Aurum Equity Partners Data Centers

Data centers operated by Aurum Equity Partners that we have verified: location, status and capacity, each checked against its source.

In short

As of 6 November 2026, DC Market Insights tracks 1 data center operated by Aurum Equity Partners in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
50 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Latam Data Centers Next AI Guatemala · Aurum Equity Partners · Guatemala City (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Aurum Equity Partners data centers: key facts

  • The largest project in the pipeline is Latam Data Centers Next AI Guatemala by Aurum Equity Partners (50 MW, planned).

Aurum Equity Partners development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 50 MW planned in total.

ProjectLocationStatusTypeCapacity
Latam Data Centers Next AI GuatemalaAurum Equity Partners Guatemala City, Guatemala Planned Hyperscale 50 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Latam Data Centers Next AI GuatemalaHyperscale
History
  1. Announced
  2. Planned
  3. Planned
Guatemala City, Guatemala Planned 50 MW — Trade press

Market position

How Aurum Equity Partners compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Guatemala, Aurum Equity Partners ranks #1 of 8 tracked operators by capacity, with 91% of the country’s tracked MW.
  • Guatemala has 10 tracked data centers from 8 operators: 2.9 MW operational and 52 MW under construction or planned.
  • Industrial electricity in Guatemala costs 84.5 USD/MWh (2025, latest official figure).
  • Guatemala City also hosts 3 other tracked data center(s), run by Back Office Smart Solution (BOSS), GBM and Loqui.

Data center operators in Guatemala

Tracked facilities108 operators
Operational capacity2.9 MW52 MW in the pipeline
Aurum Equity Partners rank by capacity#1of 8 operators · 91%
Industrial power price84.5 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
IFX Networks12.5 MW—
KIO Networks20.4 MW2 MW
Back Office Smart Solution (BOSS)2——
Claro1——
Tigo1——
GBM1——
Loqui1——

All data centers in Guatemala Power and policy in Guatemala

Other data centers in Guatemala City

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Aurum Equity Partners operate?

DC Market Insights tracks 1 Aurum Equity Partners data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Guatemala?

Besides Aurum Equity Partners, the largest operators we track in Guatemala by capacity are IFX Networks, KIO Networks, Back Office Smart Solution (BOSS), Claro and Tigo. The Guatemala page lists all 8 operators.

What rules apply to data centers in Guatemala?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Guatemala, including 0 restriction(s) and 2 incentive scheme(s) in force.

Which other data centers are in Guatemala City?

Other tracked data centers in Guatemala City include BOSS GTGU01 (Back Office Smart Solution (BOSS)), GBM Data Center Zona Pradera (GBM) and Loqui Edge Data Center (Loqui).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst