HUMAIN Data Centers
Data centers operated by HUMAIN that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 1 data center operated by HUMAIN in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 0 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
HUMAIN data centers: key facts
- 0 of 1 facilities have a capacity stated by their source; the totals above count only those.
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| HUMAIN Riyadh SuperclusterHyperscale | Riyadh, Saudi Arabia | Under construction | — | — | Operator / official |
Market position
How HUMAIN compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Saudi Arabia, HUMAIN is one of 7 operators we track.
- Saudi Arabia has 8 tracked data centers from 7 operators: 24 MW operational and 584 MW under construction or planned.
- Riyadh also hosts 2 other tracked data center(s), run by Ezditek and center3.
- Our Deal Tracker lists 4 deal(s) naming HUMAIN, the latest on 1 November 2026.
Data center operators in Saudi Arabia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| DataVolt | 1 | — | 360 MW |
| Khazna Data Centers | 1 | — | 200 MW |
| Gulf Data Hub | 2 | 24 MW | — |
| Ezditek | 1 | — | 24 MW |
| Mobily | 1 | — | — |
| center3 | 1 | — | — |
All data centers in Saudi Arabia
Other data centers in Riyadh
Deals naming HUMAIN
- Saudi Aramco → HUMAIN (49%) M&A $2.64B
- HUMAIN; DataVolt → 100MW of a 360MW AI-ready data centre at Oxagon JV / partnership
- HUMAIN → HUMAIN AI data center project, Riyadh Power deal
- Together AI; HUMAIN → New 250MW AI data center in Saudi Arabia JV / partnership
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does HUMAIN operate?
DC Market Insights tracks 1 HUMAIN data center(s) in 1 country as of November 2026: 0 operational, 1 under construction and 0 planned.
Which other companies operate data centers in Saudi Arabia?
Besides HUMAIN, the largest operators we track in Saudi Arabia by capacity are DataVolt, Khazna Data Centers, Gulf Data Hub, Ezditek and Mobily. The Saudi Arabia page lists all 7 operators.
Which other data centers are in Riyadh?
Other tracked data centers in Riyadh include Ezditek RUH01 (Ezditek) and center3 Khurais Riyadh (center3).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.