In short

As of 6 November 2026, DC Market Insights tracks 19 data centers operated by KIO Networks in 5 countries, of which 15 are operational. Stated operational capacity is 19.4 MW, with a further 6 MW under construction and 100 MW planned. The pipeline is 5.5 times the capacity already operating.

19Facilities tracked
5Countries
19.4 MWOperational (15 sites)
6 MWUnder construction (2 sites)
100 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 6 of 19 facilities have a stated capacity; the others are counted as sites only.

GTM 1 · KIO Networks · Mixco (approximate location)GTM 2 · KIO Networks · Mixco (approximate location)SDO 1 · KIO Networks · Santo Domingo (approximate location)BOG 1 · KIO Networks · Bogotá (approximate location)KIO QRO3 · KIO Networks · El Marqués (approximate location)KIO MEX8 · KIO Networks · Mexico City (approximate location)KIO MTY2 · KIO Networks · Pesquería (approximate location)PAN 1 · KIO Networks · Arraiján (exact location)KIO QRO1 · KIO Networks · El Marqués (exact location)KIO QRO2 · KIO Networks · El Marqués (exact location)KIO MEX1 · KIO Networks · Mexico City (exact location)KIO MEX2 · KIO Networks · Mexico City (exact location)KIO MEX3 · KIO Networks · Mexico City (exact location)KIO MEX4 · KIO Networks · Huixquilucan (exact location)KIO MEX5 · KIO Networks · Tultitlán (exact location)KIO MEX6 · KIO Networks · Lerma (exact location)KIO MTY1 · KIO Networks · San Pedro Garza García (exact location)KIO HER1 · KIO Networks · Hermosillo (exact location)KIO MER1 · KIO Networks · Mérida (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

KIO Networks data centers: key facts

About KIO Networks

KIO Networks runs its data center business as KIO Data Centers, a Mexican carrier-neutral colocation and interconnection operator with more than 15 facilities in Mexico, Colombia, Guatemala, Panama and the Dominican Republic (KIO, 2026). Its largest hub is the Querétaro campus, where QRO1 and QRO2 together hold 19 MW of IT capacity; MEX8 in Mexico City and GTM2 in Guatemala are being added, and a 100 MW QRO3 is under evaluation.

Headquarters
Mexico
Ownership
Private; I Squared Capital has been a shareholder since 2022
Tracked footprint
19 facilities in 5 countries
Website
kiodatacenters.com

Data center business

  • KIO says more than 90% of its energy comes from renewable sources and that it offers colocation and interconnection with the leading cloud providers.
  • Querétaro is the main campus. KIO says it has operated in Mexico since 2002 and in Querétaro since 2007; with QRO2 the campus reached 19 MW of IT capacity, 12 MW in QRO2 added to 7 MW in QRO1.
  • KIO lists more than 15 carrier-neutral facilities in five countries: Mexico, Colombia, Guatemala, Panama and the Dominican Republic. In Mexico it runs MEX1-MEX6 in and around Mexico City (Santa Fe, Interlomas, Tultitlán, Lerma), QRO1 and QRO2 in Querétaro, MTY1 in Monterrey, HER1 in Hermosillo and MER1 in Mérida; abroad it runs BOG1, GTM1, PAN1 and SDO1.
  • QRO2 is a two-level Tier III building with 3,120 m² of data halls built in three phases. Its 12 MW IT load is split into five 2 MW blocks plus two redundant blocks, and it can grow to 18 MW, with a design PUE of 1.5.
  • In the Mexico City area, MEX5 in Tultitlán is the largest site, with 8,000 m² of white floor across eight data halls and two independent 7.5 MVA feeds for critical load. MEX2 in Santa Fe is built to a Tier IV design, and MEX4 in Interlomas has 3,450 m² of white floor and connects to DE-CIX and Megaport.
  • HER1 in Hermosillo and MER1 in Mérida are compact modular sites built from KIO's ATOM rooms, with 73 m² and 89 m² of technical space respectively, for edge and regional workloads.

Recent updates

  • 14 Aug 2026: KIO said it has invested more than US$900 million in Mexico and Latin America since I Squared Capital became a shareholder in 2022, completed phases two and three of QRO2 (US$170 million in total), and will invest more than US$200 million in 2026 in new projects in Mexico City, Monterrey and Querétaro.
  • 14 Aug 2026: KIO is evaluating up to US$1.3 billion through 2030 for QRO3 in Querétaro, about 100 MW, which would be its largest data center.
  • 9 Mar 2026: KIO announced construction of MEX8 in Mexico City, a US$70 million project adding 4 MW of capacity, with 79% of its energy from renewable sources.
  • 8 Dec 2025: KIO opened QRO2 in Querétaro, adding 12 MW of IT capacity.
  • 25 Sep 2025: KIO announced more than US$400 million of regional capex and a second Guatemala data center next to GTM1 on Campus TEC Guatemala, up to 2 MW of IT load, which it says will quadruple its Guatemala capacity.

Company details checked against company and official sources, 22 Oct 2026.

