In short

As of 10 October 2026, DC Market Insights tracks 8 data centers operated by Global Switch in 4 countries, of which 7 are operational. Stated operational capacity is 22 MW, with a further — under construction and 40 MW planned. The pipeline is 1.8 times the capacity already operating.

8Facilities tracked
4Countries
22 MWOperational (7 sites)
—Under construction (0 sites)
40 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 8 facilities have a stated capacity; the others are counted as sites only.

Global Switch Singapore Tai Seng · Global Switch · Singapore (approximate location)Global Switch Singapore Woodlands · Global Switch · Singapore (approximate location)Global Switch London East · Global Switch · London (approximate location)Global Switch London North · Global Switch · London (approximate location)Global Switch London South · Global Switch · London (approximate location)Frankfurt North · Global Switch · Frankfurt am Main (approximate location)Frankfurt South · Global Switch · Frankfurt am Main (approximate location)Global Switch Amsterdam · Global Switch · Amsterdam (approximate location)
Operational Under construction Planned Select a country on the map to open its page.

Market snapshot

Global Switch data centers: key facts

About Global Switch

Global Switch is an owner, operator and developer of large-scale, network-dense, carrier- and cloud-neutral data centres, with operations in Amsterdam, Frankfurt, London, Madrid and Paris in Europe and in Hong Kong and Singapore in Asia-Pacific. Its annual report for 2025 states 252MW of saleable capacity.

Founded
2001
Ownership
Controlled by Shagang Group (51.8% indirect stake)
Parent company
Shagang Group
Tracked footprint
8 facilities in 4 countries
Website
globalswitch.com

Company details checked against company and official sources, 10 Oct 2026.

  • Capacity under construction or planned (40 MW) is 1.8 times the operational base of 22 MW.
  • Its largest operational site is Frankfurt North in Frankfurt am Main, Germany at 12 MW.
  • The largest project in the pipeline is Global Switch London South (40 MW, planned).
  • United Kingdom accounts for 65% of tracked capacity (3 facilities).
  • 3 of 8 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational22 MW
Planned40 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Germany22 MW

OperationalUnder construction or planned

Global Switch development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 40 MW planned in total.

ProjectLocationStatusTypeCapacity
Global Switch London SouthGlobal Switch London, United Kingdom Planned Colocation 40 MW

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Global Switch London SouthColocation London, United Kingdom Planned 40 MW IT — Operator / official
Frankfurt NorthColocation Frankfurt am Main, Germany Operational 12 MW total — Operator / official
Frankfurt SouthColocation Frankfurt am Main, Germany Operational 10 MW total — Operator / official
Global Switch AmsterdamColocation Amsterdam, Netherlands Operational — — Operator / official
Global Switch London EastColocation London, United Kingdom Operational — — Operator / official
Global Switch London NorthColocation London, United Kingdom Operational — — Operator / official
Global Switch Singapore Tai SengColocation Singapore, Singapore Operational — — Operator / official
Global Switch Singapore WoodlandsColocation Singapore, Singapore Operational — — Operator / official

Market position

How Global Switch compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Global Switch ranks #24 of 45 tracked operators by capacity, with 0.6% of the country’s tracked MW.
  • United Kingdom has 177 tracked data centers from 45 operators: 748 MW operational and 6,405 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • In Germany, Global Switch ranks #25 of 53 tracked operators by capacity, with 0.4% of the country’s tracked MW.
  • In Singapore, Global Switch is one of 19 operators we track.
  • London also hosts 10 other tracked data center(s), run by Ada Infrastructure, Pure DC, Pure DC / SEGRO JV and Telehouse.

Data center operators in United Kingdom

Tracked facilities17745 operators
Operational capacity748 MW6,405 MW in the pipeline
Global Switch rank by capacity#24of 45 operators · 0.6%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Humber Tech Park1—386 MW
Equinix15—250 MW
Virtus Data Centres1196.9 MW145 MW
Ada Infrastructure1—210 MW

All data centers in United Kingdom Power and policy in United Kingdom

Data center operators in Germany

Tracked facilities17553 operators
Operational capacity845 MW4,436 MW in the pipeline
Global Switch rank by capacity#25of 53 operators · 0.4%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
CloudHQ2112 MW276 MW
Virtus Data Centres2—358 MW
Amazon Web Services2—300 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Data center operators in Singapore

Tracked facilities4819 operators
Operational capacity288 MW235 MW in the pipeline
Global Switch rank by capacity#13of 19 operators
Industrial power price189 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
AirTrunk278 MW70 MW
ST Telemedia Global Data Centres6112 MW—
Keppel11—75 MW
Nxera358 MW—
Digital Realty4—50 MW
Equinix6—20 MW
DayOne1—20 MW
Racks Central112 MW—

All data centers in Singapore Power and policy in Singapore

Other data centers in London

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: the source’s address where given, otherwise the city centre (approximate).
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Global Switch operate?

DC Market Insights tracks 8 Global Switch data center(s) in 4 countries as of October 2026: 7 operational, 0 under construction and 1 planned.

Which other companies operate data centers in United Kingdom?

Besides Global Switch, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Humber Tech Park. The United Kingdom page lists all 45 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in London?

Other tracked data centers in London include Docklands Campus (Ada Infrastructure), Pure DC London Brent Cross (LON01) Building 2 (Pure DC), Pure DC London Park Royal (LON02) (Pure DC / SEGRO JV) and Pure DC London Brent Cross (LON01) Building 1 (Pure DC).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst