In short
As of 13 October 2026, DC Market Insights tracks 6 government actions on data centers and power in Colombia, 6 of them in force. We have found no moratorium or restriction on new data centers in force in Colombia. 2 incentive schemes apply, including Decree 2147 of 2016: special permanent free trade zones (ZFPE) for services projects – investment and job thresholds.
Market snapshot
Colombia power and policy: key facts
- Grid emission factor: 0.22 kgCO2/kWh (2024). Rank 11 of 17 tracked countries, highest first.
- Latest change: UPME Resolution 085 of 2026: SIN grid emission factor for 2024 (Unidad de Planeación Minero Energética (UPME), 23 Feb 2026).
- By type: 2 incentive, 1 efficiency rule, 1 plan or strategy and 1 grid access.
Power indicators for Colombia
Latest official figure for each indicator, with earlier years where we have them.
In force now in Colombia
Grid access (1)
CREG Resolution 101 070 of 2025: non-regulated users' connection assets may connect generation and demand to the SIN
CREG replaced and widened the rules on the use of connection assets owned by non-regulated users (Usuarios No Regulados), so that these assets can be used to connect both generation and demand to the National Interconnected System (SIN). It creates embedded commercial borders (fronteras embebidas) behind a main border, lets the asset owner charge others for using connection assets to the STN, STR or SDL, and repeals CREG 122 of 2003 and CREG 084 of 2004. Relevant for large consumers such as data center campuses sharing a substation or connection line.
Incentive (2)
Decree 2147 of 2016: special permanent free trade zones (ZFPE) for services projects – investment and job thresholds
Colombia's free trade zone regime (Decree 2147 of 2016) lets a single company be declared a special permanent free trade zone (zona franca permanente especial). Projects exclusively of services must, within three years of the declaration, reach one of three thresholds: investment above 10,000 and up to 46,000 monthly minimum wages (smmlv) with 500+ new direct formal jobs; above 46,000 and up to 92,000 smmlv with 350+ jobs; or above 92,000 smmlv with 150+ jobs. Goods projects need 150,000+ smmlv and 150 jobs.
Law 1715 of 2014 (as amended by Law 2099 of 2021): tax incentives for non-conventional renewable energy and efficient energy management
Taxpayers who invest directly in non-conventional renewable energy (FNCE) generation or in efficient energy management may deduct 50% of the investment from taxable income over up to 15 years (Art. 11, amended by Law 2099 of 2021); equipment and services for such projects listed under the PROURE programme are excluded from VAT (Art. 12); and the activities may use accelerated depreciation (Art. 14). Investments must be certified by UPME. Applies to data center operators that build on-site or dedicated renewable generation or efficiency projects.
50 % Income tax deduction of 50% of the investment, spread over no more than 15 years.
Efficiency rule (1)
UPME Resolution 085 of 2026: SIN grid emission factor for 2024
UPME updated the greenhouse gas emission factor of the National Interconnected System (SIN) for 2024. The factor for GHG inventories (used for Scope 2 reporting of grid electricity, including data centers) is 0.220 tCO2eq/MWh. Separate factors are set for mitigation/CDM projects: 0.660 for wind and solar, 0.607 (first crediting period) and 0.554 (second and third periods) for other projects.
0.22 tCO2eq/MWh Inventory factor for 2024.
Regulation (1)
Statutory Law 1581 of 2012: personal data protection and restriction on transfers to countries without adequate protection
Colombia's general data protection law bans transfers of personal data of any kind to countries that do not provide adequate levels of data protection (Art. 26), with listed exceptions. The Superintendence of Industry and Commerce (SIC) supervises compliance. The rule shapes where operators and cloud providers host Colombian personal data and supports local data center demand.
Plan or strategy (1)
CONPES 4144 of 2025: National Artificial Intelligence Policy – strengthening technological and computing infrastructure
The National Economic and Social Policy Council approved Colombia's National AI Policy on 14 February 2025, with 106 actions to 2030 and a budget of about COP 479,273 million. Action line 2.2 aims to strengthen technological infrastructure and the computing ecosystem for AI, after noting that earlier cloud rules (Presidential Directive 03 of 2021, Decree 1263 of 2022) did not address the state's computing capacity.
Timeline of data center and power policy in Colombia
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 23 Feb 2026 | UPME Resolution 085 of 2026: SIN grid emission factor for 2024 | Efficiency rule | In force | Unidad de Planeación Minero Energética (UPME) |
| 14 Feb 2025 | CONPES 4144 of 2025: National Artificial Intelligence Policy – strengthening technological and computing infrastructure | Plan or strategy | In force | Consejo Nacional de Política Económica y Social (CONPES) / Departamento Nacional de Planeación (DNP) |
| 6 Feb 2025 | CREG Resolution 101 070 of 2025: non-regulated users' connection assets may connect generation and demand to the SIN | Grid access | In force | Comisión de Regulación de Energía y Gas (CREG) |
| 23 Dec 2016 | Decree 2147 of 2016: special permanent free trade zones (ZFPE) for services projects – investment and job thresholds | Incentive | In force | Ministerio de Comercio, Industria y Turismo (MinCIT) |
| 13 May 2014 | Law 1715 of 2014 (as amended by Law 2099 of 2021): tax incentives for non-conventional renewable energy and efficient energy management | Incentive | In force | Congress of Colombia (Ministerio de Minas y Energía / UPME certification) |
| 17 Oct 2012 | Statutory Law 1581 of 2012: personal data protection and restriction on transfers to countries without adequate protection | Regulation | In force | Congress of Colombia; supervised by Superintendencia de Industria y Comercio (SIC) |
How Colombia compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Australia | — | 39% (2025) | — | 0 | 2 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 0 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 0 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
Questions
Is there a data center moratorium in Colombia?
We have found no moratorium or restriction on new data centers in force in Colombia as of 13 October 2026. Proposed or announced measures, if any, are listed in the timeline.
What incentives does Colombia offer data centers?
In force: Decree 2147 of 2016: special permanent free trade zones (ZFPE) for services projects – investment and job thresholds and Law 1715 of 2014 (as amended by Law 2099 of 2021): tax incentives for non-conventional renewable energy and efficient energy management. Each is listed with its authority and dates on this page.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.