  • Capacity under construction or planned (106 MW) is 5.5 times the operational base of 19.4 MW.
  • Its largest operational site is KIO QRO2 in El Marqués, Mexico at 12 MW.
  • The largest project in the pipeline is KIO QRO3 (100 MW, planned).
  • Mexico accounts for 98% of tracked capacity (14 facilities).
  • 5 facilities publish a PUE figure; the lowest is 1.70 at KIO MEX1 (KIO Networks) and the median is 1.70.
  • 6 of 19 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational19.4 MW
Under construction6 MW
Planned100 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Mexico123 MW
Guatemala2.4 MW

OperationalUnder construction or planned

KIO Networks development pipeline

Under construction and planned facilities with a stated capacity, largest first. 6 MW under construction and 100 MW planned in total.

ProjectLocationStatusTypeCapacity
KIO QRO3KIO Networks El Marqués, Mexico Planned Colocation 100 MW
KIO MEX8KIO Networks Mexico City, Mexico Under construction Colocation 4 MW
GTM 2KIO Networks Mixco, Guatemala Under construction Colocation 2 MW

Facilities

19 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
KIO QRO3Colocation El Marqués, Mexico Planned 100 MW total — Operator / official
KIO QRO2Colocation
History
  1. Operational
  2. Operational
  3. Operational
El Marqués, Mexico Operational 12 MW IT 2025 Operator / official
KIO QRO1Colocation El Marqués, Mexico Operational 7 MW IT — Operator / official
KIO MEX8Colocation
History
  1. Under construction
  2. Under construction
Mexico City, Mexico Under construction 4 MW IT — Operator / official
GTM 2Colocation
History
  1. Planned
  2. Announced
  3. Under construction
  4. Planned
Mixco, Guatemala Under construction 2 MW IT — Operator / official
GTM 1Colocation
History
  1. Operational
  2. Operational
Mixco, Guatemala Operational 0.4 MW — Operator / official
BOG 1Colocation Bogotá, Colombia Operational — — Operator / official
KIO HER1Colocation Hermosillo, Mexico Operational — — Operator / official
KIO MER1Colocation Mérida, Mexico Operational — — Operator / official
KIO MEX1Colocation Mexico City, Mexico Operational — — Operator / official
KIO MEX2Colocation Mexico City, Mexico Operational — — Operator / official
KIO MEX3Colocation Mexico City, Mexico Operational — — Operator / official
KIO MEX4Colocation Huixquilucan, Mexico Operational — — Operator / official
KIO MEX5Colocation Tultitlán, Mexico Operational — — Operator / official
KIO MEX6Colocation Lerma, Mexico Operational — — Operator / official
KIO MTY1Colocation San Pedro Garza García, Mexico Operational — — Operator / official
KIO MTY2Colocation Pesquería, Mexico Planned — — Operator / official
PAN 1Colocation
History
  1. Operational
  2. Operational
Arraiján, Panama Operational — — Operator / official
SDO 1Colocation Santo Domingo, Dominican Republic Operational — — Operator / official

Market position

How KIO Networks compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Mexico, KIO Networks ranks #3 of 10 tracked operators by capacity, with 8.3% of the country’s tracked MW.
  • Mexico has 37 tracked data centers from 10 operators: 179 MW operational and 1,306 MW under construction or planned.
  • In Guatemala, KIO Networks ranks #3 of 8 tracked operators by capacity, with 4.4% of the country’s tracked MW.

Data center operators in Mexico

Tracked facilities3710 operators
Operational capacity179 MW1,306 MW in the pipeline
KIO Networks rank by capacity#3of 10 operators · 8.3%
OperatorFacilitiesOperational MWPipeline MW
CloudHQ1—900 MW
ODATA474 MW300 MW
Ascenty381 MW—
Scala Data Centers65.1 MW2 MW
Equinix4——
Oracle2——
Microsoft1——
Google1——

All data centers in Mexico Power and policy in Mexico

Data center operators in Guatemala

Tracked facilities108 operators
Operational capacity2.9 MW52 MW in the pipeline
KIO Networks rank by capacity#3of 8 operators · 4.4%
Industrial power price84.5 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Aurum Equity Partners1—50 MW
IFX Networks12.5 MW—
Back Office Smart Solution (BOSS)2——
Loqui1——
Claro1——
Tigo1——
GBM1——

All data centers in Guatemala Power and policy in Guatemala

Data center operators in Dominican Republic

Tracked facilities22 operators
Operational capacity—— in the pipeline
KIO Networks rank by capacity#2of 2 operators
OperatorFacilitiesOperational MWPipeline MW
NAP Caribe1——

All data centers in Dominican Republic

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does KIO Networks operate?

DC Market Insights tracks 19 KIO Networks data center(s) in 5 countries as of November 2026: 15 operational, 2 under construction and 2 planned.

Where is KIO Networks headquartered?

KIO Networks is headquartered in Mexico. Ownership: Private; I Squared Capital has been a shareholder since 2022.

Which other companies operate data centers in Mexico?

Besides KIO Networks, the largest operators we track in Mexico by capacity are CloudHQ, ODATA, Ascenty, Scala Data Centers and Equinix. The Mexico page lists all 10 operators.

What rules apply to data centers in Mexico?

Our Power & Policy Tracker lists 17 government actions on data centers and power in Mexico, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst