DC 2; the company publishes no IT load in MW.
- The data centers are carrier-neutral and multi-tenant, with 2N redundant cooling, 2 x (N+1) UPS systems, independent and redundant grid connections and diesel generators with 48 hours of autonomy at full IT load. The company states an average PUE of 1.35 and sources 100% renewable energy (Norwegian hydroelectricity, with yearly green certificates from Enovos).
- The company says its data centers are Uptime Tier IV certified. It holds ISO 27001 (since December 2019), ISO 22301 (since 2024) and HDS health data hosting certification, and is a participant in the EU Code of Conduct on Data Centre Energy Efficiency and a member of the Climate Neutral Data Centre Pact.
- Subsidiaries and joint ventures: LuxProvide (100%) operates the MeluXina supercomputer, installed in DC 2 in Bissen; Clarence, a sovereign disconnected cloud hosted in LuxConnect data centers, is owned 60% by LuxConnect and 40% by Proximus; DataCenterEnergie is a 50/50 joint venture with LuxEnergie that maintains electrical and HVAC equipment.
- Besides hosting, LuxConnect runs a dark fiber business: more than 1,900 km of documented optical fiber in Luxembourg and 16 breakouts that connect operators to the Grand Duchy. The company states it has 31 employees.
Recent updates
- 16 Oct 2026: LuxConnect marked its 20th anniversary. Projects under way or planned include a new administrative building and multi-level car park in Bettembourg, work on the control center for the EU IRIS² secure connectivity program, and a waste-heat recovery project at Bettembourg to supply a new residential district behind the site.
- 15 Sep 2026: LuxConnect published its 2025-2026 CSR report, covering a third full scope 1-3 carbon footprint, renewed ISO 27001 and ISO 22301 certifications and an INDR CSR label audit.
- 10 Jun 2026: LuxConnect reported a 2025 net result of EUR 9.8 million (up 12.6%) on stable revenue of EUR 42.5 million. 2025 investments included work at the Bissen data center to host the AI Factory (next-generation MeluXina supercomputer), preparation for IRIS², replacement of end-of-life UPS systems and rooftop solar panels on DC 1.3 and DC 2.
- 25 Mar 2026: LuxConnect completed an installation in DC 1.3 (new transformer, heat and cold exchangers and piping) that will heat, cool and power its future office building with energy recovered from the data center.
- 25 Feb 2026: the foundation stone was laid for the new administrative headquarters in Bettembourg, about 5,000 m² gross, due for provisional completion at the end of 2027; a 225-space car park is to start in 2026.
Company details checked against company and official sources, 10 Nov 2026.
- 0 of 4 facilities have a capacity stated by their source; the totals above count only those.
Facilities
4 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
DC 1.1Colocation
History
|
Bettembourg, Luxembourg | Operational | — | 2009 | Operator / official |
DC 1.2Colocation
History
|
Bettembourg, Luxembourg | Operational | — | 2011 | Operator / official |
DC 1.3Colocation
History
|
Bettembourg, Luxembourg | Operational | — | 2013 | Operator / official |
DC 2Colocation
History
|
Bissen, Luxembourg | Operational | — | 2012 | Operator / official |
Market position
How LuxConnect compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Luxembourg, LuxConnect is one of 3 operators we track.
- Luxembourg has 8 tracked data centers from 3 operators: — operational and — under construction or planned.
- Industrial electricity in Luxembourg costs 165 USD/MWh (2025, latest official figure).
Data center operators in Luxembourg
All data centers in Luxembourg Power and policy in Luxembourg
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does LuxConnect operate?
DC Market Insights tracks 4 LuxConnect data center(s) in 1 country as of October 2026: 4 operational, 0 under construction and 0 planned.
Where is LuxConnect headquartered?
LuxConnect is headquartered in Bettembourg, Luxembourg. Ownership: Private company with the Luxembourg State as its sole shareholder.
Which other companies operate data centers in Luxembourg?
Besides LuxConnect, the largest operators we track in Luxembourg by capacity are DEEP and Google. The Luxembourg page lists all 3 operators.
What rules apply to data centers in Luxembourg?
Our Power & Policy Tracker lists 8 government actions on data centers and power in Luxembourg, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.