As of 29 October 2026, DC Market Insights tracks 8 data centers in Luxembourg run by 3 operators: 7 operational, 0 under construction and 1 planned.

8Facilities tracked
3Operators
—Operational (7 sites)
—Under construction (0 sites)
—Planned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 8 facilities have a stated capacity; the others are counted as sites only.

DC 1.1 · LuxConnect · Bettembourg (approximate location)DC 1.2 · LuxConnect · Bettembourg (approximate location)DC 1.3 · LuxConnect · Bettembourg (approximate location)Resilience Centre West (RCW) · DEEP · Windhof (approximate location)Resilience Centre South (RCS) · DEEP · Kayl (approximate location)Resilience Centre East (RCE) · DEEP · Betzdorf (approximate location)Google Bissen · Google · Bissen (approximate location) · Owned (self-build): land of more than 30 hectares bought by Google in the centre of the country (Bissen)DC 2 · LuxConnect · Bissen (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Luxembourg data center market: key facts

  • By type, the tracker lists 7 colocation and 1 hyperscale facilities.
  • 0 of 8 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Colocation7
Hyperscale1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Luxembourg data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 18 October 2026. Government sources are linked; the full source list comes with the Excel data.

Luxembourg is a small, highly interconnected data centre hub where LuxConnect data centres in Bissen and Bettembourg host the MeluXina and MeluXina-AI supercomputers. Power for large users became much cheaper in 2026: a EUR 150m state contribution and ILR-approved Creos tariffs cut high-voltage network charges by up to about 90%, and very-high-consumption industry pays 0.1 EUR/MWh electricity excise. New data centres connect only where the grid operator confirms capacity. ILR tariff report 2026

Policy and incentives

The Data Strategy (Accelerating Digital Sovereignty 2030, presented 19 May 2025) sets 33 actions to 2030, including a significant expansion of cloud services, data centres and computing power and sovereign and hybrid cloud. Ministry for Digitalisation

EuroHPC selected Luxembourg on 10 Dec 2024 to host MeluXina-AI and an AI Factory: estimated EUR 112m, of which EUR 60m from the state, operated by LuxProvide in LuxConnect data centres in Bissen and Bettembourg. gouvernement.lu

Electricity excise is 1 EUR/MWh up to 25 MWh, 0.5 EUR/MWh above 25 MWh and 0.1 EUR/MWh for very-high-consumption industry; electricity VAT is the reduced 8% rate. Chambre des Députés QP 3631

Power and grid

Bill 8596 (voted 18 Dec 2025) lets the state pay EUR 150m of 2026 network costs: EUR 71m at 220 kV, EUR 41.5m at 65-110 kV and EUR 37.5m at 20 kV. Chambre des Députés, bill 8596

ILR decision E25/42 (22 Dec 2025) approved Creos 2026 network tariffs from 1 Jan 2026; tariff revenue falls 40.2% overall and 90.2% at 220 kV. A 65 kV industrial user of 5 MW and 20 GWh a year pays an estimated 5.34 EUR/MWh in network fees in 2026, against 26.75 in 2025. ILR tariff report 2026

Data centres may connect only where sufficient network capacity exists; the grid operator checks availability and authorises the connection (government answer to QP 3164). Chambre des Députés QP 3164

Sustainability, water and climate

No energy-mix requirement applies to electricity bought by data centres; the PNEC targets 39% renewable electricity produced in Luxembourg by 2030. The planned Bissen data centre operator committed to 100% renewable purchasing, net zero by 2030 and a PUE of 1.3 or lower. Chambre des Députés QP 3803

Luxembourg had not yet transposed EED 2023/1791 (deadline 11 Oct 2025) in Dec 2025; the bill was in final drafting and data centre reporting will use the EU database, not a national one. Chambre des Députés QP 3164

Renewables supplied 23.3% of electricity in 2025 (provisional, Eurostat SHARES), up from 20.5% in 2024. Eurostat

Operators in Luxembourg

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
LuxConnect4———
DEEP3———
Google1———

How Luxembourg compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom219541,152 MW8,035 MW
Germany18856933 MW4,386 MW
France5510322 MW1,413 MW
Sweden4117172 MW1,510 MW
Finland3616230 MW1,430 MW
Ireland391553 MW1,278 MW
Russia11121516 MW425 MW
Denmark301454.6 MW844 MW
Italy107170 MW693 MW
Netherlands10833217 MW414 MW
Norway22—350 MW
Spain211279.4 MW175 MW

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DC 1.1LuxConnect
History
  1. Operational
  2. Operational
Bettembourg Operational — 2009 Operator / official
DC 1.2LuxConnect
History
  1. Operational
  2. Operational
Bettembourg Operational — 2011 Operator / official
DC 1.3LuxConnect
History
  1. Operational
  2. Operational
  3. Operational
  4. Operational
  5. Operational
Bettembourg Operational — 2013 Operator / official
DC 2LuxConnect
History
  1. Operational
  2. Operational
  3. Operational
Bissen Operational — 2012 Operator / official
Google BissenGoogle Owned (self-build): land of more than 30 hectares bought by Google in the centre of the country (Bissen)
History
  1. Planned
  2. Planned
  3. Planned
  4. Planned
  5. Planned
  6. Planned
Bissen Planned — — Operator / official
Resilience Centre East (RCE)DEEP Betzdorf Operational — — Operator / official
Resilience Centre South (RCS)DEEP Kayl Operational — — Operator / official
Resilience Centre West (RCW)DEEP Windhof Operational — — Operator / official

Get the data

Every data center in Luxembourg, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,648 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Luxembourg

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Luxembourg

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Luxembourg?

DC Market Insights tracks 8 data centers in Luxembourg as of October 2026: 7 operational, 0 under construction and 1 planned, run by 3 operators. The count grows as we verify more sites.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy